HomeMy WebLinkAboutPD101 - DEMOLITION PLUMBING PLANK-3427HIGHLINETOILETSVITREOUS CHINA
K-3427HIGHLINETOILETSVITREOUS CHINA
K-3427HIGHLINETOILETSVITREOUS CHINA
K-3427HIGHLINETOILETSVITREOUS CHINA
K-3427HIGHLINETOILETSVITREOUS CHINA
K-3427HIGHLINETOILETSVITREOUS CHINA
K-3427HIGHLINETOILETSVITREOUSCHINA
3
3
4
1
1
2
1
1
1 1/2" V 1 1/2" CW2 1/2" G1" HW 1 1/2"5 6 ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS2 WEST MAIN STREET O: 317.810.1502CARMEL, IN 460322101
10-26-2022
BID DOCUMENTS
PD101DEMOLITIONPLUMBING PLANCLAY TOWNSHIPCENTER10701 North CollegeAvenueCarmel, INN
1/8" = 1'-0"
DEMOLITION PLUMBING PLAN1
GENERAL NOTES
A REMOVE ALL PIPING, EQUIPMENT, FIXTURES, HANGERS, VALVES, ETC. SHOWN
HEAVEY DASHED.
B CAP PIPING AT NEAREST REUSABLE SERVICE LINE. DEAD LEGS LONGER THAN
2 FEET ARE NOT PERMITTED.
C SAW CUT FLOOR TO REMOVE PIPING BELOW FLOOR. BACKFILL AND PATCH
FLOOR. REFER TO ARCHITETURAL AND STRUCTURAL DRAWINGS FOR
PATCHING INSTRUCTIONS.
D PATCH WALLS, CEILING, FLOORS , ETC. WHERE PIPING IS REMOVED AND
HOLES IN WALLS, CEILINGS, FLOORS, ETC. ARE NOT BEING REUSED. REFER
TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR PATCHING
INSTRUCTIONS.
SHEET KEYNOTES
1 REMOVE PLUMBING FIXTURE, TRIM, AND ASSOCIATED PIPING.
2 REMOVE WATER HEATER AND ASSOCIATED PIPING.
3 REMOVE FLOOR DRAIN, P-TRAP, AND ASSOCIATED PIPING. CAP AT
NEAREST REUSABLE SANITARY LINE. (V.I.F.)
4 REMOVE WATER, WASTE AND VENT PIPING WITHIN CHASE. CAP ALL WASTE
BELOW FLOOR. VENT THROUGH ROOF TO REMAIN.
5 REMOVE THIS SECTION OF GAS PIPING. REFER TO SHEET P101 FOR NEW
ROUTING TO AVOID NEW IT ROOM.
6 REMOVE THIS SECTION OF DOMESTIC WATER PIPING. REFER TO SHEET
P101 FOR NEW ROUTING TO AVOID NEW IT ROOM.
# DESCRIPTION DATE
03/10/23