HomeMy WebLinkAboutC2.1 SITE STABILIZATION - SWPPP21-STY BRICK AND FRAME COMMERCIAL BUILDING C C C C C C C C C C C C C C C C C C C C C C C C C 6" STORM -PREFERREDLOCATION4" FOODWASTE4" SANWASTEGAS SERVICECT CABSTORM DROP FROM ROOF -PREFERRED LOCATIONTHIS AREA IS FOR MENU BOARDS AND OCB ONLY.NO UNDERGROUND GREASE TRAPS OR ABOVEGROUND ELECTRICAL TRANSFORMERS; SEE SITEPLAN FROM CFS.VERIFY ALL UNDERGROUND WORK THIS AREA w/SIGN CONTRACTOR.FIRE PROTECTION 2" WATER SERVICEFDC DIRECT CONNECTIONSFOR VENDORSPICKUP WINDOWSANSANSANSANSANSAN SAN SAN SANSANSANSANSAN G G G GGGGGGGGGGGG E E E E E ECCCCC W WWWWWWWWWWWWFFE = 834.00 STM STM STM ST ST PATIO ST W W WWWWWWWWWWWWSTMSTMSTMCONTACT PERSON FOR EROSION CONTROL & SEDIMENT PRACTICES WEIHE ENGINEERS, INC. 10505 N. COLLEGE AVE. INDIANAPOLIS, IN 46268 TELEPHONE: (317) 846-6611 FAX: (317) 843-0546 EMAIL: PARKERF@WEIHE.NET CONTACT PERSON: FRED PARKER, CPESC -WARNING- THIS PLAN TO BE USED FOR EROSION CONTROL PURPOSES ONLY. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN THE FIELD BY THE INSPECTOR. -NOTE- THIS PLAN INDICATES EROSION CONTROL MEASURES REQUIRED AFTER SOIL STRIPPING AND PAD BUILDING HAS TAKEN PLACE. COORDINATE WITH DEVELOPER FOR MEASURES REQUIRED UNTIL PROPERTY TURNED OVER FOR DEVELOPMENT. COORDINATE WITH SOIL CONSERVATION DISTRICT REPRESENTATIVE FOR ANY OTHER MEASURES REQUIRED DUE TO SITE CONDITIONS. DISTURBED ACREAGE = 1.16± AC. C2.1SITE STABILIZATION - SWPPP2SWPPP PHASE 2 LEGEND - PERMANENT/TEMPORARY SEEDING USE PLANTING CHART. SHEET C8.0 FOR DETAIL. - SITE DISCHARGE POINT -EROSION CONTROL BLANKET - USE S150BN BIO-NET AS SUPPLIED BY NORTH AMERICAN GREEN OR APPROVED EQUAL. SHEET C8.0 FOR DETAIL. -INLET PROTECTION. SHEET C8.0 FOR DETAIL. -SILT FENCE -LIMITS OF DISTURBANCE *CONTRACTOR TO ADD ADDITIONAL MEASURES AS CONSTRUCTION PHASING AND SITE CONDITIONS DICTATE * LINE TYPES UNDERGROUND GAS UNDERGROUND WATER AERIAL ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND COMMUNICATIONS AERIAL COMMUNICATIONS OVERHEAD UTILITY FORCE MAIN RIGHT OF WAY LINE CHAIN LINK FENCE BOARD FENCE WROUGHT IRON FENCE GUARD RAIL HAND RAIL SILT FENCE BUILDING SETBACK LINE BOUNDARY LINE FLOW LINE G G G W W E(A)E(A) E E E C C C C(A)C(A) OHU OHU FM FM SF SF AERIAL FIBER OPTIC CABLEFO(A)FO(A) SECTION LINE FARM FENCE UNDERGROUND FIBER OPTICFOFO INDEX CONTOUR INTERMEDIATE CONTOUR SANITARY SEWER STORM SEWER EROSION CONTROL NOTES 1.ALL DISTURBED AREAS SHALL BE SODDED OR SEEDED, EXCEPT BUILDING PAD AND LANDSCAPE BEDS. SEE LANDSCAPE PLANS FOR LOCATION OF LANDSCAPE BEDS. 2.INSTALL SILT FENCE ALONG ALL DOWNSTREAM SLOPES. SILT FENCE TO FOLLOW CONTOUR. 3.THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIAL IN THE STREET. EROSION CONTROL SPECIFICATIONS 1.THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY OF EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE CONSULTED IN THE EVENT THIS HAPPENS. 2.TEMPORARY SEEDING IS TO BE APPLIED TO ANY DISTURBED AREA THAT WILL REMAIN UNALTERED IN EXCESS OF 15 DAYS. 3.PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS THAT HAVE ACHIEVED FINAL AND FINISHED GRADE. 4.PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION. 5.ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA THEY ARE INTENDED TO SERVICE. ALL EROSION CONTROL MEASURES PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE THEIR EFFECTIVENESS. 6.IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED. 7.DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED ACCORDING TO SEASONAL CONDITION AND/OR CONSTRUCTION ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL FULL STAND OF GRASS HAS BEEN OBTAINED. 8.THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND/OR OWNER. 9.IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO MINIMIZE SEDIMENTATION (FROM ON-SITE CONSTRUCTION ACTIVITIES) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES AND RECEIVING STREAMS/DITCHES IN STRICT COMPLIANCE WITH "RULE 5" (327 IAC 15-5, CONSTRUCTION ACTIVITY STORM WATER RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT, INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY CONSTRUCTION ACTIVITY. 10.FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION CHART IN THESE PLANS. 11.PORTABLE TOILETS MUST BE ANCHORED. *REVISIONS AND ISSUESPREPARED FOR:PROJECT NO. SHEET NO.CHECKED BY:DRAWN BY:DEGDESIGNED BY:DWG NAME:PROJECT NO.:W220058DATEBY01.31.2022BTDATE:DEGSTEVEN SCOTT RUCKER P.E. 11300279ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMA PART OF THE SOUTHWEST QUARTER, SECTION 31, TOWNSHIP 18 NORTH, RANGE 4 EAST, HAMILTON COUNTY, INDIANAW22.0058431 E CARMEL DRIVE, CARMEL, IN 46032Know what's below. before you dig.Call R CULVER'SCARMEL, INW S N E 04.29.2022DEGTAC COMMENT REVISIONS105.13.2022AMQLANDSCAPE COMMENT REVISIONS206.24.2022BTREMOVE PARKING ISLAND AND TRANSFORMER3TAC COMMENT REVISIONS 2407.07.2022DEGWQ TREATMENT TRAIN & WATER COMMENTS508.12.2022DEGADDED FIRE HYDRANT & FDC AND DRY LINE608.25.2022DEGRELOCATED IRRIGATION VALVE & METER709.29.2022DEGSWPPP2 UPDATE TO CLARIFY WQ UNIT & EASEMENT810.06.2022DEGCRE REVIEW COMMENT REVISIONS910.24.2022DEGADDED SURVEY DATA FOR EAST ADJOINER1011.23.2022DEGIP IP D SF IP DDDDDDDDDDDDDDDDDDDDD D D D D D D D D D D D D D D D DDDDDDDDDDDDDDDDDDDDSDSDSDSD15.0'IP SFSF SF SF SF SF SF SFSFSF SF SF SF SF SF SF SF SFSFSFSFSFSFSF15.0' AQUA-SHIELD AQUA-SWIRL XC-3 PROPOSED BMP EASEMENT PROPOSED BMPEASEMENTPROPOSED BMP EASEMENT EXISTING EASEMENTEXISTING EASEMENT