Loading...
HomeMy WebLinkAboutP102 - ROOF PLUMBING PLANRTU-1 MECH. EQUIP. (SEE M-SERIES) SEAL ROOF PENETRATION WEATHER TIGHT EF-1 1 1/4" G EX. VTR SCUPPER AND DOWNSPOUT BY G.C. (TYP) NOTE: ALL GAS PIPING SHOWN IS ABOVE ROOF, UNLESS OTHERWISE NOTED, 3" VTR ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS2 WEST MAIN STREET O: 317.810.1502CARMEL, IN 460322101 10-26-2022 BID DOCUMENTS P102ROOF PLUMBINGPLANCLAY TOWNSHIPCENTER10701 North CollegeAvenueCarmel, INN 1/8" = 1'-0" ROOF PLUMBING PLAN1 GENERAL NOTES A PROVIDE SHUT-OFF VALVE, DIRT LEG AND UNION AT GAS CONNECTION TO GAS FIRED EQUIPMENT. B COORDINATE LOCATION OF GAS CONNECTION WITH EQUIPMENT MANUFACTURER'S DATA. C PRIME AND PAINT GAS PIPING OUTSIDE THE BUILDING TO PREVENT RUSTING. APPLY TWO COATS OF RUST-INHIBITING PRIMER AND TWO COATS OF 'YELLOW' ENAMEL PAINT FORMULATED FOR EXTERIOR USE. D SUPPORT NEW GAS PIPING ON ROOF WITH PRE-MANUFACTURED PIPE SUPPORT SYSTEM (MIRO, OR EQUAL). # DESCRIPTION DATE 03/10/23