HomeMy WebLinkAboutP201 - First Floor Plumbing Water & Gas PlanCB
3.0
2.0
1.0
4.0
5.0
6.0
7.0
MEN's
LOCKER ROOM
LAUNDRY
W/DD
CRYO REDLIGHTREDLIGHTMASSAGE
NURSE
RESTROOM
MASSAGEWELLNESS
LOUNGE
CLOSET
STAFF
OFFICE
CARDIO
CHILDCARE
STAFFBATHROOMELECTRIC /
WATER HEATER
YOGA
TRAINING DYNADOME
STORAGE
WOMEN's
LOCKER ROOM
LOBBY/RECEPTION
VESTIBULE
MECH.
/Audio
Vertical Fire
Protection RiserWH-1
4"Fire Dept. Connection
Line. Extend to 5'-0"
beyond bldg. line. See
Civil plans for continuation.
6"Fire Protection Service.
Extend to 5'-0" beyond
bldg. line. See Civil
plans for continuation.
x"I.D. Domestic water service.
Extend to 5'-0" beyond bldg. line.
See Civil plans for continuation.
Meter & RPZ-1
FPHB
+24"
RC-1, locate
above ceiling
RC-1, locate
above ceiling
1
1
1
2"CW
3
4"HWR
3
4"HW
x"CW
3
4"HWR
1"HW
x"CW
3
4"HWR
3
4"HW
x"CW
1"HWR
1"HW
x"CW
11
2"HW
11
2"CW
1"HWR
11
2"HW
x"CW
1"HWR
11
2"HW
x"CW
x"CW
11
2"HW
1"HWR
RH-1
40MBH
RH-1
40MBH
RH-1
40MBH
RH-1
40MBH
RH-1
40MBH
RH-1
40MBH
RH-1
40MBH
RH-1
40MBH
Nitrogen Control
Panel. Field verify
exact equipment
location, prior to
start of work.
1
2"Nitrogen down to
equipmnet. Field verify
exact equipment location,
prior to start of work.
1
2"Nitrogen from tank.
Field verify exact
equipment location,
prior to start of work.
2"G, as
high as
practical
11
2"G, above
overhead doors
11
2"G, above
overhead doors
11
4"G, above
overhead doors
11
4"G, above
overhead doors
11
4"G, above
overhead doors
1"G, above
overhead doors
3
4"G, above
overhead doors
2"G up 2"G above
ceiling
21
2"G down to meter
(758,000 BTU @ 6" w.c.)
A. All fittings, piping, fixtures, materials, etc. to meet the
current Safe Drinking Water Act with all of its
amendments and the Reduction of Lead in Drinking
water Act.
B. All work shall comply with all national, state, local codes
and ordinances pertaining to the work in this project.
C. All plumbing fixtures shall be supplied with individual
water supply stops and code approved traps. Exposed
piping shall be chrome plated.
D. All plumbing fixtures shall be installed with approved
backflow prevention devices.
E. No piping shall pass directly over electrical power
distribution cabinets, panelboards, etc. Contractor to
coordinate panel locations prior to piping installation.
F. All plumbing vents to be a minimum of 10'-0" from any air
intake. Coordinate locations with HVAC plans.
G. Single runouts to plumbing fixtures shall be the same
size as on the plumbing fixture schedule unless
otherwise noted.
H. Concealed gas piping shall be constructed in accordance
with code without unions, tubing fittings or running
threads.
I. Gas lines run on roof to be supported by Roof Top Blox
or similar and equal. DO NOT USE LUMBER FOR GAS
PIPING SUPPORT.
J. Dry-pipe fire protection system shall be used in all areas
subject to freezing.
K. All waste, water, vent, gas and condensate lines shown
to be connected to their associated fixture/equipment,
unless noted otherwise. All equipment and systems
shown must be complete and usable upon completion of
project.
General Notes:
Set balancing station to 0.5 gpm.
Plan Notes:
1 DRAWING TITLESEALSHEETPROJECT INFOREVISIONS22030
12-12-2022
# DESCRIPTION DATE
100% REVIEW ARCHITECTCLIENTPROJECTAddition &Renovations toOzwell FitnessCONSULTANT1077 3rd Avenue SW,Carmel INOZWELLfitnessGNIBMULP·LACITCELE·LACINAHCEMRTHEENGINEERINGCOLLABORATIV E
P201FIRST FLOORPLUMBING WATER &GAS PLANSCALE: 3/16" = 1'-0"01 FIRST FLOOR PLUMBING WATER & GAS PLAN
N
O
R
T
H
02/20/23