Loading...
HomeMy WebLinkAboutCorrespondencePlan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 1 Planning Intake Joe Shestak 1/23/23 9:17 AM Comment Please upload the Concept Plan and the PUD with a different name. Please remove the date from each of the file names and just put the name of the file. Then you can use the same name for new files so that ProjectDox will recognize it as a new version and not as a different file. Responded by: Jon Dobosiewicz - 5/3/23 3:41 PM Updated plans and PUD draft have been submitted ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 1/23/23 11:35 AM I removed the two files and uploaded new files without dates or version identifiers. Resolved 2 1 Urban Forestry Daren Mindham 1/27/23 1:39 PM Changemark acreage Please note with the % and the specific acreage of that %. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 11/27/23 4:52 PM See updated PUD. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 5/3/23 3:42 PM Acres noted with clarification in PUD text Resolved 3 1 Urban Forestry Daren Mindham 1/27/23 1:39 PM Changemark common areas - open space The UDO requirement on open space has restrictions for what can count as open space. For example, the large transmission or gas easement only counts for 50% of the acreage toward open space if it is prairie grassed. Perimeter bufferyards only count as 50% as well. Please provide an open space plan with the acreages broken down vs the overall acreage according to our UDO requirements. Please note in Sec 5.1 that an open space plan and common area plan shall be provided. I would like the open space calculations to match the current UDO requirement methods so that the Plan Commission and staff can easily review for our standards. Andrews PUD Ordinance.pdf Responded by: Mike Timko - 11/5/24 7:08 AM Resolved per discussion with Christina Jesse ---------------------------------------------------------- Responded by: Rex Ramage - 1/4/24 3:37 PM In process. Kimley Horn to discuss with Urban Forester. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:52 PM See updated PUD. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 5/3/23 3:42 PM NJB - Please see the revised open space calculations on the Open Space Exhibit per the UDO requirements. Resolved REVIEW COMMENTS Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 4 1 Urban Forestry Daren Mindham 1/27/23 1:39 PM Changemark Open space/common area landscaping Please provide wording on how the special opportunity corridor (large easement) and common areas will be landscaped - prairie grass, trees, or just lawn. With that, please provide on the open space plan the ground cover breakdown of the common areas. Designed (lawn) open space, natural (no- mow) open space, tree preservation area, wetland or pond. See sample in the correspondence folder. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 11/27/23 4:52 PM See updated PUD. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 5/3/23 3:42 PM See red line for additional text Resolved 5 1 Urban Forestry Daren Mindham 1/27/23 1:39 PM Changemark A Landscape plan is required Please add similar wording to ensure a landscape plan is required. A. The Landscape Plan shall be submitted electronically (portable document format (PDF) or equivalent) and also on paper sheets not smaller than eleven (11) by seventeen (17) inches, and not larger than twenty-four (24) by thirty-six (36) inches. B. The Landscape Plan shall exhibit a design that is integral and coordinated with other corresponding improvements for the site and which clearly demonstrates the function, location, size and scale of plants in relation to buildings and other site improvements. I have added a sample PUD wording for the landscaping sections for your reference in the correspondence folder. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 11/27/23 4:52 PM See updated PUD. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 5/3/23 3:42 PM Landscape Plan text added. Resolved 6 1 Urban Forestry Daren Mindham 1/27/23 1:39 PM Changemark A Should this be A not B? Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 11/27/23 4:52 PM See updated PUD. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 5/3/23 3:43 PM Corrected. Resolved 7 1 Urban Forestry Daren Mindham 1/27/23 1:39 PM Changemark driveway spacing of street trees Streets shall be at least 10' from any driveway. Please add this wording. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 11/27/23 4:52 PM See updated PUD. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 5/3/23 3:43 PM wording added to required 10' spacing. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 8 1 Urban Forestry Daren Mindham 1/27/23 1:39 PM Changemark shall not may Please change may to shall. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 11/27/23 4:52 PM See updated PUD. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 5/3/23 3:43 PM changed. Resolved 9 1 Urban Forestry Daren Mindham 1/27/23 1:39 PM Changemark native vegetation areas Please add the special opportunity corridor (transmission line area) to this area. It is expected that this area be prairie grassed with native vegetation. The exotic invasive pears need to be removed. Andrews PUD Ordinance.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Please provide additional clarity to this comment. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:52 PM See updated PUD. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 5/3/23 3:43 PM The plan is to preserve the existing vegetationin this area. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 10 1 Urban Forestry Daren Mindham 1/27/23 1:39 PM Changemark salsbery landscape plan commitment I have uploaded the landscape plan with the commitment in the upper left of the plan. Can you add this buffer width and plant material quantity requirement to this PUD wording? Andrews PUD Ordinance.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM The commitmetn is enforcable by the City. A commitment made by a 3rd part do es not place an obligationon the Owner of this subject parcel. IF thereis an issue with enforcemetn we do nto want the City to come back on this owner as an obligationunder the PUD. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:52 PM See updated PUD. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 5/3/23 3:44 PM Reference is made to the commitment and compliance will be provided as part of the Primary Plat review. We do not prefer to include the commitment text in the PUD ordinance as it exists today and should be regulated via the commitment as it is an obligation of the adjacent owner. Resolved 11 1 Urban Forestry Daren Mindham 1/27/23 1:41 PM Changemark common area/open space plan Please show the tree preservation areas on the common area/open space plan as well. Andrews PUD Ordinance.pdf Responded by: Mike Timko - 11/5/24 7:08 AM Resolved per discussion with Christina Jesse ---------------------------------------------------------- Responded by: Rex Ramage - 1/4/24 3:37 PM In process. Kimley Horn to discuss with Urban Forester. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:52 PM See updated PUD. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 5/3/23 3:44 PM NJB - Please see the revised open space calculations on the Open Space Exhibit per the UDO requirements. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 12 1 Urban Forestry Daren Mindham 1/27/23 1:43 PM Changemark delete guidelines and replace with regulations If this shall regulate and maintained in accordance with then please reword and remove the word guidelines. Andrews PUD Ordinance.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Guidelines deleted. See updated text. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:53 PM See updated PUD. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 5/3/23 3:44 PM deleted. Resolved 13 1 Urban Forestry Daren Mindham 1/27/23 1:58 PM Changemark common area trees Please mention that common areas will be landscaped with trees. I don't mind how, # of trees per lots or acre is an option. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 11/27/23 4:53 PM See updated PUD. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 5/3/23 3:44 PM added # of trees per acre Resolved 14 1 Fire Carmel Fire 2/2/23 7:28 AM Comment Section 3310.1 Required Fire Department Vehicle Access. Approved Asphalt fire apparatus access roads shall be provided to and through the construction site during construction. Fire Apparatus access road must be capable of supporting the weight of fire apparatus and maintained clear at all times. Info Only 15 1 Fire Carmel Fire 2/2/23 7:28 AM Comment Section 3312.1 Fire Hydrants shall be fully functional tested and approved prior to any combustible materials arriving on the construction site. Info Only 16 1 Engineering Alex Jordan 2/6/23 7:48 PM Changemark Please verify that the detention was sized appropriately We would like a preliminary drainage report provided with the next submittal in order to verify that an appropriate amount of detention is planned for the site or if revisions will need to be made to the conceptual plan/PUD to accommodate the require amount. Color Site Plan.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:44 PM NJB - Please see the attached drainage memo. The wet detention pond has sufficient capacity. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 17 1 Engineering Alex Jordan 2/6/23 7:48 PM Changemark It does not appear that this was added to the conceptual plan Please revise the conceptual plan to show this vegetation as stated here. Andrews PUD Ordinance.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Vegetation will be added to the landscape plan, open space plan, or other plan as appropriate and will be included in the plat/development plan submittal. ---------------------------------------------------------- Reviewer Response: Alex Jordan - 11/30/23 10:01 AM This vegetation location is still not provided on the conceptual plan within the PUD or the separate conceptual plan uploaded into the site drawings folder. Please revise. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:48 PM See updated PUD. ---------------------------------------------------------- Reviewer Response: Alex Jordan - 5/8/23 2:39 PM We were still unable to locate this on the conceptual plan. Please revise. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 5/3/23 3:45 PM Plan revised. Resolved 18 1 Planning & Zoning Alexia Lopez 2/7/23 3:57 PM Library Comment Please provide a comparison chart of the PUD standards, the existing zoning district, and the closest matching zoning district. Responded by: Jon Dobosiewicz - 5/3/23 3:45 PM Submitted in Project Dox. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 19 1 Planning & Zoning Alexia Lopez 2/7/23 3:57 PM Library Comment Please submit a traffic memo and/or traffic impact analysis study. Please also provide a count for the number of vehicles using Wellswood Bend at the location between Gray Oaks Subdivision and Stafford Place Subdivision. Responded by: Rex Ramage - 1/4/24 3:37 PM Around the time of the contemplated switch from attached dwelling units to detached dwelling units, the change in trip generation and reduced dwelling units resulted in a nominal change in traffic. No new updated traffic memo is scheduled to be completed. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 11/30/23 10:48 AM I did not see the updated traffic memo that includes the traffic on Wellswood Bend. Please upload that. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:49 PM See updated PUD. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 6/1/23 10:33 AM Please upload the additional Traffic Memo you completed that includes traffic on Wellswood Bend. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 5/3/23 3:45 PM submitted via e-mail and project dox. Resolved 20 1 Engineering Alex Jordan 2/9/23 10:06 AM Changemark Please have this area striped to indicate how traffic should move through the connection The City Engineer would like this area to be striped so that it will be clear how traffic should move through the connection. He would like the existing cul-de-sac to act as an eyebrow off of the new north-south roadway. Color Site Plan.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:46 PM NJB - Eyebrow striping was added for the south connection. Resolved 21 1 Planning & Zoning Alexia Lopez 2/9/23 5:09 PM Changemark Change S-1 to R-1 The Property is currently zoned R-1. Please change this. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:46 PM Typo corrected Resolved 22 1 Planning & Zoning Alexia Lopez 2/9/23 5:09 PM Changemark No porch in setbacks Please remove porch from this definition. Anything under a roof should not extend into a setback. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:47 PM Removed. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 23 1 Planning & Zoning Alexia Lopez 2/9/23 5:09 PM Changemark Model Homes Please allow Model Homes only as a Temporary Use, similar to the UDO. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:47 PM Temporary use notation added. Resolved 24 1 Planning & Zoning Alexia Lopez 2/9/23 5:09 PM Changemark Sec 4.2.A.9 Add a comma after garage. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:47 PM Added comma. Resolved 25 1 Planning & Zoning Alexia Lopez 2/9/23 5:09 PM Changemark Sec. 4.2.B.9 Add a coma after garage. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:47 PM Added comma. Resolved 26 1 Engineering Alex Jordan 2/10/23 2:05 PM Changemark The City Engineer suggests that this median cut should be closed with this project Although this is Hamilton County right-of-way, the City Engineer believes that this median cut should be closed with this project. Color Site Plan.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:47 PM NJB - The entrance of the subdivision was relocated west away from the median in question. Resolved 27 1 Vectren Energy Chad Miller 2/13/23 9:14 AM Changemark CenterPoint Energy No comments on rezone. Color Site Plan.pdf Info Only 28 1 Planning & Zoning Alexia Lopez 2/14/23 2:43 PM Changemark Bicycle Parking Please insert Short-Term before Bicycle, to clarify this is for short-term bike parking per the definition in the UDO. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:47 PM short term added. Resolved 29 1 Planning & Zoning Alexia Lopez 2/14/23 2:46 PM Changemark Bike Parking locations Please don't limit your flexibility in the future for bike parking by limiting the number of locations to only 2 spots. Maybe you can require a minimum of 2 spots, but during the Primary Plat phase, if there turns out to be 3 good locations, let's allow for that flexibility. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:48 PM text revised per request Resolved 30 1 Planning & Zoning Alexia Lopez 2/14/23 2:49 PM Changemark Sec. 5.2 spelling Add an s at the end of provide. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:48 PM Corrected. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 31 1 Planning & Zoning Alexia Lopez 2/14/23 2:53 PM Changemark Development Plan Please change all Development Plan references to Primary Plat so there is no confusion about the process this subdivision will need to follow. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:48 PM Development Plan removed. Resolved 32 1 Planning & Zoning Alexia Lopez 2/14/23 3:00 PM Changemark Shade Trees in Front Yard Will there be room to plant a shade tree in the front yards of the townhomes? How much space between driveways will there be for a tree? Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:48 PM Adequate room is provided and if necessary a alternate location may be provided but number of trees is still required. Resolved 33 1 Planning & Zoning Alexia Lopez 2/14/23 3:28 PM Changemark Southern Perimeter Buffer Yd Plantings Please also require plantings within this southern bufferyard to meet a Level C Bufferyard as described in the UDO. Existing vegetation may be applied toward a Bufferyard per the standards in the UDO. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:49 PM Level C requirement added. Resolved 34 1 Planning & Zoning Alexia Lopez 2/14/23 3:42 PM Changemark Internal Street ROW Please require a minimum 56 ft. ROW or reference the UDO for Townhouse or Residential Subdivision Design Standards for the Minimum ROW for the internal streets. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:49 PM Added 56' and this si r-o-w a shown on plans. Resolved 35 1 Planning & Zoning Alexia Lopez 2/14/23 3:43 PM Changemark Sidewalks on both sides of a street Please specify that sidewalks shall be required along BOTH sides of all internal streets. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:49 PM both sides required as revised Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 36 1 Planning & Zoning Alexia Lopez 2/14/23 3:45 PM Changemark Pond Overlook Can you add some sort of pond overlook or deck as an amenity for the residents to be able to enjoy the pond. Concept Plan - PUD.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Please see updated site plan. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 11/30/23 3:22 PM I did not see this labeled on the concept plan or required in the PUD. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:49 PM See updated PUD. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 5/11/23 1:25 PM Please label this on the concept plan and add this as a requirement to the PUD. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 5/3/23 3:49 PM NJB - A landing area is shown near the northwest corner of the detention pond. Resolved 37 1 Planning & Zoning Alexia Lopez 2/14/23 3:47 PM Changemark Common Area Sidewalk Trees Does this requirement for 1 tree per 50 ft of lineal sidewalk only apply to the sidewalks in the common areas? Not in the ROW? Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:49 PM Yes Resolved 38 1 Planning & Zoning Alexia Lopez 2/14/23 3:48 PM Changemark Common Area Minimum Plantings Please add a minimum number of trees to be planted in the common areas. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:49 PM added 10 trees minimum per acre. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 39 1 Planning & Zoning Alexia Lopez 2/14/23 4:05 PM Changemark Common Area Rquirements Please reference the UDO and require the minimum 25 percent open space to meet the requirements of UDO Sec. 7.19 G. Andrews PUD Ordinance.pdf Reviewer Response: Alexia Lopez - 6/1/23 11:06 AM This was changed to a minimum 15% open space since it is considered a townhome subdivision. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 5/3/23 3:50 PM percent modified and this section revised. Resolved 40 1 Building & Code Services William Hohlt 2/14/23 4:15 PM Comment Please indicate where the model homes will be located on the site. Keep in mind that these units shall be accessible per chapter 11 of the IBC Responded by: Jon Dobosiewicz - 11/27/23 4:48 PM See updated PUD. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 5/3/23 3:50 PM Model will be located in units on either side of main entry drive and across the street from main entrance for two-family. Accessibility note acknowledged Resolved 41 1 Planning & Zoning Alexia Lopez 2/14/23 4:25 PM Changemark Western Perimeter Buffer Width Can you increase the western perimeter buffer width to 15 ft. so that it will match the width in the Commitment by Salsbery Brothers? Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:50 PM NJB - Western Perimeter revised to 15' on the concept plan exhibit Resolved 42 1 Planning & Zoning Alexia Lopez 2/14/23 4:31 PM Changemark 6 Unit Elevation Please provide a front and rear elevation of a 6 unit building. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 11/27/23 4:49 PM See updated PUD. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 5/11/23 1:37 PM I did not see additional elevations in the PUD that show a 6 unit building. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 5/3/23 3:51 PM see additional elevations in PUD Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 43 1 Planning & Zoning Alexia Lopez 2/14/23 4:35 PM Changemark Enhanced Side Elevation The enhanced side elevation should be the standard side elevation. Please require all buildings to have this masonry wainscot so that the materials on the front are carried around to the side and rear and to break up the large expanse of siding on the rear. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:51 PM revised as requested Resolved 44 1 Planning & Zoning Alexia Lopez 2/14/23 4:37 PM Changemark Rear Elevations Please upload an example of what an elevation would look like without any interior gables for a 5 and 6 unit building. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 11/27/23 4:49 PM See updated PUD. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 6/1/23 12:01 PM Please submit this drawing for review. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 5/3/23 3:52 PM Exhibit under review. Resolved 45 1 Planning & Zoning Alexia Lopez 2/14/23 4:38 PM Changemark Rear Elevations Wainscot Please require a masonry wainscot on all rear elevations to promote 4-sided architecture. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:52 PM revised as requested. Resolved 46 1 Planning & Zoning Alexia Lopez 2/14/23 5:01 PM Changemark Ex. G Sec. II.B.2 Please change this to require a brick wainscot around all sides of all buildings. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:52 PM revised as requested Resolved 47 1 Planning & Zoning Alexia Lopez 2/14/23 5:03 PM Changemark Monotony Mitigation Require a minimum of 3 masonry colors across the development please. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:53 PM revised as requested. Resolved 48 1 Planning & Zoning Alexia Lopez 2/14/23 5:06 PM Changemark Masonry Waincot Please require a masonry wainscot to be the same masonry material on all sides of a building. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:53 PM revised as requested. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 49 1 Planning & Zoning Alexia Lopez 2/14/23 5:09 PM Changemark Secondary Roof Pitch Please double check your existing product types and make sure all secondary or accent roof planes can meet this 4:12 slope. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:53 PM revised to 3:12 Resolved 50 1 Planning & Zoning Alexia Lopez 2/14/23 5:12 PM Changemark Shutters Also require appropriate sizing so that the shutters can be functional or appear functional. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:53 PM revised as requested Resolved 51 1 Transportation Systems David Littlejohn 2/14/23 9:59 PM Changemark Bicycle parking requirement Revise this section to comply with the City's UDO requirements for the number and locations of the bicycle parking spaces. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 11/27/23 4:52 PM See updated PUD. ---------------------------------------------------------- Reviewer Response: David Littlejohn - 5/17/23 3:32 PM Please show and label where all of the bicycle parking location are proposed on the concept plan. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 5/3/23 3:53 PM revised as requested Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 52 1 Transportation Systems David Littlejohn 2/14/23 10:04 PM Changemark ADA compliant crosswalks at intersections Please revise the concept plan to show sidewalks connecting to the intersections to ensure that ADA compliant crosswalks will be included at all of the intersections throughout the site. Andrews PUD Ordinance.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM We can update, but does showing striped crosswalks lock us in to striping the pavement during development? We would not want to stripe, but we will provide the ADA ramps. ---------------------------------------------------------- Reviewer Response: David Littlejohn - 12/1/23 2:10 PM The revised concept plan does not show sidewalks connecting to intersections. Revise the concept plan to show sidewalks connecting to the intersections to ensure that ADA compliant crosswalks will be included at all of the intersections throughout the site. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:52 PM See updated PUD. ---------------------------------------------------------- Reviewer Response: David Littlejohn - 5/17/23 3:16 PM The new proposed concept plan has additional intersections that need to include ADA compliant crosswalks. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 5/3/23 3:53 PM NJB - Crosswalk striping added to the concept plan at intersections within the development. Resolved 53 1 Sign Permits Aliza Shalit 2/15/23 9:51 AM Comment Please Add Signage section stating that Sign Standards for the PUD will meet UDO Section 5.39 - Sign Standards. Responded by: Jon Dobosiewicz - 5/3/23 3:54 PM revised as requested. Resolved 54 1 Planning & Zoning Alexia Lopez 2/15/23 4:32 PM Changemark Townhome Porch Size Please add a requirement that porches shall be a minimum of 6 ft. deep and 30 sq. ft. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:54 PM revised as requested. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 55 1 Planning & Zoning Alexia Lopez 2/15/23 4:53 PM Changemark Townhouse Architectural Style What architectural style would you classify the townhomes as? Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:54 PM The architecture of the dwellings does not follw any specific architectural style. Resolved 56 1 Planning & Zoning Alexia Lopez 2/15/23 4:53 PM Changemark Two-Family Architectural Style What Architectural Style would you classify the two-family dwellings as? Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:54 PM The architecture of the dwellings does not follw any specific architectural style. Resolved 57 1 CrossRoad Engineers Willie Hall 2/16/23 5:15 PM Comment Please provide preliminary detention calculations to verify pond size shown on PUD is sized adequately. Reviewer Response: Willie Hall - 5/9/23 9:15 AM Comment is resolved with the understanding that during full plan review, the site will be held to the 0.1/0.3 cfs release rates. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 5/3/23 3:54 PM NJB - Please refer to the drainage memo for HydroCAD sizing of the pond. Resolved 58 1 Planning & Zoning Alexia Lopez 2/20/23 11:41 AM Changemark Two-Family Dwelling Second story Is this considered a second story or a half story? If not, please change the PUD so that a window is required in this area. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:54 PM As written if there is living area above the first floor a window would be required on the side elevation on that space. Resolved 59 1 Planning & Zoning Alexia Lopez 2/20/23 11:43 AM Changemark No Blackout Windows Please add a requirement to the Architectural Standards that windows shall not be blackout windows. Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:55 PM revised as requested for both dwelling types Resolved 60 1 Planning & Zoning Alexia Lopez 2/20/23 11:48 AM Changemark Stub street to west Please provide a stub street to the property to the west. This could be in the location shown or further south so that it would line up with Queensborough Dr. Concept Plan - PUD.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:55 PM NJB - A stub street was added to the west. Please see revised concept plan. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 61 1 Planning & Zoning Alexia Lopez 2/20/23 11:52 AM Changemark Perimeter Buffer yards and Landscaping Please add a section to require perimeter landscaping along the north perimeter per UDO Sec. 7.23.F Andrews PUD Ordinance.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:55 PM added as requested to meet Buffer "C" planting standards. Resolved 62 1 Planning & Zoning Alexia Lopez 2/20/23 12:05 PM Changemark Loop path in Common Area Please continue the path in the common area to connect back to the sidewalk at the street to create a looped walking path. Concept Plan - PUD.pdf Responded by: Jon Dobosiewicz - 5/3/23 3:55 PM NJB - With the entrance relocation, the sidewalk stub to the common area was removed and sidewalks were added to both sides of the proposed entrance. See revised concept plan. Resolved 63 2 Urban Forestry Daren Mindham 5/4/23 3:05 PM Changemark Sec 5.1 delete wording Replace with: within the project site Andrews PUD 8 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Replacemetn made ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:53 PM See updated PUD. Resolved 64 2 Urban Forestry Daren Mindham 5/4/23 3:05 PM Changemark Sec 5.1.B transmission line comments The transmission line easement area SHALL... add the word shall. The Open Space calculation will not include areas of the right of way. Please add wording to note...shall include all PARCELED AREAS of the transmission line easement. or something that delineates that description better. Andrews PUD 8 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Added Shall and excluded right-of-way ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:53 PM See updated PUD. Resolved 65 2 Urban Forestry Daren Mindham 5/4/23 3:05 PM Changemark Sec 5.2.B planting beds Please describe the estimated sizes of the planting beds. Are they 1' by 2' or 10' by 30' or is it better to note the total square footage of garden space? Andrews PUD 8 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Approximated size of plantign beds added. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:53 PM See updated PUD. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 66 2 Urban Forestry Daren Mindham 5/4/23 3:05 PM Changemark Sec 6.3.C.1 remove sentence I understand the desire to put that sentence in there but that is not a rule or requirement statement. Andrews PUD 8 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Sentence deleted. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:53 PM See updated PUD. Resolved 67 2 Urban Forestry Daren Mindham 5/4/23 3:05 PM Changemark Sec 6.3.C.1 ; and Is it best to add (;and) at the end of 6.2.C.1.? I want to clarify that that C.1 does not count toward the requirement of C.2. Andrews PUD 8 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM assed text that 10 trees per acre is in addition ot street trees along common areas. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:53 PM See updated PUD. Resolved 68 2 Urban Forestry Daren Mindham 5/4/23 3:05 PM Changemark Sec 6.3.C.2 reword sentence Change to: A minimum of the (10) new native shade trees per acre shall be provided in common areas. The way its worded, any of the existing perimeter preservation trees would negate any new plantings. Andrews PUD 8 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM reworded as requested. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:53 PM See updated PUD. Resolved 69 2 Urban Forestry Daren Mindham 5/4/23 3:05 PM Changemark Sec 6.3.E.4 southern perimeter Please spell out the requirements for level C. 30' width, with 6 shade trees, 1 ornamental tree and 15 shrubs per 100 linear feet. If the UDO changes, it only confuses future review of the project when you quote it. Andrews PUD 8 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM specific text added as requested. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:53 PM See updated PUD. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 70 2 Urban Forestry Daren Mindham 5/4/23 3:05 PM Changemark Sec 6.3.E.3 Please spell out the requirements. 75' width, with 6 shade trees, 1 ornamental tree and 15 shrubs per 100 linear feet. If the UDO changes, it only confuses future review of the project when you quote it. Andrews PUD 8 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM 50' width with plantings as noted added. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:53 PM See updated PUD. Resolved 71 2 Urban Forestry Daren Mindham 5/4/23 3:05 PM Changemark Sec 6.4 concept vs open space The concept plan tree preservation areas and possible other notations do not match the open space plan. Please review both for consistency. Andrews PUD 8 050323.pdf Responded by: Mike Timko - 11/5/24 7:08 AM Resolved per discussion with Christina Jesse ---------------------------------------------------------- Responded by: Rex Ramage - 1/4/24 3:37 PM In process with Kimley Horn. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:53 PM See updated PUD. Resolved 72 2 Urban Forestry Daren Mindham 5/4/23 3:37 PM Changemark Sidewalk to curb right of way Please remove ALL right of way from any open space calculations and highlighting. It doesn't meet the definition of common area and is to be city property. Open Space Exhibit.pdf Responded by: Jon Dobosiewicz - 11/27/23 4:53 PM See updated PUD. Resolved 73 2 Urban Forestry Daren Mindham 5/4/23 3:37 PM Changemark UDO required perimeter bufferyard The UDO only required perimeter bufferyard is along 146th St. However, this is the only side of the project you don't note as a bufferyard. The UDO requires a 75' bufferyard and this area shall only count at 50% toward the open space calculation. Please show and label the 75' width and note that its only counted at 50% in the site summary. The transmission easement can supersede the bufferyard as when labeled. Open Space Exhibit.pdf Responded by: Jon Dobosiewicz - 11/27/23 4:53 PM See updated PUD. Resolved 74 2 Urban Forestry Daren Mindham 5/4/23 3:37 PM Changemark transmission easement The transmission easement per the UDO shall only count at 50% toward the open space calculations. Please show this in the site summary and ensure that the easement width is labeled and is not shown within the right of way. Open Space Exhibit.pdf Responded by: Jon Dobosiewicz - 11/27/23 4:53 PM See updated PUD. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 75 2 Urban Forestry Daren Mindham 5/4/23 3:37 PM Changemark bufferyard overlapping tree preservation area I would prefer to show this area as all tree preservation area. I would like to see a straight mower line long term vs an in and out swerve to the mowing. Can this area be colored and hatched to show that it is both a PUD bufferyard and tree preservation area? Open Space Exhibit.pdf Responded by: Jon Dobosiewicz - 11/27/23 4:53 PM See updated PUD. Resolved 76 2 Urban Forestry Daren Mindham 5/4/23 3:37 PM Changemark Open Space calculations Can you put the calculations in acreage as that is the measurement used in the PUD wording? Please note and calculation the north perimeter bufferyard and transmission line easement at 50% per our city open space calculation standard. Please remove the right of way areas from the calculations. Please note the overall total site acreage. Would the drainage area in the SE corner meet the open space requirements of the PUD to be counted? If so, please add that acreage and a legend of this area as blue (water) see UDO 7.19.G The east perimeter wording in the PUD states a 10' buffer; however, you are showing a wider area of tree preservation the open space plan. Are you committing to a larger bufferyard? For the sake of calculations, please only show what is required per the PUD. If you preserve more than that during development that is great, but I would only show what can be saved per the PUD and engineering of the site for this open space calculation.. Open Space Exhibit.pdf Responded by: Mike Timko - 11/5/24 7:08 AM Resolved per discussion with Christina Jesse ---------------------------------------------------------- Responded by: Rex Ramage - 1/4/24 3:37 PM In processwith Kimley Horn. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:53 PM See updated PUD. Resolved 77 2 Urban Forestry Daren Mindham 5/4/23 3:37 PM Changemark fix name Please change name to Andrews PUD Open Space Exhibit.pdf Responded by: Jon Dobosiewicz - 11/27/23 4:53 PM See updated PUD. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 78 2 Planning & Zoning Alexia Lopez 5/10/23 5:24 PM Changemark R-1 Lot Width R-1 only requires a 100 ft. lot width. Andrews PUD - Zoning Comparison Chart 042023.pdf Responded by: Mike Timko - 11/5/24 7:07 AM Resolved per discussion with Christina Jesse ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 1/16/24 10:49 AM please provide the updated Zoning Comparison chart. ---------------------------------------------------------- Responded by: Rex Ramage - 1/4/24 3:37 PM Will update. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 12/6/23 9:37 AM Please update zoning comparison chart ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:49 PM See updated PUD. UnResolved 79 2 Planning & Zoning Alexia Lopez 5/10/23 5:24 PM Changemark R-1 Open Space R-1 typically would require 25% open space. Please change this in the Zoning Comparison Chart. Andrews PUD - Zoning Comparison Chart 042023.pdf Responded by: Mike Timko - 11/5/24 7:07 AM Resolved per discussion with Christina Jesse ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 1/16/24 10:50 AM please provide the updated Zoning Comparison chart. ---------------------------------------------------------- Responded by: Rex Ramage - 1/4/24 3:37 PM Will update. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 12/6/23 9:37 AM Please update zoning comparison chart ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:49 PM See updated PUD. UnResolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 80 2 Planning & Zoning Alexia Lopez 5/11/23 5:37 PM Changemark Show Native Vegetation on Concept Plan The PUD references native vegetation as illustrated on the Concept Plan, but I do not see any hatching for native vegetation along the pond. Please add this to the Concept plan. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Vegetation will be added to the landscape plan, open space plan, or other plan as appropriate and will be included in the plat/development plan submittal. We will remove the reference in the PUD text. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 11/30/23 3:38 PM This comment has not been addressed. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:50 PM See updated PUD. Resolved 81 2 Transportation Systems David Littlejohn 5/17/23 3:18 PM Changemark ADA compliant crosswalks at all intersections v 2 Please revise the concept plan to show sidewalks connecting to the intersections to ensure that ADA compliant crosswalks will be included at all of the intersections throughout the site. Concept Plan Exhibit.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM We can update, but does showing striped crosswalks lock us in to striping the pavement during development? We would not want to stripe, but we will provide the ADA ramps. ---------------------------------------------------------- Reviewer Response: David Littlejohn - 12/1/23 2:09 PM The revised concept plan does not show sidewalks connecting to intersections. Revise the concept plan to show sidewalks connecting to the intersections to ensure that ADA compliant crosswalks will be included at all of the intersections throughout the site. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:52 PM See updated PUD. Resolved 82 2 Planning & Zoning Alexia Lopez 6/1/23 10:42 AM Changemark Rear Yard Setback Measurement Please keep the rear yard setback to be measured from the property line. This will stay consistent with current standards. If you want a greater setback for the south lots, then add a buffer requirement or some other standard. Andrews - red line PUD 050323.pdf Responded by: Jon Dobosiewicz - 11/27/23 4:51 PM See updated PUD. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 83 2 Planning & Zoning Alexia Lopez 6/1/23 10:45 AM Changemark Side yard setback for duplexes Please add a minimum 5 ft. side yard setback for the non-attached sides, so that no building can be closer than 5 ft. to a property line. This should align better with state code. Andrews - red line PUD 050323.pdf Responded by: Jon Dobosiewicz - 11/27/23 4:51 PM See updated PUD. Resolved 84 2 Planning & Zoning Alexia Lopez 6/1/23 11:00 AM Changemark Side Yard Setback for Townhome Bldg. Please add a minimum 5 ft. side yard setback for the non-attached sides, so that no building can be closer than 5 ft. to a property line. This should align better with state code. Andrews - red line PUD 050323.pdf Responded by: Jon Dobosiewicz - 11/27/23 4:51 PM See updated PUD. Resolved 85 2 Planning & Zoning Alexia Lopez 6/1/23 11:01 AM Changemark Max Lot Coverage Townhomes and Duplexes Please add some sort of maximum lot coverage to keep yard spaces as green space and not allow them to become impervious surfaces like patios or something. Andrews - red line PUD 050323.pdf Responded by: Jon Dobosiewicz - 11/27/23 4:51 PM See updated PUD. Resolved 86 2 Planning & Zoning Alexia Lopez 6/1/23 11:20 AM Changemark Sec.6.3.C.2 Trees in Common Areas Please change this to require a minimum of 10 new trees to be planted per acre of common area. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Please see updated PUD. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 11/30/23 10:49 AM This was not updated in the PUD. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:51 PM See updated PUD. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 87 2 Planning & Zoning Alexia Lopez 6/1/23 11:24 AM Changemark Internal Street ROW After further consideration, please take a look at providing a reduced Right- of-way for internal streets to help naturally slow down traffic and discourage cut-through traffic. Please analyze the woonerf street concept and see how you could accomodate that within your subdivision design. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Carmel Engineering is not supportive of a reduced ROW/street width. Petitioner has included a provision for a speed bump - see updated PUD. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 11/30/23 10:50 AM I did not see an update to this in the PUD. Please reduce the street right-of-way and street pavement. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:51 PM See updated PUD. Resolved 88 2 Planning & Zoning Alexia Lopez 6/1/23 11:45 AM Changemark Sec. 8.3.B Paths in Common Areas I do not see any paths in the common areas on the new concept plan. Please show where these paths will be. Andrews - red line PUD 050323.pdf Reviewer Response: Alexia Lopez - 12/6/23 9:39 AM These paths were removed with the new layout. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:51 PM See updated PUD. Resolved 89 2 Planning & Zoning Alexia Lopez 6/1/23 11:47 AM Changemark Sec. 8.3.C Community Area Community Area is capitalized here. Please provide a definition for this term. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM No longer defining, will revise the PUD text. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 12/6/23 9:42 AM The PUD has not been updated to address this comment. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:51 PM See updated PUD. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 90 2 Planning & Zoning Alexia Lopez 6/1/23 11:51 AM Changemark Community Garden Please add that a water source at the Community Garden will be provided. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Please see updated PUD. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 11/30/23 3:40 PM This comment has not been addressed. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:51 PM See updated PUD. Resolved 91 2 Planning & Zoning Alexia Lopez 6/1/23 12:04 PM Changemark Architectural Standards Masonry Wainscot Please add wording for the Single-family attached architectural standards to require the same masonry wainscot used on the front elevation to wrap around to the side and the rear of the unit. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Please see updated PUD. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 11/30/23 3:43 PM This comment has not been addressed. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:51 PM See updated PUD. Resolved 92 2 Planning & Zoning Alexia Lopez 6/1/23 12:11 PM Changemark Exhibit H Sec.2.A.2 Masonry Wainscot Insert wainscot after front. The material used as the wainscot along the base of the dwelling on the front of the building should continue to the side and rear. For example, if a stone wainscot is used on the front and brick is used above the stone wainscot, brick should not be used as the wainscot material along the side and rear. The stone base should wrap around all sides of the dwelling or a brick wainscot should be used on the front and wrap around all sides. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Please see updated PUD. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:51 PM See updated PUD. Resolved 93 2 Planning & Zoning Alexia Lopez 6/1/23 12:12 PM Changemark Strike this last part of the standard. Andrews - red line PUD 050323.pdf Responded by: Jon Dobosiewicz - 11/27/23 4:51 PM See updated PUD. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 94 2 Planning & Zoning Alexia Lopez 6/1/23 12:18 PM Changemark Ex. H Sec.H.1 Correction In the last sentence please change the to they and remove function of after the. Andrews - red line PUD 050323.pdf Responded by: Jon Dobosiewicz - 11/27/23 4:51 PM See updated PUD. Resolved 95 2 Planning & Zoning Alexia Lopez 6/1/23 12:24 PM Changemark Northern Perimeter Bufferyard Please also require a minimum width for the northern perimeter bufferyard, like you did for the other bufferyards. Per the UDO this should be 75 ft. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Please see updated PUD. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 11/30/23 3:44 PM This comment has not been addressed, but I believe it should be 50 ft. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:52 PM See updated PUD. Resolved 96 2 Planning & Zoning Alexia Lopez 6/1/23 1:44 PM Changemark Architectural Standards Elevation Definition Add some wording to clarify what would make a different elevation. For instance, a change in building material or porch columns would not make it a different elevation. To be different, the elevation would need to have changes in the form by altering the roof type or pitch, porch placement, or dormer type or location. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Please see updated PUD. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 11/30/23 3:46 PM This comment has not been addressed. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:52 PM See updated PUD. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 97 2 Planning & Zoning Alexia Lopez 6/1/23 2:15 PM Changemark Townhome Side Setback on a corner lot Please specify a minimum setback for the side of a townhome building on a corner lot. Per the UDO any side of a building adjacent to the street is a front yard. Would these townhomes follow the front yard setbacks on both sides adjacent to a street? Or do you want a different setback for a side yard? Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM No longer applicable. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 12/6/23 9:49 AM Please update the current PUD with this standard as well so that the front setback applies to any facade adjacent to a street. ---------------------------------------------------------- Responded by: Jon Dobosiewicz - 11/27/23 4:52 PM See updated PUD. Resolved 98 3 Carmel_Clay Parks Michael Klitzing 11/29/23 3:42 PM Comment Would like to see preservation of the more of the existing mature trees versus development of new turf areas. Based on GIS, appears the greatest concentration of the largest trees are towards the northeast corner of the project and around existing house in southwest corner. Responded by: Rex Ramage - 1/4/24 3:37 PM Updated Open Space plan to be resubmitted by 1/5/24 Resolved 99 3 Planning & Zoning Alexia Lopez 11/29/23 4:05 PM Changemark Open Space Calculation Is this open space calculation correct? It doesn't meet the minimum 25% required in the UDO. Andrews - red line PUD 050323.pdf Reviewer Response: Alexia Lopez - 1/16/24 3:32 PM PUD was revised to require 25% open space. Thank you. ---------------------------------------------------------- Responded by: Rex Ramage - 1/4/24 3:37 PM We are working to verify this and will update. Resolved 100 3 Planning & Zoning Alexia Lopez 11/30/23 10:02 AM Changemark 12 acres Open Space I think this number is incorrect. Please double check and mark the correct acreage of open space for this parcel. Concept Plan Exhibit.pdf Responded by: Mike Timko - 11/5/24 7:07 AM Resolved per discussion with Christina Jesse ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 1/16/24 4:16 PM Please update this number on the central common area so it is less confusing. If you want to show the acreage, please just list the acreage for that common area. ---------------------------------------------------------- Responded by: Rex Ramage - 1/4/24 3:37 PM We are working to verify this and will update. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 101 3 Planning & Zoning Alexia Lopez 11/30/23 10:02 AM Changemark Open Space acreage Please mark the acreage for each common area/open space parcel. Concept Plan Exhibit.pdf Responded by: Mike Timko - 11/5/24 7:07 AM Resolved per discussion with Christina Jesse ---------------------------------------------------------- Responded by: Rex Ramage - 1/4/24 3:37 PM We are working to verify this and will update. Resolved 102 3 Planning & Zoning Alexia Lopez 11/30/23 10:06 AM Changemark Section 5.2.B Community Garden Please add a watering spigot or source for clean water or something similar to the list of items that shall be included at the Community Garden. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Please see updated PUD, also addresses comment #90. Resolved 103 3 Planning & Zoning Alexia Lopez 11/30/23 10:09 AM Changemark Section 6.1.A Landscape Pan Submittal I don't think we need paper copies. You can remove this wording. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Will remove for next PUD update. Resolved 104 3 Engineering Alex Jordan 11/30/23 10:16 AM Comment Please confirm that the drainage summary provided will still apply to the site following the switch to all single family residences. If not, please provide a revised summary for the new proposal. Responded by: Rex Ramage - 1/4/24 3:37 PM Confirmed, however an updated drainage report will be submitted with the plat/development plan to reflect any modifications to the plan. Resolved 105 3 Planning & Zoning Alexia Lopez 11/30/23 10:26 AM Changemark Section 6.3.A Street Trees Please change this requirement to better align with the UDO. Please require a maximum spacing between street trees of 50 ft. and a minimum of 25 feet. instead of only requiring 1 per lot. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Please see updated PUD. Resolved 106 3 Planning & Zoning Alexia Lopez 11/30/23 10:36 AM Changemark Stub Street to the east Per UDO Article 7.25.E.3 please add a stub street connection to the east. This will provide a connection if the land to the east develops or it will provide a connection to the County off ramp instead of making people go to 146th St. or through Gray Oaks. Concept Plan Exhibit.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Stub street has been added. Resolved 107 3 Planning & Zoning Alexia Lopez 11/30/23 10:40 AM Changemark Duplex or Accessory Dwelling Please make these corner units into duplex units to provide variety in the neighborhood and then a front facade can face both streets. Or, allow accessory dwellings in this neighborhood and build these lots with the accessory dwellings already attached, like an in-laws quarters. Concept Plan Exhibit.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM No longer applicable. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 108 3 Planning & Zoning Alexia Lopez 11/30/23 10:42 AM Changemark Accessory Dwellings Please add accessory dwellings as a permitted use. This would allow things like an in-laws quarters. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Please see updated PUD. Resolved 109 3 Planning & Zoning Alexia Lopez 11/30/23 10:48 AM Changemark Plant 10 new trees per acre Please change this to require a minimum of 10 new trees to be planted per acre of common area. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Please see updated PUD. Resolved 110 3 Planning & Zoning Alexia Lopez 11/30/23 10:57 AM Changemark 6.3.E.3 Northern Perimeter Bufferyard Please require a minimum of 50 ft. of bufferyard width for the northern perimeter per the UDO 6.09 standards Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Please see updated PUD. Resolved 111 3 Planning & Zoning Alexia Lopez 11/30/23 10:58 AM Changemark Updated Open Space Exhibit Please provide an updated open space exhibit, similar to the one you submitted for the previous layout. Concept Plan Exhibit.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM In process. Resolved 112 3 Planning & Zoning Alexia Lopez 11/30/23 1:44 PM Changemark Concept Plan Site Summary The Site Summary says 53% open space, but the PUD says a minimum of 23%. Which is correct? Please adjust the plans as necessary. Concept Plan Exhibit.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM In process. Resolved 113 3 Planning & Zoning Alexia Lopez 11/30/23 2:08 PM Changemark Proposed zoning The proposed zoning on the Site summary says R-3. Should that say PUD? Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Will remove for next submittal. Resolved 114 3 Planning & Zoning Alexia Lopez 11/30/23 2:11 PM Changemark 3rd car Garage Offset Please require that the third car bay is on the end of the home and is setback the 2 ft. Instead of in the middle of the home. Or even the 2 bays could be on the end and setback as well. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Single-car garage bay must be interior. Discussed through Committee process. Resolved 115 3 Planning & Zoning Alexia Lopez 11/30/23 2:28 PM Changemark Alley Access There is no more alley access, correct? Please revise accordingly. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Will update for next PUD submittal. Resolved 116 3 Planning & Zoning Alexia Lopez 11/30/23 2:31 PM Changemark Ex D Sec. 2.C.1 Front Building Materials Does the brick or stone wainscot count as compliance to Sec. 2.C.1 or is the masonry material above and beyond the wainscot? It is unclear the way it is written and could be misinterpreted. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Please see updated PUD. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 117 3 Planning & Zoning Alexia Lopez 11/30/23 2:34 PM Changemark Capitalized words Building Materials and Masonry Material are both capitalized. Please define these or make them lower case. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Will update for next PUD submittal. Resolved 118 3 Planning & Zoning Alexia Lopez 11/30/23 2:36 PM Changemark Insert And I think you need to insert AND in between facade and shall in this sentence. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Not sure of the reference. If not corrected in the next resubmittal, then please specify the section reference. Resolved 119 3 Planning & Zoning Alexia Lopez 11/30/23 2:47 PM Changemark Add a minimum window size Add a minimum window size for the windows to count toward the minimum required. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Please see the updated PUD. Resolved 120 3 Planning & Zoning Alexia Lopez 11/30/23 2:50 PM Changemark Rear building facades with red dot Is the only material variation in Exhibit C for the red dots a masonry wainscot? Is so, please add wording to require a masonry wainscot on those rear facades. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Please see the updated PUD. Resolved 121 3 Planning & Zoning Alexia Lopez 11/30/23 2:51 PM Changemark primary/main roof Please define primary and secondary roofs so there is no confusion when submitting building permits. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Please see the updated PUD. Resolved 122 3 Planning & Zoning Alexia Lopez 11/30/23 2:52 PM Changemark 3 floor plans Please increase to require more floor plans to ensure more variety. Perhaps 6 floor plans? Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Please see the updated PUD. Through the Committee process, we landed on 3 floor plans with a minimum of 4 elevations each. Resolved 123 3 Planning & Zoning Alexia Lopez 11/30/23 2:56 PM Changemark Architectural styles Please define these or include character images for each that highlight the different features so we are all on the same page. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Per email exchange and the discussion at 1/2 Committee, references to the architecural styles and corresponding exhibit will be removed for the next PUD resubmittal. Resolved 124 3 Planning & Zoning Alexia Lopez 11/30/23 2:58 PM Changemark Front Building Elevation Please define front building elevation and add some wording to clarify what would make a different elevation. For instance, a change in building material or porch columns would not make it a different elevation. To be different, the elevation would need to have changes in the form by altering the roof type or pitch, porch placement, or dormer type or location. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Please see the updated PUD Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 125 3 Planning & Zoning Alexia Lopez 11/30/23 3:02 PM Changemark Front Porches Please require front porches to be a minimum of 6 ft. deep and 30 sq. ft. so that they can be useable. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Please see the updated PUD. Resolved 126 3 Planning & Zoning Alexia Lopez 11/30/23 3:03 PM Changemark Front porch on all homes? Will there be front porches on all homes? Can you require this? Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Please see the updated PUD. Resolved 127 3 Planning & Zoning Alexia Lopez 11/30/23 3:42 PM Changemark Blue dots on Concept Plan I did not see where there was a different requirement for the lots with blue dots. What do those represent? Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM Please see the updated PUD. Resolved 128 3 Planning & Zoning Alexia Lopez 12/4/23 4:04 PM Changemark Update Zoning Comparison Chart Please update this chart to reflect the changes made to the PUD and layout. Andrews PUD - Zoning Comparison Chart 042023.pdf Responded by: Mike Timko - 11/5/24 7:07 AM Resolved per discussion with Christina Jesse ---------------------------------------------------------- Responded by: Rex Ramage - 1/4/24 3:37 PM Will update. UnResolved 129 3 Building & Code Services William Hohlt 12/5/23 7:56 AM Comment As an FYI. Upon plan submittal, verify all overhangs, projections etc meet section 302 of the IRC regarding fire walls crossing property lines Info Only 130 3 Planning & Zoning Alexia Lopez 12/6/23 9:41 AM Changemark Community Area Definition Community Area is capitalized here. Please provide a definition. Andrews - red line PUD 050323.pdf Responded by: Rex Ramage - 1/4/24 3:37 PM No longer defining, will revise the PUD text. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00014 PUD Andrews PUD Workflow Started: 1/19/2023 11:22:16 AM Report Generated: 11/07/2024 07:22 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 131 4 Urban Forestry Daren Mindham 1/10/24 1:23 PM Changemark open space calculations per city forester UDO requirement standard 50â?? north perimeter bufferyard = .80 acres at 50% UDO = .40 acres Transmission line easement = .90 acres at 50% UDO = .45 acres CA 1A and CA 2B = .60 acres (excludes trans line and 50â?? peri buffer) at 100% = .60 acres CA 2 = .17 acres at 0% UDO (too small) = 0.00 acres CA 3 = .67 acres at 100% UDO = 0.67 acres CA 4 = .44 acres at 100% UDO = 0.44 acres PER UDO requirements total acreage = 2.56 PUD required total acreage = 3.58 25% Additional Open Spaces Need to provide the 30â?? southern tree preservation buffer as easement or common area = est .50 acres Need to provide the 10â?? east buffer = est .10 acres Need to provide the 15â?? east buffer = est .20 acres Permit CA 2 to count = .17 acres possibly prairie grass/reforest the west half to provide a better natural amenity If these additional open spaces are dedicated common areas or easements then I will count them toward the open space requirement of 25% Please review and make final calculations measurements (some of my calculations above are calculated estimates) and add them to the open space summary as noted above and revise the open space plan accordingly. Andrews PUD - Red line v14 to v20 010424.pdf Responded by: Mike Timko - 11/5/24 7:08 AM Resolved per discussion with Christina Jesse Resolved 132 4 Transportation Systems David Littlejohn 1/17/24 1:44 PM Changemark ADA compliant crosswalks on all sides of intersections Revise the plans to include ADA crosswalks on all sides of the intersections in this project. Site Plan Exhibit SF Option 1.6.pdf Responded by: Mike Timko - 11/5/24 7:08 AM Resolved per discussion with Christina Jesse Resolved 133 4 Transportation Systems David Littlejohn 1/17/24 1:48 PM Comment Crosswalks at intersections may be marked or unmarked. Info Only 134 4 Planning & Zoning Alexia Lopez 1/25/24 3:28 PM Comment Please upload the most recent version of the PUD based on the Plan Commission outcome. Responded by: Mike Timko - 11/5/24 7:07 AM Resolved per discussion with Christina Jesse Resolved NF Nelson & Frankenberger, LLC Attorneys at Law 550 Congressional Blvd., Suite 210, Carmel, Indiana 46032 317-844-0106 JAMES E.SHINAVER JON C.DOBOSIEWICZ LAWRENCE J.KEMPER* Land Use Professional JOHN B.FLATT* FREDRIC LAWRENCE FRED PFENNINGER -Retired VALERIE L.MATHEIS** JANE B.MERRILL—Of Counsel *Also licensed in Kentucky **Also licensed in Illinois Via Hand Delivery November 2, 2023 City of Carmel Attn: Alexia Lopez One Civic Square Carmel, IN 46032 Re: Andrews PUD PZ-2023-00014 PUD Rezone Dear Alexia: Enclosed please find four (4) paper copies of the Plan Commission information packets for distribution to the members Residential Committee for the November 13th meeting along with a digital copy on a flash drive. Thanks for your assistance in this matter and should you have any questions please do not hesitate to contact me. Very truly yours, NELSON & FRANKENBERGER, LLC Jon C. Dobosiewicz Land Use Professional Enclosures A&F Engineering has reviewed letters submitted to the Carmel Plan Commission regarding traffic questions and concerns related to the proposed “Andrews PUD” located at 146th Street & Gray Road. The following is a follow-up to provide further information regarding traffic for this proposed development. In general, many of the comments/questions revolve around the assignment and distribution (A&D) of proposed development traffic shown in the submitted Traffic Impact Study (TIS) prepared by A&F Engineering. Typically, the assignment and distribution for a residential land use is derived using existing traffic count data, the location and type of adjacent roadways, the layout of the roadway network and the location of destination land uses (i.e., employment areas, shopping areas etc.). These variables were considered when formulating the A&D presented within the study. However, considering suggestions within the objection letters, A&F has conducted additional analyses that focused on multiple A&D scenarios. Each of these four scenarios were conducted under the following two basic assumptions. 1. No U-turns will occur at the intersection of 146th Street & Gray Road 2. All eastbound traffic entering the proposed development from 146th Street will utilize the proposed right-in/right-out access drive for the development. It was suggested that some traffic might enter from 146th Street onto Arrowwood Drive. The reasoning for this was that this intersection has an eastbound right-turn lane that might make drivers feel more comfortable entering this location. However, it should be noted that a right-turn lane along 146th Street will be required at the proposed right-in/right-out location. Furthermore, the path from 146th Street into the development drive is much more desirable than using an Arrowwood Drive which is located approximately 1100 feet west of the proposed development drive and requires drivers to travel a long and winding route through residential streets. The following table outlines the assumed A&D percentages for each scenario. Scenario Percentage To/From West 146th St. East 146th St. North Gray Rd. South Gray Rd. 1 45% 33% 12% 10% 2 35% 35% 15% 15% 3 30% 30% 20% 20% 4 25% 25% 25% 25% Note: Scenario 1 is the general A&D presented in the original TIS, while Scenario 4 represents suggested percentages by residents. The A&D percentages for each scenario shown above were applied to the proposed development AM and PM generated trip numbers (shown in Table 2 of the submitted TIS) to yield the following projected AM and PM peak hour traffic volume increases along Arrowood Drive and Wellswood Bend for each A&D scenario. Scenario AM Peak Hour PM Peak Hour Arrowwood Dr. Wellswood Bend Arrowwood Dr. Wellswood Bend 1 9 vehicles/hour 5 vehicles/hour 6 vehicles/hour 11 vehicles/hour 2 7 vehicles/hour 7 vehicles/hour 5 vehicles/hour 14 vehicles/hour 3 6 vehicles/hour 8 vehicles/hour 4 vehicles/hour 16 vehicles/hour 4 5 vehicles/hour 10 vehicles/hour 3 vehicles/hour 17 vehicles/hour Analysis of the four A&D scenarios shows an increase in traffic along Arrowwood Drive between 5 to 9 vehicles per hour during the AM peak hour and between 3 to 6 vehicles per hour during the PM peak hour. The lowest estimate (3 vehicles/hour) represents an average flow rate of approximately 1 vehicle every 20 minutes, while the highest estimate (9 vehicles/hour) represents a flow rate of 1 vehicle every 6.5 minutes (approximate). Similarly, analysis of the four A&D scenarios shows an increase in traffic along Wellswood Bend between 5 to 10 Vehicles per hour during the AM peak hour and between 11 to 17 vehicles per hour during the PM peak hour. The lowest estimate (5 vehicles/hour) represents an average flow rate of approximately 1 vehicle every 12 minutes, while the highest estimate (17 vehicles/hour) represents a flow rate of 1 vehicle every 3.5 minutes. In addition to the scenarios presented above, A&F Engineering conducted an additional trip generation analysis that compared the proposed development to what could be developed under the existing R-1 Zoning. For this analysis, it was assumed that approximately 30 single-family homes could be developed on the subject site. As was the case for the proposed townhome development, data from the ITE Trip Generation Manual was used to calculate the AM and PM peak hour generated trips from the 30 single-family homes. The following table shows the trip comparison between the proposed townhome development and what could possibly be developed on the subject site under the current R-1 Zoning. Site Development ITE Land Use Code Generated Trips AM Peak Hour PM Peak Hour Enter Exit Total Enter Exit Total 60 Townhomes 215 6 19 25 19 13 32 30 Single-Family Homes 210 6 19 25 20 12 32 Difference (Proposed – Zoning) 0 0 0 +1 -1 0 As shown in the table above, assuming the same access requirements were applied (right- in/right-out onto 146th Street and connection to Gray Oaks Court), the single-family homes allowed under the current zoning would have very similar traffic impacts as those associated with the proposed 60 townhomes. I€j I<RIEG I JEVAULT® WWW.KRIEGDEVAULT.COM May 16, 2023 Kevin G. Buchheit Direct Dial: (317)808-5820 E-mail: kbuchheit@kdlegal.com Carmel Advisory Plan Commission One Civic Square Carmel, Indiana 46032 RE: Docket No. PZ-2023-00014 PUD:Andrews PUD Rezone Dear Plan Commissioners: • Krieg DeVault LLP represents Salsbery Brothers Landscaping, Inc. ("Salsbery") which owns real estate located at 4305 and 4317 East 146th Street,Carmel, Indiana,46033. Salsbery has a decades- long history of legally operating its landscaping business from this location, which abuts the west line of the real estate under the referenced docket for the proposed Andrews PUD ("Andrews"). The purpose of this letter is to establish in the public record that Salsbery's business at this location predates all residential development in this general area, including Andrews,and that Salsbery will continue its operations from this location for the foreseeable future. Salsbery's landscaping operations generate, among other impacts, sounds, dust and odors, some of which extend beyond daylight hours and cannot be contained by individual real estate boundaries. Salsbery's business activities include, but are not limited to the following: • Multiple crews prepare and leave the facility every morning. During this time, trucks are loading various products (e.g., mulch, topsoil, stone). Air brakes and back up beepers are common on most trucks and other equipment. • Mulch vendors deliver mulch several times per day during the Spring, using a semi-truck that has a walking floor system to unload the mulch. The diesel engine of the semi-truck must throttle up to the necessary RPM's to operate the floor system correctly. • Topsoil is delivered several times per week with a tri-axle truck. The truck's tailgate slams up against the bed of the truck when delivery is complete,which creates a loud banging noise. • Gravel and stone products are delivered several times per week. This also creates a loud banging noise when the trucks have been emptied. • Trash pick-up service picks up dumpsters a couple of times per week. The diesel engines in these vehicles also must throttle up to operate the winch to empty the dumpsters. • Plant material is delivered by semi-trucks several times per week. These semi-trucks are unloaded by skid loaders during all hours of operation. • Stone Center trucks deliver wall stone and boulders several times per week.These trucks bring in their own forklift to unload the trucks. 12800 NORTH MERIDIAN STREET, SUITE 300, CARMEL, IN 46032-5407 T 317.566.1110 F 317 636 1507 Tr I11 MERITAS LAW FIRMS WORLDWIDE May 16, 2023 Page 2 • During winter storm events, salt is loaded into trucks from the salt bin,currently located on the east side of the property, adjacent to Andrews, during all hours of the day and night. Vehicles with back-up beepers and strobe lights will be in use during these operations. Salsbery also clears its property as snow accumulates. • Salsbery's operations center has security lighting that is on all night for employee safety and for site security. • Dust is generated by Salsbery's operations,and site dust may be picked up into the air on windy days. Prevailing winds in this area are generally from west to east. • The vehicle shop (mechanic) bay is located on the east side of the pole barn, on the side of the property adjacent to Andrews,and related sounds are generated by equipment like air tools and outside pressure washers. • Currently, 75 employees come and go from Salsbery's facility during peak season (March thru November). The above listing of Salsbery operations is representative, but not all-inclusive, and subject to change with the seasons and over time as business practices and customer needs evolve. Salsbery is a successful business and has endeavored to be a good neighbor as the vacant real estate around it has developed over time.Accordingly, Salsbery believes that it is important that, if the Andrews'PUD is approved, initial and subsequent Andrews residents are notified and made aware that a valued community business that generates sound,dust and odors predates and adjoins Andrews along its west boundary. Such notification should consist of more than this statement and be recorded (whether as a separate notification or included in Andrews'covenants and restrictions document) so it is discoverable through title searches associated with property transfers. Sincerely, Zto.:„. ley evah,- Kevin G. Buchheit Land Planner, Krieg DeVault LLP 9411 (5--- Tatum . Haney Partner, Krieg DeVault LLP On behalf of Salsbery Brothers Landscaping, Inc. mi Nelson & Frankenberger. LLC Attorneys at Law 550 Congressional Blvd., Suite 210, Carmel, Indiana 46032 317-844-0106 JAMES E.SHINAVER JON C.DOBOSIEWICZ LAWRENCE J.KEMPER* Land Use Professional JOHN B. FLATT* FREDRIC LAWRENCE VALERIE L.MATHEIS** *Also licensed in Kentucky JANE B.MERRILL—Of Counsel **Also licensed in Illinois FRED PFENNINGER —Of Counsel Via Hand Delivery May 5, 2023 City of Carmel Attn: Alexia Lopez One Civic Square Carmel, IN 46032 MA Y O 5 iutj Re: Andrews PUD ` PZ-2023-00014 PUD Rezone Dear Alexia: Enclosed please find seven (7) copies of the Plan Commission information packets for distribution to the members for the May 16th meeting along with a digital copy on a flash drive. Thanks for your assistance in this matter and should you have any questions please do not hesitate to contact me. Very truly yours, NELSON & FRANKENBERGER, LLC Jon C. Dobosiewicz Land Use Professional Enclosures 146th Street Access Requirements Adopted June 9th 2008 - “There will be no new direct access and/or change of access usage allowed onto 146th Street without the express approval of the County Commissioners. Any access changes to existing access locations and/or new access locations would only be considered if a traffic impact study, meeting County requirements, shows the requested change would improve the Level of Service of 146th Street.” Traffic Study Requirements In addition to the following, the TIA must conform to the Indiana Department of Transportation’s “Applicant’s Guide to Traffic Impact Studies”: - Introduction and Executive Summary - Seal and signature of a licensed Professional Engineer - Study area (to be decided) - Study years (development opening, 5 years & 10 years) - Development phasing - Current data on traffic volumes, accident history and signal operations - Peak traffic hours - Trip generation, trip distribution and assignment methods (ITE handbook) - Applicable planning documents - Projected growth - Current Level of Service of surrounding intersections (to be decided) - Planned roadway improvements - Surrounding zoning, PUD’s, etc. A site plan with the following: - Intersection design (lane width, acceleration/deceleration lanes, median improvements, etc.) - Internal circulation patterns - Connections to planned/proposed adjacent sites