HomeMy WebLinkAboutLithko Restoration Technologies/STREET/-$76,192/CO #2/Sophia Square Waterproofing DocuSign Envelope ID: E3DF1AE4-D2F6-4C0E-B51B-5B387E45F6DF City of Carmel Project Sophia Square Waterproofing Change Order#2— APPROVED By Sergey Grechukhin at 4:19 pm,Feb 14,2023 Deduct-Concrete Repairs Addition-End Dam Detail Deduct-CMU on Pool Wall Addition-Pool Wall Curb Addition-Pavers to Pool Wall Change Order#2 is an additional price for work completed regarding Sophia Square Waterproofing. Contract Price prior to this Change Order $ 1,321,897.99 Contract Price will be increased/decreased by this Change Order $ - (76,192.00) New Contract Price including this Change Order $ 1,245,705.99 Adjusted Contract Cumulative Amount Price Change from Original Contract Original Contract $ 1,122,577.99 I N/A N/A CO1-Additional Removal and Trucking Planter Wall Stones; Additional Removal and Disposal of Pavers; Additional Move and Install Stone Walls; $ 199,320.00 $1,321,897.99 17.76% Additional Floor Coat; Additional Remove Block; Deduct for Cladding Removal; Deduct for Irrigation Install CO2-Deduct concrete repairs,additional end dam detail,deduct repair of CMU on pool wall,additional pool $ -(76,192.00) $ 1,245,705.99 10.97 wall curb concrete, additional pavers to pool wall DocuSign Envelope ID: E3DF1AE4-D2F6-4C0E-B51B-5B387E45F6DF CITY OF CARMEL TO: CONTRACT CHANGE ORDER NO.: 2 DATE: 02/08/23 PROJECT NAME: Sophia Square Waterproofing CITY REQ. NO.: N/A CITY PO NO.: 106662. 106668, 106669 CITY PO DATE: 7/6/22, 7/7/22 I. You are directed to make the following changes in this Contract: Change Order#2 listed below. SCHEDULED ADJUSTMENT ITEM AMOUNT (+) OR (-)DAYS Deduct Concrete Repairs ($104,317.00) 0 Additional End Dam Detail $6,725.00 3 Deduct for RFI#3; CMU Pool Wall Repair ($19,800.00) 0 Additional Pool Wall Curb $20,465.00 3 Additional Pavers to Pool Wall $20,735.00 4 The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: N/A W.D.C.No.: N/A Other: See attached proposals The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $_1,321,897.99 Contract Price will be increased/decreased by this Change Order $ (76,192.00) New Contract Price including this Change Order $_1,245,705.99 Contract Time Prior to this Change Order 182 Days 02/28/23 Completion Date Net increased/decreased resulting from this Change Order_10 Days Current Contract Time including this Change Order 192 Days 03/10/23 Completion Date Version 2016-08-31 DocuSign Envelope ID: E3DF1AE4-D2F6-4C0E-B51B-5B387E45F6DF This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. DocuSigned by: [ /. City of Carmel LITHKO Restoration 1'� J 97250[0210D04O1... STREET CONTRACTOR James Brainard, Mayor 1 Civic Square 990 N. Main St. /--°oco5"ilkanie a,� Address Address GIa9 Ann Burke,Member Carmel, IN 46023 Cincinnati, OH 45050 iAhulunow City/State/Zip City/State/Zip to rWatson, Member Matt Higginbotham, Commissioner, Street Department By: 44� ATTEST: y Y' w iz MAC Sae.,z-ENs, �✓ DocuSigned by: Matt Higginb iam Phone: 317-733-2001 Phone: 5'a- '4 9 SS ra` W'�o°""J GO3A3OD7A3Ok"CC... Sue Wolfgang, Clerk Date: 12/01/22 Date:4,0. Date:3/1/2023 Version 2016-08-31