HomeMy WebLinkAboutC803 - STORM SEWER CONSTRUCTION DETAILSCIRCLE
DESIGN GROUP
INDIANAPOLIS. IN 1 317.781.6204
CI RC L EDESIG N GROU P.COM
EARTH OR SIDEWALK SURFACE
UNDERDRAIN TRENCH TO BE
FLUSH WITH BACK OF CURB
INSTALL NON —WOVEN FILTER —
FABRIC ON PERIMETER OF
TRENCH AND OVERLAP AT
SUBGRADE LEVEL
#B WASHED AGGREGATE
CONCRETE CURB OR CURB & GUTTER
': ' ' si .�S•: . Via.
z
GV
UNDERDRAIN
NO SCALE
NOTES:
PIPE SHALL CONFORM TO SPEC REQUIREMENTS
OF SECTION 718 OF STANDARD SPECIFICATION
PAVEMENT
ASPHALT OR COMPACTED AGGREGATE
NO. 53 PER TYPICAL SECTION
DOUBLE WALL PIPE, PERFORATED HANCOR
Hi-Q, TYPE 4 PIPE OR EQUIVALENT
PER SECTION 401.01 OF THE
STORM WATER TECHNICAL STANDARDS
INSTALLATION REQUIRED: BOTH SIDES OF PAVEMENT
AND WHERE REQUESTED BY THE CITY ENGINEER
CITY OF CARMEL STANDARDS STANDARD
DRAWING
UNDERDRAIN 10-12
UNDERDRAIN DETAIL
NTS
3'-0"
3'-0"
2'-061
yc7
6
24"
A.
FT
PLAN
SHAPED CONCRETE FILL
SECTION A —A
O
INLET - T YPE
NO SCALE
Y
C/)
o
y z
I
� �
NTS
INLET TYPE V DETAII
NO SCALE
L 6' MINIMUM OF TOPSOIL OR COMPACTED
—1 1 PAVEMENT SECTION VARIES AAGGIREGATE Oa3,
OF suecRADE '.. .. • • ' • .... '.. \�
FINAL
BACKFILL Bc +Ilrl' IIN.
SPRINGLINE
MUNCHING (Bc/6)
MINIMUM COVER SHALL
BE PER NOTE 3
r tag
Bc = OUTSIDE DIAMETER
D = INSIDE DIAMETER
d = DEPTH OF BEDDING
MATERIAL BELOW PIPE
DEPTH OF BEDDING
MATERIAL BELOW PIPE
BEDDING d D d MIN
60" do SMALLER 4"
NOTES- Bc I66' do LARGER 6'
1. BEDDING AND MUNCHING FOR ALL RCP INSTALLATIONS SHALL BE /8 STONE MEETING THE MATERIAL REQUIREMENTS OF THE
INDOT. BEDDING SHALL BE PLACED IN THE TRENCH BOTTOM SUCH THAT AFTER THE PIPE IS INSTALLED TO GRADE AND
LINE. THERE REMAINS A C MINIMUM DEPTH OF MATERIAL BELOW THE PIPE BARREL AND A MINIMUM OF 3" BELOW THE BELL,
FOR PIPE SIZES 66" AND LARGER, THE MINIMUM DEPTH OF MATERIAL BELOW THE PIPE BAREL SHALL BE 6". BEDDING SHALL
BE PLACED TO BE UNIFORM AS POSSIBLE, BUT SHALL BE LOOSELY PLACED UNCOMPACTED MATERIAL UNDER THE MIDDLE
THIRD OF THE PIPE PRIOR TID PLACEMENT OF THE PIPE. IF THE UNDERLYING SOILS OF THE TRENCH BOTTOM ARE SOFT OR
YIELDING THE SOIL SHALL BE UNDERCUT TO SUCH A DEPTH THAT WHEN REPAIRED WITH #2 STONE IT WILL PRODUCE A
UNIFORM AND STABLE FOUNDATION ALONG THE ENTIRE LENGTH OF THE PIPE MUNCHING AND INITAIL BACKFILL SHALL BE
COMPACTED IN 8' MAXIMUM LIFTS TID NOT LESS THAN 9OX STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTH OF THE
MATERIAL PLACED. THE BACKFILL SHALL BE BROUGHT UP EVENLY ON BOTH SIDES OF THE PIPE FOR THE FULL LENGTH OF
THE PIPE MUNCHING SHALL EXTEND TO THE SPRINGLINE OF THE PIPE MINIMUM TRENCH WIDTH SHALL BE THE OUTSIDE
DIAMETER OF THE PIPE PLUS 18'.
2. FINAL BACKFILL FOR ALL RCP INSTALLATIONS WHERE 'L" IS 5' OR LESS SHALL BE B—BORROW FOR STRUCTURE BACKFILL
MEETING THE MATERIAL REQUIREMENTS OF THE INDOT AND SHALL BE COMPACTED IN 6' MAXIMUM LIFTS TID NOT LESS
THAN 95X STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTH OF THE MATERIAL PLACED. THE BACKFILL FOR THE
TOP 6" OF THE EXCAVATION BELOW THE LIMIT OF SUBGRADE SHALL BE #53 STONE MEETING THE MATERIAL
REQUIREMENTS OF THE INDOT AND SHALL BE COMPACTED TO NOT LESS THAN 95X STANDARD PROCTOR
DENSITY. FINAL BACKFILL FOR ALL RCP INSTALLATIONS WHERE "L' IS GREATER THAN 5' SHALL BE CLEAN FILL
MATERIAL FREE OF ROCKS LARGER THAN 6' IN DIAMATER, FROZEN LUMPS OF SOIL, WOOD OR OTHER EXTRANEOUS
MATERIAL. COMPACTED IN 12" MAXIMUM LIFTS TO NOT LESS THAN 9OX STANDARD PROCTOR DENSITY FOR THE ENTIRE
DEPTH OF THE EXCAVATION. CONTRACTOR SHALL PROVIDE A 3rd PARTY TESTING AGENCY TO PROVIDE COMPACTION TESTING
AS NECESSARY.
3. FOR INSTALLATION OF STORM MAINS, WATERMAINS, SANITARY MAINS, WATER SERVICE LATERALS AND SANITARY
SERVICE LATERALS UNDER CITY STREETS, REGARDLESS OF THE JURISDICTION OF THE UTILITY, THE MINIMUM
COVER FROM THE TOP OF THE INSTALLED PAVEMENT OR FINAL GROUND ELEVATION TO THE TOP OF THE INSTALLED PIPE
SHALL BE NO LESS THAN 2.5 FEET OF COVER ALONG ANY PART OF THE PIPE IF THE STANDARD PRACTICE OF THE
UTILITY THAT HAS JURISDICTION OVER THE INSTALLATION HAS A MORE STRINGENT COVER REQUIREMENT,
THE MORE STRINGENT REQUIREMENT SHALL GOVERN.
4. IF EXISTING SUBGRADE HAS BEEN LIME STABILIZED, BACKFILL WITH B—BORROW TO BOTTOM OF EXISTING SUBGRADE
AND FILL TO THE LIMIT OF EXISTING SUBGRADE WITH COMPACTED AGGREGATE NO 53.
5. THESE STANDARDS SHALL APPLY FOR STORM SEWERS INSTALLED WITHIN EXISTING AND PROPOSED CITY R/W AND FOR
STORM SEWERS THAT SHALL BE MAINTAINED BY THE CITY, REGARDLESS OF STORM SEWER JURISDICTION.
6. ALL STORM PIPE WITHIN EXISTING OR PROPOSED CITY R/W SHALL BE REINFORCED CONCRETE PIPE REGARDLESS OF
JURISDICTION OVER STORM RPM
CITY OF CARMEL STANDARDS STANDARD
DRAWING
TRENCH DETAIL FOR CITY STORM SEWERS 10-31
TRENCH DETAIL FOR STORM SEWERS
NTS
CLEANOUT COVER
THREADED —TYPE
WATER TIGHT &
CAPPED AT ALL
TIMES
FINISH GRADE,, CLEANOUT PLUG
BLDG FAC
6" PVC PIPE
PAINTED TO
MATCH BLDG.
ROUND FLANGED HOUSING
,W/HEAVY DUTY CAST IRON COVER
JAY R. SMITH 4251
/18"X18"X4" THICK CONCRETE PAD
RISER PIPE SAME AS SEWER
STORM CLEANOUT
NO SCALE
SLOPE
DOWNSPOUT CONNECT ON DETAIL
NO SCALE
6" 10" 6" SLOPE 1 /2"
PAVEMENT PAVEMENT
°f O °.
BROOM FINISH
NEENAH R-4990DX W/
"C" GRATE & "X" FRAME
9 III—III=III_
1=1 11=1 I MI
=III=III=III=III=III=I=III=III—II' COMPACTED SUBGRADE
I —I I I I; ,III-1 I I=1 11=1 11=1 I I —III —I I i-
=1
TRENCH DRAIN -IIDIETA L
NTS NO SCALE
o°. o
WEEP HOLES---' 2'-0 SO. 6';. WEEP HOLES
DO
°°A
6" STONE BASED SEE SHEET C301 FOR PIPE
SIZES AND INVERT ELEV.
NLET TYPE 'A MOD F ED'
SCALE: 3/4"=1'O"
Engineer:
0.
,.��°°gyp •8 • HUFF'''%
910023
; STATE OF ,' Or
0%
Y
O
FF
IN
&1!ff
KEY PLAN
CARMEL CITY CENTER
SCALE: NTS (&
PLAN NORTH
Developer:
P E D C O R
' 'eex
DEVELOPMENT CO.
Project:
ohm
COPYRIGHT & OWNERSHIP OF DOCUMENTS
THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE
PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP, LLC. ALL
INFORMATION CONTAINED HEREIN IS CONFIDENTIAL. ITS SUBMISSION
AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS
PUBLICATION IN DEROGATION OF COMMON LAW COPYRIGHT,
INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS. ALL
INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND
PUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND
PEDCOR DESIGN GROUP, LLC. NO PART OR WHOLE OF THIS DESIGN,
THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR
PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE
DUPLICATED, COPIED, EXHIBITED, PHOTOGRAPHED, PUBLISHED,
MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE
SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R.
STUTZMAN AND PEDCOR DESIGN GROUP, LLC. m COPY RIGHT 2015
JAMES R. STUTZMAN, AIA, Cannel, Indiana.
CONSTRUCTION DOCUMENTS
Q z Set Issue Date Sheet Issue Date
06/30/21
Drawn By Checked By
DBH RDM
Last Revision Date:
11/19/21 - CITY OF CARMEL ADLS COMMENTS
Sheet Title:
STORM SEWER
CONSTRUCTION DETAILS
Sheet Number:
C803