Loading...
HomeMy WebLinkAboutC3.0 EXISTING CONDITIONS AND DEMOLITION PLANB EXISTING SAN. LATERAL 907907 9 0 7 907 90 6 905907 9 0 6 906 905904904A A A A B HARLESTON STREET TOWNE ROADEXISTING SAN. LATERAL EXISTING SAN. LATERAL EXISTING 8" DIP WATER MAIN C C C B EXISTING CONDITIONS AND DEMOLITION PLANC3.03850 Priority Way South Drive, Suite 110Indianapolis, IN 46240Phone: (317) 779-2194NO.DATEREMARKSFILENAME: DATE: JOB NO. SHEET 02/14/2023 12357 ACE HARDWAREVillage of WestClayHARLESTON STREET, CARMEL, IN 46032FILENAME: 12357_C3.0 DEMO SCALE 1" = 20' 200 40 N R CERTIFIED BY NOT F O R CON S T R U C TI O N DEMOLITION KEYNOTES: A.EXISTING GRAVEL TO BE REMOVED B.EXISTING FIRE HYDRANT TO BE PROTECTED THROUGHOUT CONSTRUCTION C.EXISTING WATER LINE TO BE PROTECTED THROUGHOUT CONSTRUCTION 1. CLEAR AND GRUB ALL TREES AND VEGETATION NECESSARY FOR CONSTRUCTION. 2.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE ALL MUD, DIRT, GRAVEL, AND ANY OTHER MATERIALS TRACKED ONTO ANY PUBLIC OR PRIVATE STREETS OR SIDEWALKS. THE CONTRACTOR SHALL USE MEASURES TO CONTROL DUST AT ALL TIMES. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, OR VERIFYING, THAT ALL PERMITS AND APPROVALS ARE OBTAINED FROM THE RESPECTIVE CITY, COUNTY, AND STATE AGENCIES PRIOR TO STARTING CONSTRUCTION. 3.ALL EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO COMMENCING DEMOLITION. 4.ENSURE SAFE PASSAGE OF PERSONS AROUND AREAS OF DEMOLITION AND CONSTRUCTION. CONDUCT OPERATIONS TO PREVENT DAMAGE TO ADJACENT STRUCTURES AND OTHER FACILITIES AND INJURY TO PERSONS. 5.CONDUCT DEMOLITION AND CONSTRUCTION OPERATIONS TO ENSURE MINIMAL INTERFERENCE WITH STREETS, WALKS, AND OTHER ADJACENT OCCUPIED STRUCTURES. 6.ALL UTILITIES TO BE REMOVED SHALL BE DISCONNECTED AND CAPPED AT THE NEAREST CONNECTION POINT UNLESS SPECIFIED OTHERWISE. 7.UTILITIES ARE SHOWN TO BE APPROXIMATE. THE CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY(S) COMPANY FOR THE REMOVAL, RELOCATION, AND/OR DEMOLITION OF ALL EXISTING UTILITIES. 8.ALL DEMOLISHED MATERIALS SHALL BE REMOVED AND LEGALLY DISPOSED OF OFF-SITE UNLESS NOTED OTHERWISE. 9.CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING PROPER DRAINAGE IN DEMOLITION AREAS. 10.PROMPTLY REPAIR DAMAGE TO ADJACENT FACILITIES CAUSED BY DEMOLITION AND CONSTRUCTION OPERATIONS AT NO EXTRA TO THE OWNER. 11.DEMOLITION ITEMS INCLUDE BUT ARE NOT LIMITED TO DEMOLITION ITEMS INDICATED ON THIS PLAN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REMOVE OR RELOCATE ITEMS WHICH INTERFERE WITH NEW CONSTRUCTION. 12.THE OWNER/DEVELOPER AND/OR CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING QUALITY CONTROL AT ALL TIMES DURING THE CONSTRUCTION PROCESS. 13.CONTACT OWNER IMMEDIATELY IF CONTAMINATED SOILS ARE ENCOUNTERED DURING CONSTRUCTION. CONTAMINATED SOILS MUST BE HAULED OFF-SITE AND PROPERLY DISPOSED. DEMOLITION NOTES: BUILDER TO CONTACT WESTCLAY OA AT 317-574-1164 TO COORDINATE FLAGGING OF THE WESTCLAY PRIVATE UTILITIES. BUILDER WILL BE RESPONSIBLE FOR DAMAGES TO STREET LIGHT WIRING AND PROJECT IRRIGATION SYSTEM CAUSED BY CONTRACTORS. PLEASE CALL 48 HOURS PRIOR TO START OF CONSTRUCTION TO ASSURE LOCATES ARE COMPLETED PRIOR TO EXCAVATION CITY OF CARMEL NOTES: 1.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPER TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 2.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL BE RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY.