Loading...
HomeMy WebLinkAboutPD101 - DEMOLITION PLUMBING PLANK-3427HIGHLINETOILETSVITREOUS CHINA K-3427HIGHLINETOILETSVITREOUS CHINA K-3427HIGHLINETOILETSVITREOUS CHINA K-3427HIGHLINETOILETSVITREOUS CHINA K-3427HIGHLINETOILETSVITREOUS CHINA K-3427HIGHLINETOILETSVITREOUS CHINA K-3427HIGHLINETOILETSVITREOUSCHINA 3 3 4 1 1 2 1 1 1 1/2" V 1 1/2" CW2 1/2" G1" HW 1 1/2"5 6 ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS2 WEST MAIN STREET O: 317.810.1502CARMEL, IN 460322101 10-26-2022 BID DOCUMENTS PD101DEMOLITIONPLUMBING PLANCLAY TOWNSHIPCENTER10701 North CollegeAvenueCarmel, INN 1/8" = 1'-0" DEMOLITION PLUMBING PLAN1 GENERAL NOTES A REMOVE ALL PIPING, EQUIPMENT, FIXTURES, HANGERS, VALVES, ETC. SHOWN HEAVEY DASHED. B CAP PIPING AT NEAREST REUSABLE SERVICE LINE. DEAD LEGS LONGER THAN 2 FEET ARE NOT PERMITTED. C SAW CUT FLOOR TO REMOVE PIPING BELOW FLOOR. BACKFILL AND PATCH FLOOR. REFER TO ARCHITETURAL AND STRUCTURAL DRAWINGS FOR PATCHING INSTRUCTIONS. D PATCH WALLS, CEILING, FLOORS , ETC. WHERE PIPING IS REMOVED AND HOLES IN WALLS, CEILINGS, FLOORS, ETC. ARE NOT BEING REUSED. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR PATCHING INSTRUCTIONS. SHEET KEYNOTES 1 REMOVE PLUMBING FIXTURE, TRIM, AND ASSOCIATED PIPING. 2 REMOVE WATER HEATER AND ASSOCIATED PIPING. 3 REMOVE FLOOR DRAIN, P-TRAP, AND ASSOCIATED PIPING. CAP AT NEAREST REUSABLE SANITARY LINE. (V.I.F.) 4 REMOVE WATER, WASTE AND VENT PIPING WITHIN CHASE. CAP ALL WASTE BELOW FLOOR. VENT THROUGH ROOF TO REMAIN. 5 REMOVE THIS SECTION OF GAS PIPING. REFER TO SHEET P101 FOR NEW ROUTING TO AVOID NEW IT ROOM. 6 REMOVE THIS SECTION OF DOMESTIC WATER PIPING. REFER TO SHEET P101 FOR NEW ROUTING TO AVOID NEW IT ROOM. # DESCRIPTION DATE 03/10/23