Loading...
HomeMy WebLinkAboutS301 - TYPICAL FOUNDATION DETAILSTENSION LAP SPLICE LENGTHS FOR BARS ENCLOSED IN TIES OR STIRRUPS TENSION LAP SPLICE LENGTHS FOR BARS NOT ENCLOSED IN TIES OR STIRRUPS NOTES: 1. TABULATED VALUES ARE GIVEN IN INCHES. 2. DIVIDE TABULATED VALUES BY 1.30 TO ACHIEVE STRAIGHT BAR TENSION DEVELOPMENT LENGTHS. 3. APPLY A 1.30 MULTIPLIER ON TABULATED VALUES FOR USE IN LIGHTWEIGHT CONCRETE. 4. APPLY A 1.50 MULTIPLIER ON TABULATED VALUES FOR EPOXY COATED BARS WITH COVER LESS THAN 3-BAR DIAMETERS OR CLEAR SPACING LESS THAN 6 BAR DIAMETERS. APPLY A 1.20 MULTIPLIER ON ALL OTHER EPOXY COATED BARS. 5. MULTIPLIERS FOR LIGHTWEIGHT CONCRETE AND EPOXY COATING ARE ADDITIVE. 6. TOP BARS ARE DEFINED AS HORIZONTAL REINFORCEMENT WITH MORE THAN 12 INCHES OF CONCRETE CAST BELOW THE DEVELOPMENT LENGTH OR SPLICE. 7. "SIDE LAP" LAP SPLICES TO MAINTAIN SPECIFIED CONCRETE COVER. WHEN BARS OF DIFFERENT SIZE ARE LAP SPLICED, USE THE LARGER OF THE DEVELOPMENT LENGTH OF THE LARGER BAR OR THE LAP SPLICE LENGTH OF THE SMALLER BAR. 8. NON-CONTACT SPLICES NOT PERMITTED. BAR SIZE #3 28 22 6 25 19 6 22 17 6 #4 38 29 8 33 25 7 29 23 6 #5 47 36 10 41 31 8 36 28 7 #6 56 43 12 49 37 10 44 34 9 #7 81 63 13 71 54 12 63 49 10 #8 93 72 15 81 62 13 72 56 12 #9 105 81 17 91 70 15 81 63 13 #10 118 91 19 102 79 17 92 71 15 #11 131 101 22 114 87 19 102 78 17 #3 17 16 6 16 16 6 16 16 6 #4 28 22 8 25 19 7 22 17 6 #5 41 32 10 36 28 8 32 25 7 #6 56 43 12 49 37 10 44 34 9 #7 90 69 13 78 60 12 70 54 10 #8 112 86 15 97 74 13 87 67 12 #9 135 104 17 117 90 15 105 81 13 #10 162 125 19 141 108 17 126 97 15 #11 190 146 22 165 127 19 147 114 17 STD HOOK DEV STD HOOK DEVTOP OTHER STD HOOK DEV BAR TYPE 3,000 PSI TOP OTHER BAR TYPE TOP OTHER BAR TYPE 4,000 PSI 5,000 PSI BAR SIZE STD HOOK DEV STD HOOK DEVTOP OTHER STD HOOK DEV BAR TYPE 3,000 PSI TOP OTHER BAR TYPE TOP OTHER BAR TYPE 4,000 PSI 5,000 PSI CONCRETE COMPRESSIVE STRENGTH CONCRETE COMPRESSIVE STRENGTH B 2 1 1'-0"2'-0" T/SLAB 99'-0" T/SLAB 100'-0" T/FTG 97'-0" HSS4.000x0.250 w/ BASE PL 1/2"x5"x0'-10" AND (2) 3/4" DIA ANCHORS 1'-0" 8" 8" 8" 2 1 1'-0"2'-0" T/SLAB 99'-0" T/SLAB 100'-0" 6" STUDS AT 16" 1/2" APA-RATED SHEATHING 1/2" CAST-IN ANCHORS AT 48" 1/2" PREFORMED EXP JOINT FILLER 3-#5 CONT #4 AT 12" DOWELS (ALT BEND DIRECTION) #4 AT 12" HORIZ #4 AT 12" DOWELS 2'-0" 4'-0" T/FTG 97'-0" 8" 8" 8" 1'-0" 2 1 1'-0"2'-0" T/SLAB 99'-0" 1/2" PREFORMED EXP JOINT FILLER 3-#5 CONT #4 AT 12" DOWELS (ALT BEND DIRECTION) #4 AT 12" HORIZ #4 AT 12" DOWELS 2'-0" 4'-0" T/FTG 97'-0" 8" 8" 8" 1'-0" 8" 8" 8" 2'-0" #4 AT 12" DOWELS (ALT BEND DIRECTION) 4'-0" 3-#5 CONT T/FTG 97'-0" T/SLAB 99'-0" #4 AT 12" HORIZ 1'-0"2 1 1'-0" 6" STUDS AT 16" 1/2" APA-RATED SHEATHING 1/2" CAST-IN ANCHORS AT 48" 1'-0" 6" 6" 2'-0"1'-0"1/2" PREFORMED EXP JOINT FILLER 3-#5 CONT #4 AT 12" T/FTG 98'-0" T/SLAB 100'-0" 6" STUDS AT 16" 1/2" APA-RATED EXTERIOR SHEATHING 1/2" CAST-IN ANCHORS AT 48" #4 AT 12" DOWELS 1'-0" 6" 6" 2'-0"1'-0"1/2" PREFORMED EXP JOINT FILLER 3-#5 CONT #4 AT 12" T/FTG 97'-0" T/SLAB 99'-0" 6" STUDS AT 16" 1/2" APA-RATED EXTERIOR SHEATHING 1/2" CAST-IN ANCHORS AT 48" #4 AT 12" DOWELS 2'-0"1'-0"3-#5 CONT #4 AT 12" T/FTG 97'-0" 1'-0" 6" 6" 1'-0" 2 1 T/SLAB 99'-0" #4 AT 12" DOWELS 4'-0" SLOPE T/NEW FTG 98'-0" T/NEW WALL 100'-0" #4x24" AT 12" DRILL AND ADHESIVE ANCHOR 6" INTO EXIST FOUNDATION NOTES: 1. ALIGN BOTTOM OF NEW AND EXISTING FOOTINGS. STEP FOOTING AND WALL AS REQUIRED PER TYPICAL DETAILS. 2. EXTEND NEW FOUNDATIONS DOWN TO THE MINIMUM DEPTH. B/EXIST 97'-0" (VIF) EXIST FDN NEW WALL & FTG T/NEW SLAB 100'-0" EXIST FDN NEW SLAB ON GRADE 1/2" DIA x 1'-6" AT 18" SMOOTH DOWELS. GREASE END OF DOWEL IN NEW SLAB. DRILL 6" INTO EXISTING SLAB HSS8.625x0.322 BOLLARD w/ CONCRETE FILL 18"x18" x 36" DEEP CONCRETE AROUND BOLLARD 1'-6"3'-0"#4 x 3'-0" EA WAY SLAB ON GRADE STANDARD 90° HOOK (TYP) SEE SPECIFIC WALL SECTIONS FOR SIZE AND SPACING OF WALL REINFORCING. (TYP) "U"-BARS AT END OF OPENINGS. MATCH SIZE AND SPACING OF HORIZ REINFORCING. WALL CORNERS WALL INTERSECTION LAP OUTSIDE HORIZONTAL REINF OR PROVIDE CORNER BARS AS SHOWN. MATCH SIZE AND SPACING OF HORIZONTAL WALL REINFORCING. SKEWED WALL SEE PLANLAP INSIDE HORIZ REINF OR PROVIDE DOWELS AS SHOWN. MATCH SIZE AND SPACING OF HORIZ REINF DISCONTINUOUS ENDSSPLICE (UNO)TENSION LAPSPLICE (UNO)TENSION LAPSPLICE (UNO) TENSION LAP 0"SPLICE (UNO) TENSION LAP T1'-0"SPL ICE (UNO)TEN S ION LAP 0".0".6" CONT WATERSTOP SEE SPECIFIC WALL SECTIONS FOR SIZE AND SPACING OF WALL REINF CONTINUE 100 PERCENT OF HORIZ REINF THROUGH JOINT JOINT - SEE GENERAL NOTES FOR SPACING NOTES: 1. WATERSTOP REQUIRED FOR SUB-GRADE WALLS RETAINING BACKFILL MATERIAL. OMIT OTHERWISE. 2. ROUGHEN FIRST POUR TO A 1/4" AMPLITUDE OR FORM THE JOINT WITH A STAY-IN-PLACE PERFORATED METAL BULKHEAD TO ACHIEVE THE SAME RESULT. SPLICE TENSION LAP CL VERT WALL REINF - SEE SPECIFIC SECTIONS FOR SIZE AND SPACING. MATCH HORIZ FOOTING REINFORCING HORIZ FOOTING REINFORCING HORIZ FOOTING REINFORCINGT(1'-6" MAX)dT2'-0" MIN MIN 1.5d 2d MIN T2'-0" MIN ISOLATION JOINT CONSTRUCTION JOINT CONTRACTION JOINT NOTES: 1. LOCATE CONSTRUCTION JOINTS AT CONTRACTION JOINT LOCATIONS SHOWN ON PLAN. MATCH CONTRACTION JOINT PROFILE. 2. MAXIMUM SPACING BETWEEN CONTRACTION JOINTS = 15'-0". SEE PLAN FOR LOCATIONS. 3. 3/4" x 1'-4" SMOOTH DOWEL AT 18 INCHES ON CENTER. SET AT T/2 BELOW TOP OF SLAB. GREASE ONE END. 4. DO NOT PLACE DOWELS WITHIN 12" OF A SLAB CORNER. 1/2" FULL DEPTH JOINT FILLERSEE NOTE 1 SEE NOTE 3 1-#4 EA SIDE 1/8" SAWN OR PREFORMED JT R=1/8" MAX SOG SUB BASE SEE PLAN AND TYP SOG DETAILTT/32" CL CL CL INTERRUPT REINF AT JOINTS (TYP) NOTES: 1. PROVIDE CONTINUOUS PROTECTION AGAINST WATER INFILTRATION PRIOR TO INSTALLATION OF VAPOR BARRIER AND POROUS SUB BASE. MAINTAIN VAPOR BARRIER AND SUB BASE IN DRY CONDITION UNTIL BUILDING IS OCCUPIED. 2. PROVIDE ENGINEERED FILL IN AREAS THAT DO NOT STABILIZE UNDER PROOFROLLING. PROOFROLLED SUB-GRADE NOTE 2 CONTINUOUS VAPOR BARRIER DRAINAGE COURSE SLAB ON GROUND T/SLAB SEE PLAN SEE PLANSEE PLAN2- #4 x 48", 3/4" CLR FROM T/SLAB EDGE OF SLAB 2 "CLR2"ARCHITECTCONSTRUCTION MANAGERPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONSBID DOCUMENTS 10-26-22 21011 CLIENTS301TYPICAL FOUNDATIONDETAILSCARMELTOWNSHIP BLDG.RENOVATION ANDEXPANSION20 TENSION LAP SPLICE LENGTHS FOR GRADE 60 REINFORCEMENT 1/2" = 1'-0" 2 SECTION AT COLUMN IN GARAGE DEMISING WALL 1/2" = 1'-0"1 SECTION AT GARAGE DEMISING WALL 1/2" = 1'-0" 3 SECTION AT SLAB ELEVATION CHANGE 1/2" = 1'-0" 4 SECTION AT GARAGE DEMISING WALL 1/2" = 1'-0"5 SECTION AT EXTERIOR WALL 1/2" = 1'-0" 6 SECTION AT GARAGE WALL 1/2" = 1'-0" 7 SECTION AT GARAGE DOOR 1/2" = 1'-0" 8 NEW FOUNDATATION SPLICE TO EXISTING FOUNDATION 1/2" = 1'-0" 9 NEW SLAB SPLICE TO EXISTING SLAB 1/2" = 1'-0"10 PIPE BOLLARD DETAIL 1/2" = 1'-0" 11 TYPICAL WALL REINFORCING PLAN 1/2" = 1'-0" 12 TYPICAL WALL CONSTRUCTION JOINT 1/2" = 1'-0" 13 TYPICAL DETAIL AT FOOTING STEP 1/2" = 1'-0"15 TYPICAL SLAB ON GRADE JOINTS 1/2" = 1'-0"14 TYPICAL SLAB ON GRADE DETAIL 1/2" = 1'-0" 16 ADDITIONAL REINFORCING AT SLAB ON GRADE CORNERS 03/10/23