HomeMy WebLinkAboutC8.0 SWPPP DETAILSC8.0SWPPP DETAILSINSTALLATION
1.REMOVE ALL VEGETATION AND OTHER OBJECTIONABLE MATERIAL FROM THE FOUNDATION AREA.
2.GRADE THE FOUNDATION AND CROWN FOR POSITIVE DRAINAGE.
3.INSTALL A CULVERT PIPE UNDER THE PAD IF NEEDED TO MAINTAIN PROPER PUBLIC ROAD DRAINAGE.
4.IF WET CONDITIONS ARE ANTICIPATED, PLACE GEOTEXTILE FABRIC ON THE GRADED FOUNDATION TO
IMPROVE STABILITY.
5.PLACE AGGREGATE (INDOT CA NO. 2) TO THE DIMENSIONS AND GRADE SHOWN IN THE CONSTRUCTION
PLANS, LEAVING THE SURFACE SMOOTH AND SLOPED FOR DRAINAGE.
6.TOP-DRESS THE DRIVE WITH WASHED AGGREGATE (INDOT CA NO.53).
7.WHERE POSSIBLE, DIVERT ALL STORM WATER RUNOFF AND DRAINAGE FROM THE TEMPORARY
CONSTRUCTION INGRESS/EGRESS PAD TO A SEDIMENT TRAP OR BASIN.
MAINTENANCE
_ INSPECT DAILY.
_ RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
_ TOP-DRESS WITH CLEAN AGGREGATE AS NEEDED.
_ IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS.
_ FLUSHING SHOULD ONLY BE USED IF THE WATER FROM THE CONSTRUCTION DRIVE CAN BE CONVEYED
INTO A SEDIMENT TRAP OR BASIN.
REFERENCED IN CHAPTER 7 PAGE 22 AND 23 IN INDIANA STORM WATER QUALITY MANUAL.
WIDTH
(A)13' MINIMUM OR FULL WIDTH
OF ENTRANCE/EXIT DRIVE,
WHICHEVER IS GREATER.
C8.0SWPPP DETAILSTEMPORARY CONSTRUCTION INGRESS/EGRESS PAD
SMALL SITES - LESS THAN TWO ACRES (NO SCALE)
GEOTEXTILE FABRIC UNDERLINER
#2 STONE AGGREGATE
PUBLI
C
R
O
A
D
#53 ST
O
N
E
A
G
G
R
E
G
A
T
E
(
O
P
T
I
O
N
A
L
)
2"-3"(MIN.) (OPTIONAL)
50' (MI
N
.
)
6" (MIN.)REVISIONS AND ISSUESPREPARED FOR:PROJECT NO.
SHEET NO.CHECKED BY:DRAWN BY:DEGDESIGNED BY:DWG NAME:PROJECT NO.:W220058DATEBY01.31.2022BTDATE:DEGSTEVEN SCOTT RUCKER P.E. 11300279ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMA PART OF THE SOUTHWEST QUARTER, SECTION 31, TOWNSHIP 18 NORTH, RANGE 4 EAST, HAMILTON COUNTY, INDIANAW22.0058431 E CARMEL DRIVE, CARMEL, IN 46032CULVER'SCARMEL, IN04.29.2022DEGTAC COMMENT REVISIONS105.13.2022AMQLANDSCAPE COMMENT REVISIONS206.24.2022BTREMOVE PARKING ISLAND AND TRANSFORMER3TAC COMMENT REVISIONS 2407.07.2022DEGWQ TREATMENT TRAIN & WATER COMMENTS508.12.2022DEGADDED FIRE HYDRANT & FDC AND DRY LINE608.25.2022DEGRELOCATED IRRIGATION VALVE & METER709.29.2022DEGSWPPP2 UPDATE TO CLARIFY WQ UNIT & EASEMENT810.06.2022DEGCRE REVIEW COMMENT REVISIONS910.24.2022DEGADDED SURVEY DATA FOR EAST ADJOINER1011.23.2022DEGNOTES:
1.THE SWPPP INFORMATION SIGN MUST BE LOCATED NEAR THE CONSTRUCTION EXIT OF THE SITE,
SUCH THAT IT IS ACCESSIBLE AND VIEWABLE BY THE GENERAL PUBLIC, BUT NOT OBSTRUCTING
VIEWS AS TO CAUSE A SAFETY HAZARD.
2.ALL POSTED DOCUMENTS MUST BE MAINTAINED IN A CLEARLY READABLE CONDITION AT ALL TIMES
THROUGHOUT CONSTRUCTION AND UNTIL THE NOTICE-OF-TERMINATION (NOT) IS FILED FOR THE
PERMIT.
3.CONTRACTOR SHALL POST OTHER STORM WATER AND/OR EROSION AND SEDIMENT CONTROL
RELATED PERMITS ON THE SIGN AS REQUIRED BY THE GOVERNING AGENCY.
4.SIGN SHALL BE LOCATED OUTSIDE OF PUBLIC RIGHT-OF-WAY AND EASEMENTS UNLESS APPROVED
BY THE GOVERNING AGENCY.
5.CONTRACTOR IS RESPONSIBLE FOR ENSURING STABILITY OF THE SWPPP INFORMATION SIGN.
SWPPP INFORMATION SIGN
COPY
OF
NOI
COPY OF
IDEM
NOTICE OF
SUFFICIENCY
SWPPP INFORMATION
DETAILED DESCRIPTION OF THE LOCATION OF THE
SWPPP DOCUMENTATION (BINDER AND SITE MAPS)
ON THE SITE.
SIGN TO BE CONSTRUCTED OF A
RIGID MATERIAL, SUCH AS
PLYWOOD OR OUTDOOR SIGN
BOARD. SIGN MUST BE
CONSTRUCTED IN A MANNER TO
PROTECT DOCUMENTS FROM
DAMAGE DUE TO WEATHER (WIND,
SUN, MOISTURE, ETC.).
"SWPPP INFORMATION" MUST BE
DISPLAYED PROMINENTLY ACROSS
THE TOP OF THE SIGN, AS SHOWN IN
THE DETAIL.3" MIN.3" MIN.COPY
OF
DRAINAGE
APPROVAL
LETTER
COPY
OF
CONSTRUCTION
SITE
NOTICE AS
APPLICABLE
COPY
OF
CONSTRUCTION
SITE
NOTICE AS
APPLICABLE
COPY
OF
CONSTRUCTION
SITE
NOTICE AS
APPLICABLE
(NO SCALE)
TEMPORARY SEEDTEMPORARY SEED
TABLE 1 - TEMPORARY SEEDING SPECIFICATIONS
SEED SPECIES RATE PER ACRE PLANTING DEPTH OPTIMUM DATES
WHEAT OR RYE 160 LBS.1 TO 1 12 INCHES SEPTEMBER 16 - OCTOBER 30
SPRING OATS 100 LBS.1 INCH MARCH 1 - APRIL 16
ANNUAL RYEGRASS 40 LBS.14 INCH MARCH 1 - MAY 1 &
AUGUST 1 - SEPTEMBER 1
GERMAN MILLET 40 LBS.1 TO 2 INCHES MAY 1 - JUNE 1
SUDANGRASS 35 LBS.1 TO 2 INCHES MAY 1 - JULY 30
BUCKWHEAT 60 LBS.1 TO 2 INCHES APRIL 16 - JUNE 1
CORN (BROADCAST)300 LBS.1 TO 2 INCHES MAY 11 - AUGUST 10
SORGHUM 35 LBS.1 TO 2 INCHES MAY 1 - JULY 16
NOTES
1.PERENNIAL SPECIES MAY BE USED AS A TEMPORARY COVER, ESPECIALLY IF THE AREA TO BE SEEDED WILL REMAIN
IDLE FOR MORE THAN ONE YEAR.
2.SEEDING DONE OUTSIDE THE OPTIMUM SEEDING DATES INCREASES THE CHANCES OF SEEDING FAILURE. DATES
MAY BE EXTENDED OR SHORTENED BASED ON THE LOCATION OF THE PROJECT SITE WITHIN THE STATE.
3.MULCH ALONE IS AN ACCEPTABLE TEMPORARY COVER AND MAY BE USED IN LIEU OF TEMPORARY SEEDING,
PROVIDED THAT IT IS APPROPRIATELY ANCHORED.
4.A HIGH POTENTIAL FOR FERTILIZER, SEED, AND MULCH TO WASH EXISTS ON STEEP BANKS, CUTS, AND IN CHANNELS
AND AREAS OF CONCENTRATED FLOW.
SEEDBED PREPARATION
1.TEST SOIL TO DETERMINE PH AND NUTRIENT LEVELS.
2.APPLY SOIL AMENDMENTS AS RECOMMENDED BY THE SOIL TEST. IF TESTING IS NOT DONE, APPLY 400 TO 600
POUNDS PER ACRE OF 13-13-13 ANALYSIS FERTILIZER, OR EQUIVALENT.
3.WORK THE SOIL AMENDMENTS INTO THE UPPER TWO TO FOUR INCHES OF THE SOIL WITH A DISK OR RAKE
OPERATED ACROSS THE SLOPE.
SEEDING
1.SELECT A SEED SPECIES OR AN APPROPRIATE SEED MIXTURE AND APPLICATION RATE FROM TABLE 1.
2.APPLY SEED UNIFORMLY WITH A DRILL OR CULTIPACKER SEEDER OR BY BROADCASTING. PLANT OR COVER SEED
TO THE DEPTH SHOWN IN TABLE 1.
3.IF DRILLING OR BROADCASTING THE SEED, ENSURE GOOD SEED-TO-SOIL CONTACT BY FIRMING THE SEEDBED WITH
A ROLLER OR CULTIPACKER AFTER COMPLETING SEEDING OPERATIONS.
4.DAILY SEEDING WHEN THE SOIL IS MOIST IS USUALLY MOST EFFECTIVE.
5.IF SEEDING IS DONE WITH A HYDROSEEDER, FERTILIZER AND MULCH CAN BE APPLIED WITH THE SEED IN A SLURRY
MIXTURE.
6.APPLY MULCH AND ANCHOR IT IN PLACE.
MAINTENANCE
1.INSPECT WITHIN 24 HOURS OF EACH RAIN EVENT AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS.
2.CHECK FOR EROSION OR MOVEMENT OF MULCH AND REPAIR IMMEDIATELY.
3.MONITOR FOR EROSION DAMAGE AND ADEQUATE COVER (80 PERCENT DENSITY); RESEED, FERTILIZE, AND APPLY
MULCH WHERE NECESSARY.
4.IF NITROGEN DEFICIENCY IS APPARENT, TOP-DRESS FALL SEEDED WHEAT OR RYE SEEDING WITH 50 POUNDS PER
ACRE OF NITROGEN IN FEBRUARY OR MARCH.
REFERENCE IN CHAPTER 7 PAGES 31-33 IN THE INDIANA STORM WATER QUALITY MANUAL
1.PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECP's), INCLUDING ANY NECESSARY
APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA.
CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN.
2.BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE RECP'S IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH
APPROXIMATELY 12" (30 CM) OF RECP'S EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE RECP'S
WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND
COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) PORTION OF
RECP'S BACK OVER SEED AND COMPACTED SOIL. SECURE RECP'S COVER COMPACTED SOIL WITH A ROW OF
STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM) APART ACROSS THE WIDTH OF THE RECP'S.
3.ROLL THE RECP'S (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. RECP'S WILL UNROLL WITH APPROPRIATE SIDE
AGAINST THE SOIL SURFACE. ALL RECP's MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES
IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM , STAPLES/STAKES
SHOULD BE PLACED THOUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN.
4.THE EDGES OF PARALLEL RECP's MUST BE STAPLED WITH APPROXIMATELY 2" - 5" (5 CM - 12.5 CM) OVERLAP DEPENDING ON
RECP's TYPE.
5.CONSECUTIVE RECP'S SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN
APPROXIMATE 3" (7.5 CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30 CM) APART ACROSS
ENTIRE RECP's WIDTH. NOTE: IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE R STAKE LENGTHS GREATER THAN 6" (15
CM) MAY BE NECESSAY TO PROPERLY SECURE THE RECP's.
2"-5" (5 CM-12.5CM)
12" (30 CM)6" (15 CM)6" (15 CM)
SLOPE INSTALLATION
(NO SCALE)
EROSION CONTROL Products
Guaranteed SOLUTIONS
14649 HIGHWAY 41 NORTH
EVANSVILLE, IN 47725
800-720-2040
www.nagreen.com
SEDIMENTATION/SILT FENCE
MAXIMUM LOAD SLOPE AND DISTANCE FOR
WHICH A SILT FENCE IS APPLICABLE
INSTALLATION
PREFABRICATED SILT FENCE
1. LAY OUT THE LOCATION OF THE FENCE SO THAT IT IS PARALLEL TO THE CONTOUR OF THE SLOPE AND AT LEAST 10 FEET BEYOND THE TOE OF THE
SLOPE TO PROVIDE A SEDIMENT STORAGE AREA. TURN THE ENDS OF THE FENCE UP SLOPE SUCH THAT THE POINT OF CONTACT BETWEEN THE GROUND
AND THE BOTTOM OF THE FENCE END TERMINATES AT A HIGHER ELEVATION THAN THE TOP OF THE FENCE AT ITS LOWEST POINT.
2. EXCAVATE AN EIGHT-INCH DEEP BY FOUR-INCH WIDE TRENCH ALONG THE ENTIRE LENGTH OF THE FENCE LINE. INSTALLATION BY PLOWING IS ALSO
ACCEPTABLE.
3. INSTALL THE SILT FENCE WITH THE FILTER FABRIC LOCATED ON THE UP-SLOPE SIDE OF THE EXCAVATED TRENCH AND THE SUPPORT POSTS ON THE
DOWN-SLOPE SIDE OF THE TRENCH.
4. DRIVE THE SUPPORT POSTS AT LEAST 18 INCHES INTO THE GROUND, TIGHTLY STRETCHING THE FABRIC BETWEEN THE POSTS AS EACH IS DRIVEN INTO
THE SOIL. MINIMUM OF 12 INCHES OF THE FILTER FABRIC SHOULD EXTEND INTO THE TRENCH.
5. LAY THE LOWER FOUR INCHES OF FILTER FABRIC ON THE BOTTOM OF THE TRENCH AND EXTEND IT TOWARD THE UP-SLOPE SIDE OF THE TRENCH.
6. BACKFILL THE TRENCH WITH SOIL MATERIAL AND COMPACT IT IN PLACE.
NOTE: IF THE SILT FENCE IS BEING CONSTRUCTED ON-SITE, ATTACH THE FILTER FABRIC TO THE SUPPORT POSTS AND ATTACH WOODEN LATHE TO
SECURE THE FABRIC TO THE POSTS. ALLOW FOR AT LEAST 12 INCHES OF FABRIC BELOW GROUND LEVEL. COMPLETE THE SILT FENCE INSTALLATION,
FOLLOWING STEPS 1 THROUGH 6 ABOVE.
MAINTENANCE
_ INSPECT WITHIN 24 HOURS OF A RAIN EVENT AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS.
_ IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. NOTE: ALL
REPAIRS SHOULD MEET SPECIFICATIONS AS OUTLINED WITHIN THIS MEASURE.
_ REMOVE DEPOSITED SEDIMENT WHEN IT IS CAUSING THE FILTER FABRIC TO BULGE OR WHEN IT REACHES ONE-HALF THE HEIGHT OF THE FENCE AT ITS
LOWEST POINT. WHEN CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, GRADE THE SITE TO
BLEND WITH THE SURROUNDING AREA, AND STABILIZE.
REFERENCE IN CHAPTER 7 PAGES 215-221 IN THE INDIANA STORM WATER QUALITY MANUAL
2-WOOD POST/STAKES WRAPPED
WITH SILT FENCE AND ROTATED AT
LEAST ONE FULL TURN TO SECURE
SILT FENCE END IN PLACE
SILT FENCE
SILT FENCE
POST
TO JOIN TO
ENDS OF TWO
FENCES.
EMBEDDED SILT FENCE
MATERIAL MIN. 8" INTO GROUND
W/ 4" LAID ALONG BOTTOM OF
TRENCH. SOIL SLICING IN
ACCORDANCE WITH ASTM D
6462 8.2.2 IS ALSO ACCEPTABLE.
GEOTEXTILE FABRIC LAID
ON DOWN SLOPE SIDE
AND BOTTOM OF TRENCH
8"X4" TRENCH TO BE BACKFILLED
AND COMPACTED
WOVEN FILTER FABRIC SILT
FENCE MATERIAL COVER
POST 2"X2" WOOD OR 1.33
LBS/FOOT STEEL 6' MAX.
SPACING
EMBEDDED SILT FENCE MATERIAL
MIN. 8" INTO GROUND W/ 4" LAID
ALONG BOTTOM OF TRENCH. SOIL
SLICING IN ACCORDANCE WITH ASTM
D 6462 8.2.2 IS ALSO ACCEPTABLE.
GEOTEXTILE FABRIC LAID
ON DOWN SLOPE SIDE AND
BOTTOM OF TRENCH
POST 2"X2" WOOD OR 1.33 LBS/FOOT
STEEL 8' MAX. SPACING
WIRE FENCE 14 GUAGE (MIN)-6" MESH
REQ'D. IN SWALES OR AREAS OF
CONCENTRATED FLOW
NONWOVEN FILTER FABRIC -
SECURE TO POSTS WITH 2" LATH
2-WOOD POST/STAKES WRAPPED
WITH SILT FENCE AND ROTATED
AT LEAST TWO FULL TURNS TO
PROVIDE A SECURE CONNECTION
WOOD OR METAL
STAKES TO SECURE
THE STRAW BALES
(TWO PER BALE)
10 MIL. PLASTIC LINING
STRAW BALE (TYP)
SECTION LINE
STRAW BALE (TYP)
BINDING WIRE
WOOD OR METAL
STAKES (TYP) - 2 PER
BALENATIVE MATERIAL (OPTIONAL)
POLYETHYLENE LINING 10
MIL. EXTENDING OVER
BALES
(NO SCALE)TYPE "ABOVE GRADE
W/ STRAW BALES"4"WOOD OR METAL
STAKES TO SECURE
THE STRAW BALES
(TWO PER BALE)
POLYETHYLENE LINING 10
MIL. EXTENDING OVER
BALES
METAL PINS OR STAPLES
TO SECURE THE
POLYETHYLENE LINING TO
THE STRAW BALES
METAL PINS OR STAPLES
TO SECURE THE
POLYETHYLENE LINING
TO THE STRAW BALES
CONCRETE
WASHOUT
WOOD POST 3"x3"x8'
BLACK LETTER 6" HEIGHT
3/8" TREATED
PLYWOOD 48"x24"
PAINTED WHITE
0.5" LAG SCREWS
INSTALLATION
1.UTILIZE AND FOLLOW THE DESIGN IN THE STORM WATER POLLUTION PREVENTION PLAN TO INSTALL THE SYSTEM.
2.DEPENDENT UPON THE TYPE OF SYSTEM, EITHER EXCAVATE THE PIT OR INSTALL THE CONTAINMENT SYSTEM.
3.A BASE SHALL BE CONSTRUCTED AND PREPARED THAT IS FREE OF ROCKS AND OTHER DEBRIS THAT MAY CAUSE TEARS OR PUNCTURES IN THE
POLYETHYLENE LINING.
4.INSTALL THE POLYETHYLENE LINING. FOR EXCAVATED SYSTEMS, THE LINING SHOULD EXTEND OVER THE ENTIRE EXCAVATION. THE LINING FOR BERMED
SYSTEMS SHOULD BE INSTALLED OVER THE POOLING AREA WITH ENOUGH MATERIAL TO EXTEND THE LINING OVER THE BERM OR CONTAINMENT SYSTEM. THE
LINING SHOULD BE SECURED WITH PINS, STAPLES, OR OTHER FASTENERS.
5.PLACE FLAGS, SAFETY FENCING, OR EQUIVALENT TO PROVIDE A BARRIER TO CONSTRUCTION EQUIPMENT AND OTHER TRAFFIC.
6.PLACE A NON-COLLAPSING, NON-WATER HOLDING COVER OVER THE WASHOUT FACILITY PRIOR TO A PREDICTED RAINFALL EVENT TO PREVENT
ACCUMULATION OF WATER AND POSSIBLE OVERFLOW OF THE SYSTEM (OPTIONAL).
7.INSTALL SIGNAGE THAT IDENTIFIES CONCRETE WASHOUT AREAS.
8.POST SIGNS DIRECTING CONTRACTORS AND SUPPLIERS TO DESIGNATED LOCATIONS.
9.WHERE NECESSARY, PROVIDE STABLE INGRESS AND EGRESS (SEE TEMPORARY CONSTRUCTION INGRESS/EGRESS PAD ON PAGE 17) OR ALTERNATIVE
APPROACH PAD FOR CONCRETE WASHOUT SYSTEMS.
10.USE A 10 MIL. POLYETHYLENE LINED DUMPSTER AS AN ALTERNATE.
HIGH
VISABILTIY
PLASTIC
MESH FENCE
3'3'PLAN
1.ACTUAL LAYOUT DETERMINED IN
FIELD.
2.THE CONCRETE WASHOUT SIGN
SHALL BE INSTALLED WITHIN
30FT. OF THE TEMP. CONCRETE
WASHOUT FACILITY.
SECTION
CONCRETE WASHOUT8"8"8"X4" TRENCH TO BE
BACKFILLED AND COMPACTED
POSTS: STEEL T OR U TYPE, OR 2"X2" HARD WOOD POST
FENCE: WOVEN WIRE, 14-1/2 GA., 6" MAX. MESH OPENING
FABRIC: IN ACCORDANCE WITH ASTM D 6461 LATEST EDITION.
LOAD SLOPE
LESS THAN 2%
2 TO 5%
5 TO 10%
10 TO 20%
MORE THAN 20%
MAX. DISTANCE ABOVE FENCE
100 FT.
75 FT.
50 FT.
25 FT.
15 FT.
(NO SCALE)
TREE PRESERVATION DETAIL
BARRIERS THAT EXTEND BEYOND THE DRIPLINE PROTECT TREES DURING CONSTRUCTION.
EX. GRADE
FENCE POST
HIGH VISABILTIY
PLASTIC MESH
FENCE
WATER DRIP-LINE
EX. TREE
(DRIP-LINE)
PROP. FENCE POST
WITHOUT WIRE SUPPORT WITH WIRE SUPPORT
(NO SCALE)
FLOW
FINISH GRADE
UNDISTURBED
GROUND
FLOW
FINISH GRADE
UNDISTURBED
GROUND
NOTE: AVOIDING DAMAGE DURING CONSTRUCTION
THE SUREST WAY TO PROTECT TREES THAT ARE TO BE SAVED IS TO:
1.WORK WITH THE BUILDER TO LOCATE AND MARK WITH FLAGGING AND/OR SIGNS ALL
CONSTRUCTION ROADS, PARKING PLACES FOR WORKERS, AND AREAS FOR STORAGE
OF BUILDING MATERIALS, GRAVEL AND SOIL.
2.WORK WITH THE UTILITY CONTRACTORS TO STAKE OUT THE EXACT LOCATION OF
TRENCHES.
3.ERECT PHYSICAL BARRIERS AROUND ALL "SAVED" TREES OR, BETTER YET, AROUND
GROUPS OF TREES, NEAR THE CONSTRUCTION ACTIVITY.
4.EXTEND BARRIERS AS FAR AS POSSIBLE BEYOND DRIPLINE.
APRON ON THIS
SIDE OF THE DIKE
SHALL BE FOLDED
UNDER THE DIKE
SECTION 20" AND
GLUED DOWN
CONSTRUCTION
AREA
SECTION A-A
DIKE PLAN VIEW
APRON
ADHESIVE
FLOW
ADHESIVE
20"20"ADHESIVEADHESIVEADHESIVE
ADHESIVE
NOTES
1. INSTALLED SILT DIKE UNIT SHALL HAVE CONTINUOUS
AND FIRM CONTACT WITH PAVEMENT.
2. ADHESIVES SHALL BE LIQUID NAIL OR APPROVED
EQUAL FOR CONCRETE PAVEMENT APPLICATIONS AND
EMULSIFIED ASPHALT FOR ASPHALT APPLICATIONS.
ADHESIVE SHALL BE PLACED WHERE THE UNITS
OVERLAP AND A 20" STRIP ALONG BOTH EDGES.
FLOW
OVERLAP PER
MANUFACTURER'S
RECOMMENDATIONS
SILT DIKE
(ON EXISTING PAVEMENT)
(NO SCALE)
ALTERNATE
CONTRACTOR MAY USE A 10 MIL. POLYETHYLENE LINED DUMPSTER FOR CONCRETE WASHOUT.
EXISTING CONCRETE OR
ASPHALT PAVEMENT
MAINTENANCE
1.INSPECT DAILY AND AFTER EACH STORM EVENT FOR LEAKS, SPILLS, TRACKING OF SOIL BY EQUIPMENT, AND THE
POLYETHYLENE LINING FOR FAILURE.
2.ONCE CONCRETE WASTES HARDEN, REMOVE AND DISPOSE OF THE MATERIAL. EXCESS CONCRETE SHOULD BE REMOVED
WHEN THE WASHOUT SYSTEM REACHES 50 PERCENT OF THE DESIGN CAPACITY AND SHOULD NOT BE USED UNTIL
PROPERLY CLEANED OUT.
3.PLASTIC LINER SHOULD BE REPLACED AFTER EVERY CLEANING, THE REMOVAL OF MATERIAL USUALLY DAMAGES IT.
4.REPAIR OR ENLARGE AS NECESSARY TO MAINTAIN CAPACITY FOR CONCRETE WASTE.
5.IF LIQUIDS DO NOT EVAPORATE IT MAY BE NECESSARY TO VACUUM OR REMOVE THE LIQUIDS AND DISPOSE OF THEM IN
AN ACCEPTABLE METHOD.
6.WHEN CONCRETE WASHOUT SYSTEMS ARE NO LONGER REQUIRED THEY SHALL BE CLOSED AND HOLES, DEPRESSIONS
AND OTHER DISTURBANCES ASSOCIATED WITH THE SYSTEM SHOULD BE BACKFILLED, GRADED, AND STABILIZED.