HomeMy WebLinkAboutP101 - PLUMBING PLANK-3427HIGHLINETOILETSVITREOUS CHINA
K-3427HIGHLINETOILETSVITREOUS CHINA
K-3427HIGHLINETOILETSVITREOUS CHINA
K-3427HIGHLINETOILETSVITREOUS CHINA
K-3427HIGHLINETOILETSVITREOUS CHINA
K-3427HIGHLINETOILETSVITREOUS CHINA
RAMP UP
RAMP UP
RAMP UP
EX. VTR
EX. 1-1/2" V
(V.I.F.)
EX. 1-1/2" CW
(V.I.F.)
HYD-1
HB-1
HYD-1
FD-1
F.F.E. = 0' -0"
4" WASTE
I.E. = -4' -6"
SEE CIVIL ENG
DRAWINGS FOR
CONTINUATION
EX
EX
SK-1
EX. 4" W
(V.I.F.)
1
2
EX. 1" HW
(V.I.F.)
FCO
ECO5' - 0"EX
EX
EX
EX
EX EX
EX
EX
EX EX
EX
EX
EX
EX
EX
EX
EX
GIS TECH
OFFICE
118
GIS DIRECTOR
OFFICE
117
SYSTEM ADMIN
OFFICE
116
DIRECTOR
OFFICE
115
ADMIN OFFICE
114
CONFERENCE
112
RECEPTION
113
NEW BREAK
ROOM
111
CORRIDOR
107
OFFICE
108
OFFICE
109
OFFICE
110
IT DATA ROOM
106
WORK SPACE
105
STAGING/STORAGE
104
NEW GARAGE
100
1 1/4" G
EX. 2-1/2"G (V.I.F.)
1" CW 1" CW 3/4" CW2" W1/2" HW
1" CW
2" VPIPE SLEEVE
(TYP)
1 1/2" CW
2 1/2" G 3
4
54" W4" W3" V(BURIED)ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS2 WEST MAIN STREET O: 317.810.1502CARMEL, IN 460322101
10-26-2022
BID DOCUMENTS
P101PLUMBING PLANCLAY TOWNSHIPCENTER10701 North CollegeAvenueCarmel, INN
1/8" = 1'-0"
PLUMBING PLAN1
GENERAL NOTES
A SAW CUT FLOOR AND EXCAVATE TO INSTALL NEW PIPING BELOW FLOOR.
BACKFILL AND PATCH FLOOR.
B REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR PATCHING
INSTRUCTIONS.
C AVOID ALL CONFLICTS BETWEEN PLUMBING SYSTEMS AND CONDUIT, DUCT,
EQUIPMENT, STRUCTURAL MEMEBERS, AND ANY OTHER OBSTRUCTIONS
ENCOUNTERED. PIPING LAYOUTS ARE DIAGRAMMATIC AND SHOW SYSTEM
INTENT. PIPING MAY REQUIRE ADDITIONAL OFFSETS, DROPS, RISERS, ETC.
SHEET KEYNOTES
1 EXTEND AND TIE INTO EXISTING VENT PIPING OF ADEQUATE SIZE AND
ELEVATION. (V.I.F.)
2 ROUTE COLD WATER, HOT WATER, AND VENT DOWN IN WALL TURN OUT INTO
CASEWORK. ROUTE WITHIN CASEWORK ALONG THE BACK WALL TO THE SINK.
3 REROUTE GAS PIPING IN ORDER TO AVOID RUNNING ABOVE DATA ROOM
4 REROUTE COLD WATER PIPING IN ORDER TO AVOID RUNNING ABOVE DATA
ROOM
5 FURNISH AND INSTALL OIL SEPARATOR (STRIEM OS-75, OR
ENGINEER-APPROVED EQUAL)
NOTE:
ALL SANITARY WASTE PIPING SHOWN IS BURIED, UNLESS OTHERWISE NOTED.
ALL WATER, VENT AND GAS PIPING SHOWN IS SUSPENDED, UNLESS
OTHERWISE NOTED.
# DESCRIPTION DATE
03/10/23