Loading...
HomeMy WebLinkAboutP201 - First Floor Plumbing Water & Gas PlanCB 3.0 2.0 1.0 4.0 5.0 6.0 7.0 MEN's LOCKER ROOM LAUNDRY W/DD CRYO REDLIGHTREDLIGHTMASSAGE NURSE RESTROOM MASSAGEWELLNESS LOUNGE CLOSET STAFF OFFICE CARDIO CHILDCARE STAFFBATHROOMELECTRIC / WATER HEATER YOGA TRAINING DYNADOME STORAGE WOMEN's LOCKER ROOM LOBBY/RECEPTION VESTIBULE MECH. /Audio Vertical Fire Protection RiserWH-1 4"Fire Dept. Connection Line. Extend to 5'-0" beyond bldg. line. See Civil plans for continuation. 6"Fire Protection Service. Extend to 5'-0" beyond bldg. line. See Civil plans for continuation. x"I.D. Domestic water service. Extend to 5'-0" beyond bldg. line. See Civil plans for continuation. Meter & RPZ-1 FPHB +24" RC-1, locate above ceiling RC-1, locate above ceiling 1 1 1 2"CW 3 4"HWR 3 4"HW x"CW 3 4"HWR 1"HW x"CW 3 4"HWR 3 4"HW x"CW 1"HWR 1"HW x"CW 11 2"HW 11 2"CW 1"HWR 11 2"HW x"CW 1"HWR 11 2"HW x"CW x"CW 11 2"HW 1"HWR RH-1 40MBH RH-1 40MBH RH-1 40MBH RH-1 40MBH RH-1 40MBH RH-1 40MBH RH-1 40MBH RH-1 40MBH Nitrogen Control Panel. Field verify exact equipment location, prior to start of work. 1 2"Nitrogen down to equipmnet. Field verify exact equipment location, prior to start of work. 1 2"Nitrogen from tank. Field verify exact equipment location, prior to start of work. 2"G, as high as practical 11 2"G, above overhead doors 11 2"G, above overhead doors 11 4"G, above overhead doors 11 4"G, above overhead doors 11 4"G, above overhead doors 1"G, above overhead doors 3 4"G, above overhead doors 2"G up 2"G above ceiling 21 2"G down to meter (758,000 BTU @ 6" w.c.) A. All fittings, piping, fixtures, materials, etc. to meet the current Safe Drinking Water Act with all of its amendments and the Reduction of Lead in Drinking water Act. B. All work shall comply with all national, state, local codes and ordinances pertaining to the work in this project. C. All plumbing fixtures shall be supplied with individual water supply stops and code approved traps. Exposed piping shall be chrome plated. D. All plumbing fixtures shall be installed with approved backflow prevention devices. E. No piping shall pass directly over electrical power distribution cabinets, panelboards, etc. Contractor to coordinate panel locations prior to piping installation. F. All plumbing vents to be a minimum of 10'-0" from any air intake. Coordinate locations with HVAC plans. G. Single runouts to plumbing fixtures shall be the same size as on the plumbing fixture schedule unless otherwise noted. H. Concealed gas piping shall be constructed in accordance with code without unions, tubing fittings or running threads. I. Gas lines run on roof to be supported by Roof Top Blox or similar and equal. DO NOT USE LUMBER FOR GAS PIPING SUPPORT. J. Dry-pipe fire protection system shall be used in all areas subject to freezing. K. All waste, water, vent, gas and condensate lines shown to be connected to their associated fixture/equipment, unless noted otherwise. All equipment and systems shown must be complete and usable upon completion of project. General Notes: Set balancing station to 0.5 gpm. Plan Notes: 1 DRAWING TITLESEALSHEETPROJECT INFOREVISIONS22030 12-12-2022 # DESCRIPTION DATE 100% REVIEW ARCHITECTCLIENTPROJECTAddition &Renovations toOzwell FitnessCONSULTANT1077 3rd Avenue SW,Carmel INOZWELLfitnessGNIBMULP·LACITCELE·LACINAHCEMRTHEENGINEERINGCOLLABORATIV E P201FIRST FLOORPLUMBING WATER &GAS PLANSCALE: 3/16" = 1'-0"01 FIRST FLOOR PLUMBING WATER & GAS PLAN N O R T H 02/20/23