SHEET NO.CHECKED BY:DRAWN BY:DEGDESIGNED BY:DWG NAME:PROJECT NO.:W220058DATEBY01.31.2022BTDATE:DEGSTEVEN SCOTT RUCKER P.E. 11300279ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMA PART OF THE SOUTHWEST QUARTER, SECTION 31, TOWNSHIP 18 NORTH, RANGE 4 EAST, HAMILTON COUNTY, INDIANAW22.0058431 E CARMEL DRIVE, CARMEL, IN 46032Know what's below.
before you dig.Call
R
CULVER'SCARMEL, IN04.29.2022DEGTAC COMMENT REVISIONS105.13.2022AMQLANDSCAPE COMMENT REVISIONS206.24.2022BTREMOVE PARKING ISLAND AND TRANSFORMER3TAC COMMENT REVISIONS 2407.07.2022DEGWQ TREATMENT TRAIN & WATER COMMENTS508.12.2022DEGADDED FIRE HYDRANT & FDC AND DRY LINE608.25.2022DEGRELOCATED IRRIGATION VALVE & METER709.29.2022DEGSWPPP2 UPDATE TO CLARIFY WQ UNIT & EASEMENT810.06.2022DEGCRE REVIEW COMMENT REVISIONS910.24.2022DEGADDED SURVEY DATA FOR EAST ADJOINER1011.23.2022DEGGENERAL NOTES
1.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
VERIFY WITH THE OWNER DURING BIDDING AND DURING
CONSTRUCTION ACTIVITIES ALL ITEMS TO BE REMOVED. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO REMOVE ANY
MATERIALS AND/OR STRUCTURES NOT LOCATED ON THIS SURVEY
FOR THE INSTALLATION OF THE NEW WORK.
2.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
VERIFY ALL EXISTING UTILITIES PERTAINING TO THEIR PHASE OF
WORK, AND TO VERIFY WHICH UTILITIES WILL BE REMOVED BY
UTILITY COMPANY. ANY AND ALL UTILITIES NOT REMOVED BY THE
UTILITY COMPANY SHALL BE REMOVED BY THE CONTRACTOR.
3.UTILITIES ARE SHOWN TO BE APPROXIMATE AND SHALL BE
RELOCATED AND/OR CAPPED AND ABANDONED BEFORE
CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER.
4.ALL DEMOLITION MATERIAL AND SALVAGEABLE MATERIAL IS THE
PROPERTY OF THE DEMOLITION CONTRACTOR AND SHALL BE
PROPERLY DISPOSED OF OFF THE SITE.
5.SLABS ON GRADE MUST BE REMOVED COMPLETELY AND TAKEN
OFF THE SITE.
6.ALL UTILITIES MUST REMAIN ACTIVE FOR AREA TENANTS THAT
ARE REMAINING. NO UTILITY SERVICE SHALL BE INTERRUPTED
DURING THE CONSTRUCTION PROCESS.
7.BEARINGS, DIMENSIONS, AND EASEMENTS ARE SHOWN FOR
REFERENCE ONLY. SEE RECORD SURVEYS AND PLATS FOR
EXACT INFORMATION.
8.ANY EXISTING TREE(S) THAT MAY REQUIRE REMOVAL BUT ARE
NOT SHOWN ON THE PLAN AS BEING REMOVED MAY BE DONE SO,
AS LONG AS THE TREE(S) ARE RELOCATED TO AN APPROVED
ALTERNATIVE LOCATION ON SITE.
9.IF THERE ARE ANY QUESTIONS CONCERNING THIS DEMOLITION
PLAN, PLEASE CONTACT THE ENGINEER BEFORE CONTINUING
WORK.
EROSION CONTROL NOTES
1.ALL DISTURBED AREAS SHALL BE SODDED OR SEEDED, EXCEPT
BUILDING PAD AND LANDSCAPE BEDS. SEE LANDSCAPE PLANS FOR
LOCATION OF LANDSCAPE BEDS.
2.INSTALL SILT DIKE ALONG ALL DOWNSTREAM SLOPES.
3.THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIAL IN
THE STREET.
EROSION CONTROL SPECIFICATIONS
1.THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL
SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY OF
EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING
PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE
PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE
CONSULTED IN THE EVENT THIS HAPPENS.
2.TEMPORARY SEEDING IS TO BE APPLIED TO ANY DISTURBED AREA
THAT WILL REMAIN UNALTERED IN EXCESS OF 15 DAYS.
3.PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS
THAT HAVE ACHIEVED FINAL AND FINISHED GRADE.
4.PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND
WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION.
5.ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED
PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA THEY
ARE INTENDED TO SERVICE. ALL EROSION CONTROL MEASURES
PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE THEIR
EFFECTIVENESS.
6.IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY
OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED.
7.DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS
OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT
GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED
ACCORDING TO SEASONAL CONDITION AND/OR CONSTRUCTION
ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL
FULL STAND OF GRASS HAS BEEN OBTAINED.
8.THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION
CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR
AND/OR OWNER.
9.FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION
CHART IN THESE PLANS.
10.PORTABLE TOILETS MUST BE ANCHORED.
SITE PLAN GENERAL NOTES
1.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, OR
VERIFYING THAT ALL PERMITS AND APPROVALS ARE OBTAINED FROM
THE RESPECTIVE CITY, COUNTY, AND STATE AGENCIES PRIOR TO
STARTING CONSTRUCTION.
2.ALL QUANTITIES GIVEN ON THESE PRINTS, VERBALLY OR IN THE
SCOPE OF WORK SECTION ARE ESTIMATES AND SHALL BE CONFIRMED
BY THE BIDDING CONTRACTORS.
3.OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
STANDARDS FOR EXCAVATIONS; FINAL RULE 29 CFR PART 1926,
SUBPART "P" APPLIES TO ALL EXCAVATIONS EXCEEDING FIVE (5) FEET
IN DEPTH. IN ADDITION, EXCAVATION EXCEEDING TWENTY (20) FEET IN
DEPTH REQUIRE THE DESIGN OF A TRENCH SAFETY SYSTEM BY A
REGISTERED PROFESSIONAL ENGINEER.
4.IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER AND
CONTRACTOR TO MAINTAIN QUALITY CONTROL THROUGHOUT THIS
PROJECT.
5.TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO
CONFORM TO APPLICABLE LOCAL STANDARDS.
6.BEARINGS, DIMENSIONS, AND EASEMENTS ARE SHOWN FOR
REFERENCE ONLY. SEE RECORD SURVEYS AND PLATS FOR EXACT
INFORMATION.
7.THE ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE
CONSTRUCTION MEANS AND METHODS ASSOCIATED WITH THE
PROJECT.
8.ALL DIMENSIONS ARE BASED ON FACE OF CURB OR BACK OF ROLL
CURB OR FACE OF BUILDING.
9.SEE ARCHITECTURAL PLANS FOR DETAILS OF BUILDING, BUILDING
DIMENSIONS AND SIGNAGE SPECIFICATIONS. DO NOT STAKE BUILDING
FROM THESE PLANS.
10.COORDINATE CONSTRUCTION ACTIVITIES WITH ADJOINING WORK IF
APPLICABLE. VERIFY EXTENT OF ADJOINING WORK AND COORDINATE
AS REQUIRED.
11.FIELD VERIFY EXISTING CURBS AND TAPER PROPOSED VERTICAL
CURBS TO MATCH WITHIN A MIN. OF THREE (3) FEET.
12.± DIMENSIONS INDICATE FIELD DIMENSION ADJUSTMENT AREA BASED
ON ACTUAL FIELD LAYOUT COORDINATES.
13.THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR
TO START OF CONSTRUCTION. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES
ARE FOUND IN THESE PLANS FROM ACTUAL FIELD CONDITIONS, THE
CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY.
14.PROVIDE SMOOTH TRANSITION FROM NEWLY PAVED AREAS TO
EXISTING AREAS AS NECESSARY. ALL AREAS WHERE PROPOSED
PAVEMENT MEETS EXISTING PAVEMENT, THE EXISTING EDGE OF
PAVEMENT SHALL BE FREE OF ALL LOOSE DEBRIS. THE EDGE OF
EXISTING ASPHALT PAVEMENT SHALL BE PROPERLY SEALED WITH A
TACK COAT MATERIAL IN ALL AREAS WHERE NEW ASPHALT PAVEMENT
IS INDICATED TO JOIN EXISTING.
15.RESURFACE OR RECONSTRUCT AT LEAST TO ORIGINAL CONDITIONS
ALL AREAS WHERE THE EXISTING PAVEMENT OR LAWNS ARE
DAMAGED DURING CONSTRUCTION FROM TRAFFIC BY CONTRACTORS,
SUBCONTRACTORS, OR SUPPLIERS AFTER CONSTRUCTION WORK IS
COMPLETE.
16.THE CONTRACTOR SHALL PROTECT AND NOT DESTROY THE
PROPERTY CORNER MONUMENTS DURING CONSTRUCTION.
17.REFER TO ARCHITECTURAL PLANS FOR BUILDING ACCESSORY
DETAILS.
18.REFER TO SITE PLAN DETAILS UNLESS OTHERWISE NOTED.
19.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL BE
RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE
COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED
TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START
OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITIONS TO THE
RIGHT-OF-WAY.
20.ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT
-OF-WAY SHALL CONFORM TO THE REQUIREMENTS OF THE
DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT
THE DEPARTMENT OF ENGINEERING TO SCHEDULE A
PRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'S
CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION
REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF
THE WORK AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS
IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED
RIGHT-OF-WAY.
GENERAL GRADING NOTES
1.CONTRACTOR SHALL REFER TO THE STORMWATER POLLUTION
PREVENTION PLAN AND DETAILS FOR CONSTRUCTION SCHEDULING AND
EROSION CONTROL MEASURES TO BE INSTALLED PRIOR TO
EARTHMOVING ACTIVITIES.
2.THE SECTIONS BELOW FOR VARIOUS ITEMS ARE TO CLARIFY THE INTENT
OF THE REQUIREMENTS FOR THIS PROJECT. PLEASE NOTE THAT OTHER
SECTIONS OF THE MODOT STANDARD SPECIFICATIONS MAY ALSO BE
APPLICABLE.
3.TOPSOIL SHALL BE STRIPPED FROM ALL AREAS TO RECEIVE PAVING AND
FROM WITHIN THE LIMITS OF PROPOSED BUILDINGS AND STRUCTURES.
TOPSOIL SHALL BE STRIPPED TO THE DEPTH AS NOTED IN THE
GEOTECHNICAL REPORT.
4.AFTER STRIPPING TOPSOIL, PROOFROLL AREAS TO BE FILLED WITH A
MEDIUM WEIGHT ROLLER TO DETERMINE LOCATIONS OF ANY POCKETS OF
UNSUITABLE MATERIAL. RECOMMENDATIONS FOR DRYING, AMENDING
AND/OR REMOVAL OF ANY UNSUITABLE MATERIAL WITHIN THE PROPOSED
PAVED AND/OR BUILDING AREAS WILL BE DETERMINED AT THE TIME OF
CONSTRUCTION BY THE OWNER'S GEOTECHNICAL TESTING
REPRESENTATIVE.
5.TOPSOIL SHALL BE PLACED IN MOUNDING AREAS, NONSTRUCTURAL FILL
AND/OR PLANTING AREAS TO A MINIMUM DEPTH OF 6". EXCESS TOPSOIL
SHALL BE REMOVED FROM THE SITE.
6.WHEN PERFORMING GRADING OPERATIONS DURING PERIODS OF WET
WEATHER, PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND
WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO
GEOTECHNICAL REPORT AND/OR CONSULT WITH OWNER'S
GEOTECHNICAL TESTING REPRESENTATIVE FOR RECOMMENDATIONS.
7.FILL MATERIAL SHALL CONSIST OF EARTH OBTAINED FROM CUT AREAS,
BORROW PITS OR OTHER APPROVED SOURCES. EARTH SHALL BE FREE
FROM ORGANIC MATTER AND OTHER DELETERIOUS SUBSTANCES AND
LARGE ROCKS. THE FILL MATERIAL SHALL BE PLACED IN LAYERS NOT TO
EXCEED SIX INCHES FOLLOWING COMPACTION, PROPER MOISTURE
CONTENT OF FILL MATERIAL WILL BE SUCH TO ACHIEVE SPECIFIED
COMPACTION DENSITY. ALL FILL BENEATH PAVED AREAS, FLOOR SLABS
AND FUTURE BUILDINGS SHALL BE COMPACTED TO AT LEAST 95% OF THE
MAXIMUM DRY DENSITY PER ASTM D-1557. FIELD COMPACTING TEST
SHALL BE RUN ON EACH LIFT, IN FILL SECTIONS, AND THE REQUIRED
COMPACTION ON EACH LIFT SHALL BE IN ACCORDANCE WITH MODOT
SECTION 211.
8.MAXIMUM LAWN SLOPE IS 3:1.
9.THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED
WITHIN THE LIMITS OF CONSTRUCTION ACCORDING TO INFORMATION
PROVIDED BY THE VARIOUS UTILITY COMPANIES, PREVIOUS
CONSTRUCTION PLANS AND AS EVIDENCED BY OBSERVATION OF ABOVE
GROUND CONDITIONS BY THE SURVEYOR. THE ACCURACY OF THIS
INFORMATION IS NOT GUARANTEED.
10.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE
MAINS, CONDUITS, SERVICE LINES, ETC. WITHIN THE CONSTRUCTION
LIMITS. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR
SUPPORT AND MAINTENANCE DURING CONSTRUCTION (IN COOPERATION
WITH APPLICABLE UTILITY COMPANY) IS THE EXPRESSED RESPONSIBILITY
OF THE CONTRACTOR.
11.ALL SPOT ELEVATIONS ARE TO FINISHED GRADE.
12.COMPACTED "B" BORROW BACK FILL REQ'D. OVER ALL UTILITIES IN PAVED
AREAS.
13.ALL GRADES AT BOUNDARY SHALL MEET EXISTING. CONTRACTOR SHALL
ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A
SMOOTH FIT AND CONTINUOUS GRADE. BUTT JOINTS SHALL BE PROVIDED
AT TRANSITIONAL AREAS BETWEEN PROPOSED AND EXISTING PAVEMENT.
14.ANY PART OF SANITARY OR STORM SEWER TRENCHES RUNNING UNDER
OR WITHIN 5' OF PAVEMENT TO BE BACKFILLED WITH GRANULAR
MATERIAL.
15.ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE
WITH O.S.H.A. STANDARDS FOR WORKER SAFETY.
16.THE CONTRACTOR SHALL CONFIRM ALL EARTHWORK QUANTITIES PRIOR
TO THE START OF CONSTRUCTION. IF AN EXCESS OR SHORTAGE OF
EARTH IS ENCOUNTERED, THE CONTRACTOR SHALL CONFIRM WITH THE
OWNER AND ENGINEER THE REQUIREMENTS FOR STOCKPILING, REMOVAL
OR IMPORTING OF EARTH.
17.PROVIDE POSITIVE DRAINAGE WITHOUT PONDING IN ALL AREAS AFTER
INSTALLATION. CONTRACTOR TO TEST FOR AND CORRECT ANY PONDING
CONDITIONS. ANY AREAS THAT HOLD WATER MORE THAN 1/8" DEEP SHALL
BE CUT OUT AND CORRECTED TO POSITIVE DRAINAGE AT NO COST TO
THE OWNER/ DEVELOPER OR ENGINEER.
18.ADA ACCESSIBLE PARKING SPACES, RAMPS, AND ROUTES SHALL BE IN
ACCORDANCE WITH THE LATEST ADA STANDARDS FOR ACCESSIBLE
DESIGN.
19.VERTICAL CURVES, WITH A MINIMUM LENGTH OF 50', SHALL BE USED
WHERE POSSIBLE BETWEEN VERTICAL CHANGES IN DIRECTION (SLOPE)
TO ALLOW FOR POSITIVE DRAINAGE AND SMOOTH TRANSITIONS.
20.CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL
SEPARATION (AS MEASURED FROM THE EXTERIOR OF THE PIPES)
BETWEEN SANITARY SEWER FACILITIES, WATER MAIN, AND STORM
SEWERS IS 18" OR LESS.
21.ALL DISTURBED AREA SHALL BE STABILIZED IN ACCORDANCE TO THE
STORM WATER POLLUTION PREVENTION PLAN AND LANDSCAPE PLAN.
22.ADJUST ANY STEEL MANHOLE LIDS IN THE PROPOSED SIDEWALK WITHIN
THE RIGHT OF WAY.
23.PER SECTION 303.07 "DRAINAGE SYSTEM OVERFLOW DESIGN" OF THE CITY
OF CARMEL ENGINEERING CONSTRUCTION & DESIGN STANDARDS
CHAPTER 300, THE MINIMUM FLOOD PROTECTION GRADE (MFPG) OF ALL
STRUCTURES FRONTING A POND OR OPEN DITCH SHALL BE NO LESS THAN
2 FEET ABOVE ANY ADJACENT 100-YEAR LOCAL OR REGIONAL FLOOD
ELEVATIONS, WHICHEVER IS GREATER, FOR ALL WINDOWS, DOORS, PIPE
ENTRANCES, WINDOW WELLS, AND ANY OTHER STRUCTURE MEMBER
WHERE FLOODWATERS CAN ENTER A BUILDING.
23.PER SECTION 303.06 "DRAINAGE SYSTEM OVERFLOW DESIGN" OF THE CITY
OF CARMEL ENGINEERING CONSTRUCTION & DESIGN STANDARDS
CHAPTER 300, THE LOWEST ADJACENT GRADE SHALL BE SET A MINIMUM
OF 2 FEET ABOVE THE 100-YEAR POND ELEVATION OF 2 FEET ABOVE THE
EMERGENCY OVERFLOW WEIR ELEVATION, WHICHEVER IS HIGHER.
GENERAL UTILITY NOTES
1.THE CONTRACTOR SHALL CONTACT APPLICABLE STATE UNDERGROUND
LOCATION SERVICE AT LEAST 72 HOURS PRIOR TO ANY WORK AND SHALL
CONTACT THE OWNER AND/OR ENGINEER SHOULD UTILITIES APPEAR TO BE IN
CONFLICT WITH THE PROPOSED IMPROVEMENTS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES
WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS.
2.THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED WITHIN THE
LIMITS OF CONSTRUCTION ACCORDING TO INFORMATION PROVIDED BY THE
VARIOUS UTILITY COMPANIES, PREVIOUS CONSTRUCTION PLANS AND AS
EVIDENCED BY OBSERVATION OF ABOVE GROUND CONDITIONS BY THE
SURVEYOR. THE ACCURACY OF THIS INFORMATION IS NOT GUARANTEED.
3.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS,
CONDUITS, SERVICE LINES, ETC. WITHIN THE CONSTRUCTION LIMITS. THE
LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND
MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITH APPLICABLE
UTILITY COMPANY) IS THE EXPRESSED RESPONSIBILITY OF THE CONTRACTOR.
4.THE CONTRACTOR SHALL CONTACT ALL APPLICABLE UTILITIES AND VERIFY ANY
AND ALL FEES ASSOCIATED WITH THE INSTALLATION OF ALL UTILITIES.
5.ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH
O.S.H.A. STANDARDS FOR WORKER SAFETY.
6.ANY PART OF SANITARY OR STORM SEWER TRENCHES RUNNING UNDER OR
WITHIN 5' OF PAVEMENT TO BE BACKFILLED WITH GRANULAR MATERIAL.
7.IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY LOCATION, SIZE, AND
ELEVATION OF EXISTING UTILITIES, STRUCTURES, PIPES, PAVEMENTS, ETC. AS
RELATED TO THEIR WORK. NOTIFY ENGINEER OF ANY CONFLICT AND/OR
DISCREPANCIES IN THE CONSTRUCTION DOCUMENTS.
8.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL CLEARANCE BETWEEN STORM /
SANITARY SEWER SYSTEMS AND DOMESTIC/FIRE LINE SERVICE. SANITARY
SEWER LINE IN PROXIMITY OF WATER LINE SHALL BE C900 WATER MAIN GRADE
PVC.
9.CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL
SEPARATION (AS MEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN
SANITARY SEWERS, WATER MAINS AND STORM SEWERS IS 18" OR LESS.
10.IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING
CONSTRUCTION, IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR
AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO
EXISTING CONDITIONS OR BETTER.
11.WHEN PERFORMING EXCAVATIONS DURING PERIODS OF WET WEATHER,
PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER
MANAGEMENT TO CONTROL MOISTURE OF SOILS.
12.COMPACTED "B" BORROW BACK FILL REQUIRED OVER ALL UTILITIES IN PAVED
AREAS.
13.ALL UTILITY STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT
AND SHALL HAVE TRAFFIC BEARING RING AND COVERS.
14.PROVIDE THRUST BLOCKS FOR ALL WATER LINE BENDS AND TEES, INCLUDING
TAP CONNECTION.
15.CONTRACTOR SHALL COORDINATE WITH WATER COMPANY FOR DOMESTIC AND
FIRE SERVICE. CONNECT TO BUILDING DOMESTIC AND FIRE LINE. COORDINATE
WITH PLUMBING DRAWINGS.
16.COORDINATE LOCATION OF ELECTRICAL AND COMMUNICATION LINES WITH
LOCAL UTILITIES.
17.COORDINATE LOCATION OF REQUIRED CONDUITS FOR ELECTRIC SERVICE, LIGHT
POLES, COMMUNICATION SERVICE AND IRRIGATION SYSTEM.
18.COORDINATE LOCATION AND SIZE OF GAS SERVICE CONNECTION AND
INSTALLATION OF SERVICE LINE AND METER WITH GAS COMPANY.
19.COORDINATE LOCATIONS AND CONNECTIONS OF BUILDING STORM LINES WITH
PLUMBING DRAWINGS.
20.FOLLOW ALL LOCAL AND STATE CODES IN REFERENCE TO DOMESTIC/FIRE LINE
INSTALLATION AND STORM SEWER / SANITARY SEWER INSTALLATION.
21.SANITARY SEWER LATERAL, WATER SERVICE, & ELECTRICAL/COMMUNICATION
CONDUITS SHALL BE GRANULAR BACKFILL FOR ENTIRE RUN.
22.ALL EXISTING MANHOLE AND CATCH BASIN GRATES, WATER OR GAS VALVES
SHALL BE ADJUSTED TO NEW FINISH GRADE ELEVATIONS.
23.WATER LINES TO BE BURIED BELOW THE FROST LINE PER LOCAL WATER
COMPANY STANDARDS.
24.UTILITY CROSSINGS UNDER PAVEMENT (BORE/JACK & BORE). AVOID OPEN CUTS.
25.TRACER WIRE IS REQUIRED ON TOP OF THE LATERAL FROM THE BUILDING
CLEANOUT TO THE RIGHT-OF-WAY CLEANOUT OR LATERAL ASSEMBLY.
26.PLEASE NOTE THAT COPPER OR DUCTILE IRON PIPE MUST BE RUN FROM 5 FEET
OUTSIDE OF THE BUILDING FOOTER INTO THE BUILDING TO THE METER SETUP.
27.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE
RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR
ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOMENT
SHALL BE THE DEVELOPER TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES
REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED
RIGHT-OF-WAY LINE.
LANDSCAPE GENERAL NOTES
1.IN CASE OF DISCREPANCIES BETWEEN THE PLAN AND THE PLANT LIST,
THE PLAN SHALL DICTATE. IF IN QUESTION, CONTACT THE LANDSCAPE
DESIGNER.
2.ALL SHRUBS PLANTING AREAS TO BE COVERED WITH 3" THICK LAYER OF
SHREDDED HARDWOOD BARK MULCH. ALL GROUND COVER BEDS SHALL
BE COVERED WITH 1" SHREDDED HARDWOOD BARK MULCH. BARK MULCH
SHALL BE APPROVED BY LANDSCAPE DESIGNER AND SHALL BE UNIFORM
IN TEXTURE AND COLOR AND SHALL BE OBTAINED FROM SAWMILL OR
LUMBERING OPERATIONS. NO UTILITY MULCH OR PROCESSED TREE
TRIMMINGS WILL BE ALLOWED.
3.AN APPROVED PRE-EMERGENT HERBICIDE SHALL BE APPLIED IN ALL
PLANTING AND GROUND COVER BEDS AT RATES SPECIFIED BY
MANUFACTURER FOR EACH VARIETY OF PLANT.
4.FINAL PLACEMENT OF PLANT MATERIALS, ETC. SHALL BE APPROVED BY
LANDSCAPE DESIGNER BEFORE PLANTING OPERATIONS ARE TO
PROCEED. ALL TREE LOCATIONS SHALL BE MARKED WITH A WOODED
STAKE INDICATING VARIETY AND SIZE OF TREE. ALL GROUND COVER AND
MULCH BED LINES SHALL BE MARKED BY A HIGHLY VISIBLE PAINT LINE
WITH OCCASIONAL WOOD STAKES FOR REFERENCE. ALL STAKES SHALL
BE REMOVED FOLLOWING PLANTINGS OPERATIONS. LANDSCAPE
DESIGNER RESERVES THE RIGHT TO ADJUST PLANT LOCATIONS ON SITE.
5.NO SUBSTITUTIONS OF PLANT MATERIAL WILL BE ALLOWED. IF PLANTS
ARE SHOWN TO BE UNAVAILABLE, THE CONTRACTOR SHALL NOTIFY
LANDSCAPE DESIGNER PRIOR TO BID DATE IN WRITING. ALL PLANTS
SHALL BE INSPECTED AND TAGGED WITH PROJECT IDENTIFICATION AT
NURSERY OR CONTRACTORS OPERATION PRIOR TO MOVING TO JOB SITE.
PLANTS MAY ALSO BE INSPECTED AND APPROVED OR REJECTED ON THE
JOB SITE.
6.ALL PLANTS ARE TO MEET OR EXCEED AMERICAN STANDARDS FOR
NURSERY STOCK, LATEST EDITION, AS SET FORTH BY AMERICAN
ASSOCIATION OF NURSERYMEN.
7.PLANTS AND ALL OTHER MATERIALS TO BE STORED ON SITE WILL BE
PLACED WHERE THEY WILL NOT CONFLICT WITH CONSTRUCTION
OPERATIONS AND AS DIRECTED BY OWNER.
8.ALL NEW LANDSCAPE PLANTINGS SHALL BE GUARANTEED FOR A PERIOD
OF ONE YEAR FOLLOWING FINAL INSPECTION BY LANDSCAPE DESIGNER.
AT THE END OF THIS PERIOD, PLANT MATERIAL TERMED DEAD OR
UNSATISFACTORY BY LANDSCAPE DESIGNER SHALL BE REPLACED AT NO
ADDITIONAL CHARGE BY THE LANDSCAPE CONTRACTOR.
9.THE LANDSCAPE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS
AND FEES THAT MAY BE REQUIRED FOR HIS PORTION OF WORK.
10.PEAT MOSS TO BE USED ON PROJECT SHALL BE A DOMESTIC OR
IMPORTED MATERIAL, CHOCOLATE BROWN IN COLOR AND COMPOSED OF
PARTIALLY DECOMPOSED VEGETABLE MATERIAL. PEAT MOSS TO ALSO
BE MILDLY ACIDIC IN CHARACTER AND SHALL MEET APPROVAL OF
LANDSCAPE DESIGNER.
11.LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE DESIGNER IN
WRITING PRIOR TO BID DATE OF ANY PLANTS THAT HE FEELS MAY NOT
SURVIVE IN LOCATIONS NOTED.
12.ALL LANDSCAPING PLANTINGS TO BE MAINTAINED FOR 2 YEAR
FOLLOWING TURNOVER. MAINTENANCE TO INCLUDE WATERING,
WEEDING, CULTIVATION, MULCHING, MOWING AND ALL OTHER
NECESSARY OPERATIONS REQUIRED FOR PROPER ESTABLISHMENT OF
PLANTINGS. NOTE: AT END OF MAINTENANCE PERIOD, CONTRACTOR TO
REMOVE GUYING AND STAKING FROM TREES.
13.CONTRACTOR TO SUBMIT UNIT PRICES ON EVERY TYPE OF WORK AS
REQUESTED BY LANDSCAPE DESIGNER.
14.BACKFILL FOR TREE AND SHRUB PLANTING SHALL BE 75% APPROVED
TOPSOIL AND 25% APPROVED PEAT MOSS. TOP LAYER OF BACKFILL
SHALL BE 100% EXISTING TOPSOIL. A 5-10-5 ANALYSIS SLOW RELEASE
FERTILIZER SHALL BE INCORPORATED INTO BACKFILL AT APPROVED
RATES.
15.PROVIDE MINIMUM 4" PLANTING SOIL IN ALL GROUND COVER AND
FLOWER AREAS WITH MIXTURE COMPRISING OF ONE PART COMMERCIAL
GRADE 'POTTING SOIL,' 5 PARTS TOPSOIL AND 4 PARTS PEAT MOSS. A
FULL 4" LAYER OF APPROVED SHREDDED FIBROUS PEAT MOSS MAY BE
USED IN LIEU OF PLANTING MIX.
16.PLANTS SHALL BEAR A TAG SHOWING GENUS, SPECIES AND VARIETY.
17.PLANTS SHALL BE CERTIFIED BY THE STATE OF INDIANA DEPARTMENT OF
NATURAL RESOURCES AND FREE FROM DISEASE OR HAZARDOUS
INSECTS.
18.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL
EXISTING UTILITIES PERTAINING TO THEIR PHASE OF WORK. UTILITIES
ARE SHOWN TO BE APPROXIMATE. CALL UTILITY LOCATE PRIOR TO ANY
PLACEMENT OF PLANT MATERIAL OR OTHER LANDSCAPE MATERIAL.