HomeMy WebLinkAboutC600_SpecificationsBUILDING ADDITIONDIRECTORY PATH: R:\Active\Carmel Communications\Clay Twp Addition\Design\CAD\Plans\BASE BIDFILENAME: C600 SPECIFICATIONS.dwgDATE/USER: 6/8/2022 1:53 PM / DpelosoDevelopment ConsultantsTransportation &P R OFESSIONAL ENGINEERJUSTEN JAMES HOCHSTET L E R
C600 C600SPECIFICATIONSEARTHWORK
1. SCOPE OF WORK
2. BENCH MARKS
3. REMOVAL OF TREES
4. HANDLING OF TOPSOIL
5. DISPOSITION OF UTILITIES
6. SITE GRADING
7. EARTH WORK BALANCE
CITY OF CARMEL RIGHT-OF-WAY PAVING POLICY1. GENERAL
2. FOUNDATION
CITY OF CARMEL CONCRETE CURB POLICY1. General
2. Foundation
3. Aggregate Bases
5. INSPECTIONS
”
STORM SEWER SYSTEMS
1. SCOPE OF WORK
2. STORM SEWER CONSTRUCTION
3. APPLICATION
3. AGGREGATE BASES
4. ASPHALT PAVEMENT
4. Concrete Curb
5. Inspections
6. Acceptance
03/10/23