Loading...
HomeMy WebLinkAboutC6.0 UTILITY PLANPROPOSED BUILDING ±21,456 SF FFE = 907.90 HARLESTON STREET TOWNE ROADPROPOSED 15' DRAINAGE EAEMENT STR. 101A RIM=906.23 INV(S)=902.37 (12" RCP)STR. BMP 1 RIM=906.63 INV(S)=900.52 (18" RCP) INV(N)=900.92 (12" RCP) INV(E)=900.42 (18" RCP) STR. 202 RIM=906.36 INV(N)=901.54 (10" HDPE) INV(E)=901.12 (15" RCP) STR. 201 RIM=906.35 INV(W)=900.89 (15" RCP) INV(N)=900.64 (18" RCP) STR. 103 RIM=906.30 INV(W)=902.38 (15" RCP) INV(N)=902.80 (10" HDPE) STR. 101 RIM=906.27 INV(E)=901.68 (18" RCP) INV(N)=902.18 (12" RCP) INV(W)=901.18 (24" RCP)STR. 102 RIM=906.06 INV(E)=902.10 (15" RCP) INV(W)=901.85 (18" RCP) STR. 200A RIM=905.80 INV(S)=901.10 (12" RCP)49' - 18" RCP @ 0.25%93' - 15" R C P @ 0 . 2 5 % 92' - 15" RCP @ 0.30% 68' - 1 8 " R C P @ 0 . 2 5 %55' - 12" RCP @ 0.32%46' - 18" RCP @ 0.25%40' - 10" HDPE @ 1.00%40' - 10" HDPE @ 1.00%59' - 12" RCP @ 0.32%78' - 24" RCP @ 0.20%TOWNE ROADPROPOSED 25' ACCESS EAEMENT CONNECT TO EX. SEWER LATERAL STUB. FIELD VERIFY LOCATION AND INVERT. 10' - 6" PVC SDR 35 @ 2.08% MIN. SANITARY CLEANOUT TYPE II 3' - 6" PVC SDR 35 @ 2.08% MIN. HOT TAP EXISITING 8" DIP MAIN W/ 8"x6" TAPPING SLEEVE AND VALVE FDC PIV COORDINATE FIRE AND DOMESTIC WATER SIZES AND LOCATIONS WITH MEP DRAWINGS TRANSFORMER PAD COORDINATE W/ UTILITY EXISTING STORM STRUCTURE TO BE CORE DRILLED, CONNECTION TO BE SEALED WITH NON SHRINK GROUT AND ENTIRELY ENCASED IN CONCRETE ON EXTERIOR OF EXISTING STRUCTURE. CONTRACTOR TO USE EXTREME CAUTION WHEN EXCAVATING UNDER OVERHEAD UTILITY LINES 15' - SSD (TYP) 15' - SSD (TYP) 15' - SSD (TYP) FIRE HYDRANT TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION. ADJUST TO GRADE. EXISTING 8" DIP WATER MAIN TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION FIRE HYDRANT TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION. COORDINATE SANITARY CONNECTION AT BUILDING WITH MEP PLANS COORDINATE ROOF DRAIN CONNECTION AT BUILDING WITH MEP PLANS COORDINATE ROOF DRAIN CONNECTION AT BUILDING WITH MEP PLANS COORDINATE ELECTRICAL SERVICE ROUTE WITH UTILITY STORM STRUCTURE DATA TABLE STR. NO. 100 101 101A 102 103 200A 201 202 BMP 1 BMP 2 STRUCTURE TYPE 60" MANHOLE 48" MANHOLE 48" MANHOLE 48" MANHOLE 48" MANHOLE 2' X 3' INLET 48" MANHOLE 48" MANHOLE CS-5 WQU CS-6 WQU CASTING TYPE R-1714 R-3472 R-3472 R-3472 R-3472 R-3287-SB10 R-3287-SB10 R-3472 SOLID COVER SOLID COVER RIM 906.96 906.27 906.23 906.06 906.30 905.80 906.35 906.36 906.63 906.18 INCOMING PIPE INV. (24" RCP) = 901.02 INV. (18" RCP) = 901.68 INV. (12" RCP) = 902.18 INV. (15" RCP) = 902.10 INV. (10" HDPE) = 902.80 INV. (15" RCP) = 900.89 INV. (10" HDPE) = 901.54 INV. (18" RCP) = 900.52 INV. (12" RCP) = 900.92 INV. (24" RCP) = 900.78 OUTGOING PIPE INV. (24" RCP) = 900.92 INV. (24" RCP) = 901.18 INV. (12" RCP) = 902.37 INV. (18" RCP) = 901.85 INV. (15" RCP) = 902.38 INV. (12" RCP) = 901.10 INV. (18" RCP) = 900.64 INV. (15" RCP) = 901.12 INV. (18" RCP) = 900.42 INV. (24" RCP) = 900.78 UTILITY PLANC6.03850 Priority Way South Drive, Suite 110Indianapolis, IN 46240Phone: (317) 779-2194NO.DATEREMARKSFILENAME: DATE: JOB NO. SHEET 02/14/2023 12357 ACE HARDWAREVillage of WestClayHARLESTON STREET, CARMEL, IN 46032FILENAME: 12357_C6.0 UT SCALE 1" = 20' 200 40 N R CERTIFIED BY NOT F O R CON S T R U C TI O N MATCHLINE - SEE C6.1LEGEND: STORM SEWER SANITARY SEWER WATER MAIN (WITH SIZE) TELECOM LINE GAS LINE ELECTRIC LINE SANITARY MANHOLE 1.RIM OR TOP OF CASTING ELEVATION EQUALS THE LOWEST POINT ON THE CASTING WHERE WATER ENTERS THE STRUCTURE OR THE TOP OF A SOLID CASTING. 2.PIPE LENGTHS ARE MEASURED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE OR END OF PIPE END SECTION. 3.WATER MAINS THROUGHOUT THE PROJECT SHALL BE INSTALLED WITH AT LEAST 60 INCHES OF COVER FROM FINISH GRADE TO TOP OF WATER LINE. CONTRACTOR TO PROVIDE ALL FITTINGS REQUIRED TO ASSURE PROPER INSTALLATION OF WATER MAINS AND LATERALS. 4.THE FIRE SERVICE AND DOMESTIC WATER LINE SHALL BE PVC C900 AND INSTALLED PER CITY OF CARMEL STANDARDS. 5.CONTRACTOR SHALL VERIFY, BEFORE INSTALLATION, THE DOMESTIC WATER SERVICE LINE INTERNAL DIAMETER (ID) MEETS THE DEMAND AND SIZE SPECIFIED BY THE PLUMBING DESIGNER. 6.ELECTRICAL CONDUIT SHALL BE INSTALLED AT A MINIMUM OF 36 INCHES BELOW THE FINISH GRADE. ENDS OF THE CONDUIT SHALL BE MARKED BY INSTALLING A 4X4 WOOD POST PAINTED RED. 7.LOCATIONS OF EXISTING UNDERGROUND UTILITY LOCATIONS ARE APPROXIMATE. THE CONTRACTOR IS TO FIELD VERIFY ALL HORIZONTAL AND VERTICAL LOCATIONS PRIOR TO CONSTRUCTION. 8.ALL 6" SANITARY SEWER LATERALS ARE TO BE CONSTRUCTED WITH SDR-35 PVC @ 2.08% MINIMUM SLOPE. 9.TRACER WIRE IS REQUIRED ON ALL SANITARY SEWER LATERALS. 10.SEE CITY OF CARMEL AND TRICO REGIONAL SEWER UTILITY STANDARDS FOR WATER AND SEWER SPECIFICATIONS. 11.CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY COORDINATION WITH LOCAL JURISDICTION AND ALL RESPECTIVE UTILITY COMPANIES FOR GAS, ELECTRIC, TELEPHONE, AND CABLE SERVICES. 12.CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND PROVIDING TRAFFIC CONTROL PER LOCAL STANDARDS AND REQUIREMENTS. ALL STREET CUTS SHALL BE REPAIRED PER LOCAL REQUIREMENTS. 13.SEE ARCHITECTURAL PLANS FOR DETAILED INFORMATION AND EXACT LOCATIONS FOR UTILITIES COMING INTO THE BUILDING. 14.SEE ARCHITECTURAL PLANS FOR EXACT LOCATIONS OF DOWNSPOUTS OR ROOF DRAINS. 15.FOR VIEWING CLARITY OF THESE CONSTRUCTION PLANS, PIPES OR STRUCTURES MAY NOT BE SHOWN TO SCALE. 16.ALL UTILITY MATERIALS AND INSTALLATION SHALL CONFORM TO LOCAL STANDARDS FOR EACH UTILITY AGENCY HAVING JURISDICTION. 17.IN THE EVENT OF A CONFLICT BETWEEN WATER LINES AND STORM DRAINS, THE CONTRACTOR SHALL EITHER ADJUST THE WATER LINE DOWNWARD IN SUCH A MANNER SO THAT THE PIPE MANUFACTURER'S RECOMMENDATIONS ON PIPE DEFLECTION AND JOINT STRESS ARE NOT EXCEEDED OR THE CONTRACTOR SHALL PROVIDE APPROPRIATE BENDS AND CROSSINGS. 18.WATER AND SEWER MAIN CROSSINGS SHALL BE IN ACCORDANCE WITH 10 STATE STANDARDS. WATER AND SEWER MAINS SHALL HAVE A MINIMUM HORIZONTAL SEPARATION OF 10 FEET FROM EDGE OF PIPE TO EDGE OF PIPE. WATER PIPES CROSSING ABOVE SEWER PIPES MUST HAVE A MINIMUM VERTICAL SEPARATION OF 18 INCHES CLEARANCE BETWEEN PIPES. 19.THE CONTRACTOR SHALL CONTACT ENGINEER FOR ALL QUESTIONS REGARDING UTILITY PLAN DISCREPANCIES AND/OR CONFLICTS IN THE FIELD. 20.STRUCTURES RECEIVING SUB-SURFACE DRAINS (SSD) SHALL HAVE BOTH PORTS CORE DRILLED. T OR Y BLIND CONNECTIONS ARE NOT ALLOWED. UTILITY NOTES STORM MANHOLE STORM INLET FIRE HYDRANT REDUCER VALVE/PIV