HomeMy WebLinkAboutP102 - Second Floor Plumbing PlanCB
7.0
ROOM 1
TRACKOFFICE
SMALL
ENTERTAINMENT
LOUNGE
OFFICE
STAFF
BATHROOM
SMALL
KITCHENETTE
CARDIO
ROOM 2
ROOM 3
ROOM 4
ROOM 5
SK-1
L-1WC-1
SH-1
RD-1
RD-1
BF-1 RC-2, locate
above ceiling
MAU-1
RTU-1
2400
RTU-2
2400
RTU-3
4000
1"G
11
4"G
1"G
11
2"G
2"G
1"G
1"G
2"G from
below
A. All fittings, piping, fixtures, materials, etc. to meet the
current Safe Drinking Water Act with all of its
amendments and the Reduction of Lead in Drinking
water Act.
B. All work shall comply with all national, state, local codes
and ordinances pertaining to the work in this project.
C. All plumbing fixtures shall be supplied with individual
water supply stops and code approved traps. Exposed
piping shall be chrome plated.
D. All plumbing fixtures shall be installed with approved
backflow prevention devices.
E. No piping shall pass directly over electrical power
distribution cabinets, panelboards, etc. Contractor to
coordinate panel locations prior to piping installation.
F. All plumbing vents to be a minimum of 10'-0" from any air
intake. Coordinate locations with HVAC plans.
G. Single runouts to plumbing fixtures shall be the same
size as on the plumbing fixture schedule unless
otherwise noted.
H. Concealed gas piping shall be constructed in accordance
with code without unions, tubing fittings or running
threads.
I. Gas lines run on roof to be supported by Roof Top Blox
or similar and equal. DO NOT USE LUMBER FOR GAS
PIPING SUPPORT.
J. Dry-pipe fire protection system shall be used in all areas
subject to freezing.
K. All waste, water, vent, gas and condensate lines shown
to be connected to their associated fixture/equipment,
unless noted otherwise. All equipment and systems
shown must be complete and usable upon completion of
project.
General Notes:DRAWING TITLESEALSHEETPROJECT INFOREVISIONS22030
12-12-2022
# DESCRIPTION DATE
100% REVIEW ARCHITECTCLIENTPROJECTAddition &Renovations toOzwell FitnessCONSULTANT1077 3rd Avenue SW,Carmel INOZWELLfitnessGNIBMULP·LACITCELE·LACINAHCEMRTHEENGINEERINGCOLLABORATIV E
P102SECOND FLOORPLUMBING PLANSCALE: 3/16" = 1'-0"01 SECOND FLOOR PLUMBING PLAN
N
O
R
T
H
02/20/23