February 27, 2023
41,
FINDINGS OF FACT SHEET-DEVELOPMENT STANDARDS VARIANCE
CARMEL ADVISORY BOARD OF ZONING APPEALS
Docket No.: PZ-2023-00016V
Petitioner: S-Mart Real Estate, Inc.,Warren Johnson and/or Brian Johnson
1. The approval of this variance will not be injurious to the public health, safety, morals and general
welfare of the community because:
This variance will have no effect on public safety, health, morals or General welfare of the
community as only deals with the size of a building compared to the lot size.
2. The use and value of the area adjacent to the property included in the variance will not be affected
in a substantially adverse manner because:
Granting this variance will not negatively affect the adjacent properties but granting this
variance will lead to the development of this property which have a positive affect on
adjacent property values. The floodplain to the south cannot be developed so this variance
will have no effect on that property.
3. The strict application of the terms of the Unified Development to the property will result in practical
4110 difficulties in the use of the property because:
The existing floodplain and underground culvert makes the development of this property
very difficult. Strict application of the Unified Development standards could make
development of the property Impossible.
DECISION
IT IS THEREFORE the decision of the Carmel Board of Zoning Appeals that Development Standards
Variance Docket No. PZ-2023-00016V is granted, subject to any conditions stated in the minutes of this
Board,which are incorporated herein by reference and made a part hereof.
Adopted this 27Th day of February 2023.
HEARING OFFICER,Carmel Board of Zoning Appeals
SECRETARY, Carmel Board of Zoning Appeals
S
FINDINGS OF FACT SHEET-DEVELOPMENT STANDARDS VARIANCE
CARMEL ADVISORY BOARD OF ZONING APPEALS
Docket No.: PZ-2023-00025V
Petitioner: S-Mart Real Estate, Inc.,Warren Johnson and/or Brian Johnson
1. The approval of this variance will not be injurious to the public health, safety, morals and general
welfare of the community because:
This variance will potentially have a meniscal effect on public safety, health, morals or
General welfare of the community as only deals with a few small change in 100 year flood
plain of the creek.
2. The use and value of the area adjacent to the property included in the variance will not be affected
in a substantially adverse manner because:
Granting this variance will not negatively affect the adjacent properties as it will have such
a minute impact if we had a 100 year flood.
3. The strict application of the terms of the Unified Development to the property will result in practical
difficulties in the use of the property because:
411111 The existing floodplain and underground culvert makes the development of this property
very difficult. Strict application of the Unified Development standards could make
development of the property too expensive and there might stop the development. This
property was and is very difficult to develop due to its size and the various standards that
are difficult or impossible to develop.
DECISION
IT IS THEREFORE the decision of the Carmel Board of Zoning Appeals that Development Standards
Variance Docket No. PZ-2023-00025V is granted, subject to any conditions stated in the minutes of this
Board,which are incorporated herein by reference and made a part hereof.
Adopted this 27th day of February 2023.
HEARING OFFICER, Carmel Board of Zoning Appeals
SECRETARY, Carmel Board of Zoning Appeals
M
STATEMENT OF VARIANCE REQUEST
Docket No. PZ-2023-00016V
Request is to allow the Floor Area Ratio of the Planned Development
(which has been conditionally approved by the Plan Commission) to be
0.28 when the UDO Section 3.72D requires a Floor Area Ration of 0.50.
S
Docket No. PZ-2023-00025V
Request is to allow the Floodplain Mitigation Ratio of 0.81 to be allowed
when ratio of 1.0 is required by UDO Section 5.10 (and City Code Chapter
10 Article 5 A(11)(a).
STATEMENT OF SUPPORT
Docket No. PZ-2023-00016V
This variance request will allow for this development to proceed which is on a
site hindered by a portion of the site on the east being unable to be developed
due to a culvert which was installed to allow access to the site further away from
the new roundabout on 116th St.This culvert includes an easement of 40 ft.wide
by 110 ft. on which no structure can be built and to the south end of the
property we have huge floodplain which also cannot be developed. The total
area which cannot be developed is 8352 sq. ft.
Docket No. PZ-2023-00025V
In order to develop the property and allow for parking, a small area of the
floodplain had to filled to accommodate this parking. A small area of non-
floodplain was then converted into new floodplain area. With this establishment
of new floodplain,we are approximately 30.2 cubic yards short of making the 1:
1 ratio. With the installation of small retainer wall,we are able to achieve a 0.81
ratio.
BZA Hearing Officer
FLOOR AREA RATIO
• S-Mart Real Estate took the initiative and worked with City Engineering Dept. and Jeremy
Kashman to make this interchange safer after the roundabout construction. The original plan
was to provide an ingress and egress on the far east side of the gas station property which
would be right at the exit of the east bound roundabout. SMRE proposed extending the culvert
under 116th St. 110 feet to the south to allow for an ingress and egress as far east of the
roundabout as possible.
• SMRE secured all the necessary approvals from Federal, State and City and installed this culvert.
It needs to be pointed out that this area cannot be developed because the City requires a 40
foot wide easement over this culvert. This area, although beneficial to the City, now hurts the
developer in his attempt to reach the Floor Area Ratio requirement. This area is equal to
approximately 8352 sq. ft. and, in the view of the Developer, should NOT be counted in
determining the floor area ratio.
•
. mix
8352 SF
l' v
tit
•
Flood Plain Mitigation
• This site is a very difficult site to develop even without the constraints imposed on it by The
Rangeline Overlay Zone Ordinance. We are forced to use part the floodplain to provide parking
and we are incurring substantial expense in creating additional floodplain to offset the minor
use of the floodplain for parking.
• Per our Civil Engineer estimate, we would be removing approximately 30 cubic yards from the
existing floodplain which would have little impact on the entire floodplain area.
• It might be possible to cut additional areas (green areas) as per John Thomas email of 01-30-23.
"I did identify some areas where the project may be able to cut from the floodplain to offset or
even forgo the need for a variance (yellow areas in image below), but it would probably
necessitate removing the trees from those areas. There is a fair amount of trash in the
floodplain, as well as invasive species, which would be beneficial to the floodplain to have the
cleaned up/removed."
' R;;\ i••iif
y .v- ,Ni
tl:
1:
\ thrcy7s,
, . 7 ', 'f efi., ,
- * 't\ M 't ,t -. k*.#i''..7 lk., -'!:1 fc 1 kit, .1'-''
f. q 1 1
idl
WM
c.,
. ,:i ,„..._ ,... •,,,,,. .,,,, ,„:,
ft:
11=
�, µy
I
F
i ... .....,i � . `_ ,..
,„41,. Al N
We will attempt to do this once earthwork begins on the site.
• LOCATION MAP
Docket No.PZ-2023-00016V and PZ-2023-00025V
034
007
033
KRG Centre,LLC 031
Walgreens
Zoned B3 Speedway,LLC
Gas/C-store
007.004 Zoned B-3
S --� i
seaser
SWAM MEM
*440 /
S-Mart Real Estate,Inc. 0°'
New Development I Warren K.&Carol J.Johnson Trust
012
Zoned B-3 Vacant Land
Zoned B-3
Carmel Corner Project Co.,LLC
The Corner Retail/Residential —
Zoned C-1
SW Investment Trust
Vacant Land 001
013
Zoned B-3
002
001
MI
1/1
I E. 116th STREET
II
/ ,� �'`�' A.><a=.� • a
0
84.83'x61.83' I
i
OFFICE/RETAIL I
s.
y Q SPACE '/
" _ FFE=820.00 '
• • MFPG=817.00 t
y MLAG=XXX l
7 / - Entry
r aourtSrard
16"......°4°. '......
a 71.46k61.83' Orf� OFFICE/RETAIL
• •5 d SPACE Er • ivF-+ FFE=820.00
MFPG=817.00
MLAG=XXX t
if
a rilT
j # 0
b.
—r 1
1111
■ r71_
I I .
II C:.I
_
rlla X N
rn A I r. 1 n — A n' %AO
• -
1 / /�
'�— -- E. 116th STREET
I 1 1 � .
�" y .•. .. -lig
e , Aim
/ d •,.,ram... . : ti •� , 's,
4
/
______--- ....--- -------- VT.
4.0 0 4.1.
84.83'41.83' •10.
,
OFFICEIRETAIt, t
„ . SPACE /fA010 :
FFE=820.00 i/� 4 ��q r
MFPG=817.00
0MLAG=XXX 1�
• 11110
�° iii
• Entry ' ' I �Q
Clp
Illi.
/ �ourtyarci ,
.. ...EIA
• • 0 (---•
ter71.46'x81.83' 4)'
T�. Of
OFFICE!RETAIL
114
• SPACE
—�i I •
FFE=820.00
2 ' MFPG=817.00
I MLAG=XXX t 11111,1116
Go
►fir I Lk
i + A01
a - v w
,40 1 .
P &. ..,, .pi
•
� . . �Elli mot...
l' • '; . nO00 *IV*
� 7,...,1
o e
MP il 1-'16- ' 71 N
1
1
-AILIAIIRINIIRININNINII___
_
----— -.00R I --NAST STINE
amoommilemom.
tillin' t'
4------- *--'
.- , -•
.41111 i; , iiii
.,
. .., .
....,,_____ ..... —
----------- ., _
,........
Mr _'''' NIIIIIM•MONS :-. an
1110101111104
.......
- -.
0 I
NI NI
aliiIIM 111111111111111 MI ni _
II sw......' _
Nola
... . .... ill "I ii
II 1 91 it 1. ! _ - .
illifi 1111171 III' 1 ii ............. __.
_
NINIIN am_ II
II a
i II Is,
'III' _________ ____________
............. \,,,,-.',..,
t I
,...•u..y.. .. ." .,.... ..,.
AUL 1114".4 1 70: :Mal;
.. ,_
1 r
I I. I
Ill iii ill Tii a ,,
1 1 If II 111 ' ' W
ligic-1 -WHIN --- MEM
i
ill III III Hi ___
- , ...
I NW*
III ill III It 1" li i IN s
-
__..m.....—___ . .
11111 ;is HE" --0111.11
,,,...,.,,...,..tr, v....4144-'W,1,. •... *.,.„ -...,.Z.,
BMO BANK PROJECT, CARMEL IN I. SEBREE
NI JANUARY NM NEM ARCHITECTS
g 0 •
gum Imo amok Ina mum mot NI a a
Mil .....„
111
111.111111111111.. ..... Iwo Monuir.r. 3rgirgrar........ nil'
1:,,,,,:,_ 1 P_PAI I 1111_,,,,,
Ili
a
___ ...
_........„
-
,. . ....... ...........
._. . ,- . '.......
,......,
vt -- I 04 :44
_..
.:
_7
L- III ...,_
Tvk sii WI mai __
i I I men,mmor
MI MI
II I •N , -
rt3 111
•1 At' -;,-,.:
- *,.„ NI i •
.,.„ ,, PM- _ 111115 -
OF- ' li - --.
in III NI III II 1 I r II
______ , r --L-L••-2 i
i .,, 1 - - 1
„.__
---- :______ _ .,....-,- ___ .. _.---77.._,_-_. ...z... ,•..,,,,., • ---- ---
_
, .. . •
• ••
BMO BANK PROJECT, CARMEL IN SEBREE
10 JANUARY 2013 ARCHITECTS
I
ir. ` ;r i i .....-"'.- `o
_.....a..........._____...._....____...._ - ..__._
... „v`
l
1 ...a.
__
_ wag III SIM
am
o
,_ anew awe_r I.
1 S♦1 � ffi 1• S� �R
BMO BANK PROJECT, CARMEL IN Mil, S E B R E E
sL MM'2923 WIMP ARCHITECTS