July 20, 2006
REMODEL PROJECT FOR:
Mr. & Mrs. Bob Anker
10591 Coppergate
Carmel, Indiana
BUILDER:
Greg Smith Associates, Inc.
6515 N. Carrollton Ave.
Indianapolis, Indiana 46220
VALUE OF PROJECT:
$135,000.00 (+/-)
Project to consist of the following:
Kitchen renovation per plans and specifications
building
design
consulting
.
6515 north carrollton avenue
indianapolis. ind, 46220
255-7028 fax 255--8186
;'
00
MW HARRIS
AKHITfCTU~E & INTERIO~S
Anker Residence
Project Specifications
20 July 2006
Division 1 Demolition
1. Remove eXisting cabinetry, appliances, flooring, soffits, finishes, and light
fixtures in Kitchen and Bar as shown on drawings. Save appliances for
reinstallation as directed by Architect.
2. Remove existing floor covering at Dining Room, Entry, Hallways, Powder
Room, Storage Room 1 and 2, Family Room, and Breakfast Room as shown
on drawings.
3. Remove wall below existing window in Bar to allow for installation of new
door (Door #1).
4. Remove track lighting and fireplace mantle at Family Room.
Division 2 Sitework
5. None included.
Division 3 Concrete
6. None included.
Division 4 Masonry
7. Patching at new door to Bar as needed
Division 5 Metal
8. Custom stainless steel island countertop and mantle
Division 6 Wood and Plastics
9. Wood rough framing at new interior partitions
10. Wood rough framing at fireplace surround
11. Trim carpentry includes new door and window trims, baseboard.
Division 7 Thermal and Moisture Control
12.Sound insulation at existing second floor plumbing and new plumbing as
needed.
Division 8 Doors and Windows
13. Wood and glass door at existing window opening, Door #1: Jeld-Wen painted
aluminum full light french door pair, 7'-10" x 4'-0" opening.
31725039211~
317926 2895 ~I
PO BOX 4408.4
INDIANAPOLIS
,-
Anker Specification
20 July 2006, Page 2 of 2
Division 9 Finishes
14.Ceramic tile continuous backsplash at Kitchen
15.Glass mosaic tile at Bar column surrounds, soffit, and floor, and at fireplace
16.Stone or engineered stone countertops at Kitchen and Bar
17.Stained white oak floor, 5" planks, with 15" square stained walnut insets
1S.Painted gyp wall board typical at walls and ceilings
Division 10 Specialties - not used
Division 11 Equipment
19. Powder room fixtures to be purchased and installed: wall hung vanity, toilet
20. Kitchen appliances to be purchased and installed: Refrigerator, (2)
dishwashers, microwave, compactor, ice maker, cooktop, double wall ovens,
hood, wine cooler.
Division 12 Casework and Furnishings
21. New cabinetry at Kitchen and Bar by Neff (Conceptual Kitchens), installation
by Contractor.
Division 13 Special Construction - not used
Division 14 Conveying Systems - not used
Division 15 Mechanical
22.Attach all plumbing fixtures and kitchen appliances to existing utility service
Division 16 Electrical
23.Approximately ;15 new recessed can lights at locations of existing
24.Approximately 5 new pendant light locations
25.Approximately 20 linear feet of track lighting and fixtures
26. Relocate/add electrical receptacles as required
27. Power to all appliances.
Square Footage Estimates (all approximate - contractor to verify)
Kitchen and Bar renovation, major: 450sf
Interior renovation, minor: 250
New flooring, total including above areas: 2,225sf
-J.
;,'...
00
MW HARRIS
ARCHITECTURE & INTERIORS
Anker Residence
Project Specifications
20 July 2006
Division 1 Demolition
1. Remove existing cabinetry, appliances, flooring, soffits, finishes, and light
fixtures in Kitchen and Bar as shown on drawings. Save appliances for
reinstallation as directed by Architect.
2. Remove existing floor covering at Dining Room, Entry, Hallways, Powder
Room, Storage Room 1 and 2, Family Room, and Breakfast Room as shown
on drawings.
3. Remove wall below existing window in Bar to allow for installation of new
door (Door #1).
4. Remove track lighting and fireplace mantle at Family Room.
Division 2 Sitework
5. None included.
Division 3 Concrete
6. None included.
Division 4 Masonry
7. Patching at new door to Bar as needed
Division 5 Metal
8. Custom stainless steel island countertop and mantle
Division 6 Wood and Plastics
9. Wood rough framing at new interior partitions
10. Wood rough framing at fireplace surround
11. Trim carpentry includes new door and window trims, baseboard.
Division 7 Thermal and Moisture Control
12.Sound insulation at existing second floor plumbing and new plumbing as
needed.
Division 8 Doors and Windows
13. Wood and glass door at existing window opening, Door #1: Jeld-Wen painted
aluminum full light french door pair, 7'-10" x 4'-0" opening.
317 250 39211~
3179262895 If)
PO BOX 44084
INDIANAPOLIS
,...-...
~-.."':"
Anker Specification
20 July 2006, Page 2 of 2
Division 9 Finishes
14.Ceramic tile continuous backsplash at Kitchen
15.Glass mosaic tile at Bar column surrounds, soffit, and floor, and at fireplace
16.Stone or engineered stone countertops at Kitchen and Bar
17.Stained white oak floor, 5" planks, with 15" square stained walnut insets
is. Painted gyp wall board typical at walls and ceilings
Division 10 Specialties - not used
Division 11 Equipment
19. Powder room fixtures to be purchased and installed: wall hung vanity, toilet
20. Kitchen appliances to be purchased and installed: Refrigerator, (2)
dishwashers, microwave, compactor, ice maker, cooktop, double wall ovens,
hood, wine cooler.
Division 12 Casework and Furnishings
21. New cabinetry at Kitchen and Bar by Neff (Conceptual Kitchens), installation
by Contractor.
Division 13 Special Construction - not used
Division 14 Conveying Systems - not used
Division 15 Mechanical
22.Attach all plumbing fixtures and kitchen appliances to existing utility service
Division 16 Electrical
23.Approximately ;15 new recessed can lights at locations of existing
24.Approximately 5 new pendant light locations
25.Approximately 20 linear feet of track lighting and fixtures
26. Relocatejadd electrical receptacles as required
27. Power to all appliances.
Square Footage Estimates (all approximate - contractor to verify)
Kitchen and Bar renovation, major: 450sf
Interior renovation, minor: 250
New flooring, total including above areas: 2,225sf