Loading...
HomeMy WebLinkAboutYardberry Landscape/ENG/$0/CO #1/20-ENG-07 DocuSign Envelope ID: E3DF1AE4-D2F6-4C0E-B51B-5B387E45F6DF City of Carmel Project 20-ENG-07 [APPROVED..., a ks a oyl Yardberry Landscape Excavating Co. — Pedestrian Path Construction on East 106th Street CHANGE ORDER #1 - HAZEL DELL PATHWAY Yardberry with 3 men clearing debris on Hazel Dell Pathway. The equipment that the crew used was a bobcat, dump truck, and included a truck service fee. Contract Price prior to this Change Order $646,099.00 Contract Price will be increased/decreased by this Change Order $0.00 New Contract Price including this Change Order $646,099.00 Amount Adjusted Contract Cumulative Price Change from Original Contract Original Contract $646,099.00 $646,099.00 N/A Change Order#I $0.00 $646,099.00 0.00% DocuSign Envelope ID: E3DF1AE4-D2F6-4C0E-B51B-5B387E45F6DF CrossRoad Engineers, P.C. ill14114 Change Order Details 20-ENG-07 106th Street Path Penn to College CRD55RDFID ENGINEERS, PC Description Construction of both multi-use asphalt path and concrete sidewalk and including storm sewer,curbing,sidewalk,mid-block crossing and pavement markings. Prime Contractor Yardberry Landscape and Excavating Co. 9940 South 1000 West Anderson,IN 46017 Change Order 1 Status Approved Date Created 01/09/2023 Type Changed Conditions Summary Hazel Dell Pathway Change Order Description Yardberry with 3 men clearing debris on Hazel Dell Pathway.The equipment that the crew used was a bobcat, dump truck,and included a truck service fee. Awarded Project Amount $646,099.00 Authorized Project Amount S646,099.00 Change Order Amount $0.00 Revised Project Amount $646,099.00 Change Order Details: 02/07/2023 20-ENG-07 106th Street Path Penn to College Page 1 of 4 DocuSign Envelope ID: E3DF1AE4-D2F6-4C0E-B51B-5B387E45F6DF Cost/Time Cost Breakdown: 24 hours labor(3 men x 8 hours x 60$/hour)=$l,440 Bobcat=$1,300 Dump Truck=$960 Service Truck=$800 Total_$4,500 Increases/Decreases i Line, g urn 1 n ID Unit [nit Price. m r trm Change Revised Quantity ntount Quantity • °-•:.%.rnrtint Quantity Amount Section: 1-Description 0005 5 DOL $1.000 12,600.000 $12,600.00 -4,500.000 -$4,500.00 8,100.000 $8.100.00 Storm Water Quality Management Budget Reason: Using the underrun of Storm Water Quality Budget to balance the amount needed to cover the change order for the Hazel Dell Pathway Debris Clearing. l item Totals S12,600.00 -$4,500.00 $8,100.00 Change Order Details: 02/07/2023 20-ENG-07 106th Street Path Penn to College Page 2 of 4 DocuSign Envelope ID: E3DF1AE4-D2F6-4C0E-B51B-5B387E45F6DF New i.te Line Number „g, 11cm ID •. ...,... „Eaten ion wection: 1-Description 0050 105-06807 LS 1.000 $4,500.000 $4.500.00 ADDITIONAL 1 item Total: $4,500.00 Attachments • flocil�nenl _ �� &a •yes• il3lirin ,°°°'" 'Submission Date Hazel_Dell_Extra_Work.pdf Hazel Dell Extra Work.pdf 01/09/2023 10:09 AM EST Hazel_Dell_Quote.pdf Hazel.Dell Quote.pdf 01/09/2023 10:09 AM EST 2 attachments Change Order Details: 02/07/2023 Page 3 of 4 20-ENG-07 106th Street Path Penn to College DocuSign Envelope ID: E3DF1AE4-D2F6-4C0E-B51B-5B387E45F6DF CROSSROAD Aged ENGINEERS Contractor: Client YARDBERRY LANDSCAPING DocuSgnetl by: PM: Evan Smith AND EXCAVATING CO P4,.I1 '--9/2S6F82180.131.. ]15 N 17th Ave James Brainard .savor Address Address Beech Grove. IN 9940 South 1000 West Jeremy Kashman,City Engineer Anderson,IN 46017 By: 46107 a CsE»�oaEc.15100.- City/State/Zip City/State/Zip Mar} Arai Burke,Member EvanSmith cWtsonMember; Date: Phone: 317-780-1555 ATTEST: Ducusgnea by: F54,, W9FG 041 0 ti ll e„sn„serA...ec_. Date:2/8/2023 Date: b Sue'Wolfgang,City Clerk Date:3/1/2023 Change Order Details: 02/07/2023 20-ENG-07 106th Street Path Penn to College Page 4 o-4