HomeMy WebLinkAboutC3.0 EXISTING CONDITIONS AND DEMOLITION PLANB
EXISTING SAN. LATERAL
907907
9
0
7
907
90
6
905907
9
0
6
906 905904904A
A
A
A
B
HARLESTON STREET
TOWNE ROADEXISTING SAN. LATERAL EXISTING SAN. LATERAL
EXISTING 8" DIP WATER MAIN
C C
C
B
EXISTING CONDITIONS AND DEMOLITION PLANC3.03850 Priority Way South Drive, Suite 110Indianapolis, IN 46240Phone: (317) 779-2194NO.DATEREMARKSFILENAME:
DATE:
JOB NO.
SHEET
02/14/2023
12357 ACE HARDWAREVillage of WestClayHARLESTON STREET, CARMEL, IN 46032FILENAME:
12357_C3.0 DEMO
SCALE 1" = 20'
200 40
N
R
CERTIFIED BY
NOT
F
O
R
CON
S
T
R
U
C
TI
O
N
DEMOLITION KEYNOTES:
A.EXISTING GRAVEL TO BE REMOVED
B.EXISTING FIRE HYDRANT TO BE PROTECTED THROUGHOUT CONSTRUCTION
C.EXISTING WATER LINE TO BE PROTECTED THROUGHOUT CONSTRUCTION
1. CLEAR AND GRUB ALL TREES AND VEGETATION NECESSARY FOR CONSTRUCTION.
2.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE ALL MUD, DIRT,
GRAVEL, AND ANY OTHER MATERIALS TRACKED ONTO ANY PUBLIC OR PRIVATE
STREETS OR SIDEWALKS. THE CONTRACTOR SHALL USE MEASURES TO
CONTROL DUST AT ALL TIMES.
3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, OR VERIFYING, THAT
ALL PERMITS AND APPROVALS ARE OBTAINED FROM THE RESPECTIVE CITY,
COUNTY, AND STATE AGENCIES PRIOR TO STARTING CONSTRUCTION.
3.ALL EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO COMMENCING
DEMOLITION.
4.ENSURE SAFE PASSAGE OF PERSONS AROUND AREAS OF DEMOLITION AND
CONSTRUCTION. CONDUCT OPERATIONS TO PREVENT DAMAGE TO ADJACENT
STRUCTURES AND OTHER FACILITIES AND INJURY TO PERSONS.
5.CONDUCT DEMOLITION AND CONSTRUCTION OPERATIONS TO ENSURE MINIMAL
INTERFERENCE WITH STREETS, WALKS, AND OTHER ADJACENT OCCUPIED
STRUCTURES.
6.ALL UTILITIES TO BE REMOVED SHALL BE DISCONNECTED AND CAPPED AT THE
NEAREST CONNECTION POINT UNLESS SPECIFIED OTHERWISE.
7.UTILITIES ARE SHOWN TO BE APPROXIMATE. THE CONTRACTOR SHALL
COORDINATE WITH RESPECTIVE UTILITY(S) COMPANY FOR THE REMOVAL,
RELOCATION, AND/OR DEMOLITION OF ALL EXISTING UTILITIES.
8.ALL DEMOLISHED MATERIALS SHALL BE REMOVED AND LEGALLY DISPOSED OF
OFF-SITE UNLESS NOTED OTHERWISE.
9.CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING PROPER DRAINAGE IN
DEMOLITION AREAS.
10.PROMPTLY REPAIR DAMAGE TO ADJACENT FACILITIES CAUSED BY DEMOLITION
AND CONSTRUCTION OPERATIONS AT NO EXTRA TO THE OWNER.
11.DEMOLITION ITEMS INCLUDE BUT ARE NOT LIMITED TO DEMOLITION ITEMS
INDICATED ON THIS PLAN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REMOVE
OR RELOCATE ITEMS WHICH INTERFERE WITH NEW CONSTRUCTION.
12.THE OWNER/DEVELOPER AND/OR CONTRACTOR SHALL BE RESPONSIBLE FOR
MAINTAINING QUALITY CONTROL AT ALL TIMES DURING THE CONSTRUCTION
PROCESS.
13.CONTACT OWNER IMMEDIATELY IF CONTAMINATED SOILS ARE ENCOUNTERED
DURING CONSTRUCTION. CONTAMINATED SOILS MUST BE HAULED OFF-SITE
AND PROPERLY DISPOSED.
DEMOLITION NOTES:
BUILDER TO CONTACT WESTCLAY OA AT 317-574-1164 TO COORDINATE FLAGGING
OF THE WESTCLAY PRIVATE UTILITIES. BUILDER WILL BE RESPONSIBLE FOR
DAMAGES TO STREET LIGHT WIRING AND PROJECT IRRIGATION SYSTEM CAUSED BY
CONTRACTORS. PLEASE CALL 48 HOURS PRIOR TO START OF CONSTRUCTION TO
ASSURE LOCATES ARE COMPLETED PRIOR TO EXCAVATION
CITY OF CARMEL NOTES:
1.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE
RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED
FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED
DEVELOPMENT SHALL BE THE DEVELOPER TO RESOLVE WITH THE UTILITY.
EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF
PROPOSED RIGHT-OF-WAY LINE.
2.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL BE RESTORED/REPAIRED TO
THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE
CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE
CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING
CONDITION OF THE RIGHT-OF-WAY.