HomeMy WebLinkAboutEP101 - FIRST FLOOR ELECTRICAL PLANK-3427HIGHLINETOILETSVITREOUS CHINA
K-3427HIGHLINETOILETSVITREOUS CHINA
K-3427HIGHLINETOILETSVITREOUS CHINA
K-3427HIGHLINETOILETSVITREOUS CHINA
K-3427HIGHLINETOILETSVITREOUS CHINA
K-3427HIGHLINETOILETSVITREOUS CHINA
RAMP UP
RAMP UP
RAMP UP
JJJTTTS
S
S
S
S
FTTJJJTTT
T SFS
SFSFS
S
H
HS J
G3
G2
G1
G5
G4
H1
L1
T1
1
2
EM1
3
3
4
4
4
CONFERENCE
112
RECEPTION
113
ADMIN OFFICE
114
DIRECTOR
OFFICE
115
WORK SPACE
105
OFFICE
110
OFFICE
109
OFFICE
108
GIS DIRECTOR
OFFICE
117
GIS TECH
OFFICE
118
SYSTEM ADMIN
OFFICE
116
STAGING/STORAGE
104
NEW GARAGE
100
SS-1
5
5
6
EM1-30
EM1-30
7
EM1- 24
EM1-26
EM1- 28EM1-28
G4-28,30
G4-31,33
G4-34,36
8
8
9
55
5
L1-1
+60"
+60"
+60"
+60"
+60"
10
+60"
L1- 3
L1- 3
L1- 5
L1-3
L1- 7 L1-9L1- 9
L1- 9
L1- 9
L1- 9
L1- 9L1-11L1-11L1-11L1-11L1-13
L1-15
L1-17
L1-19
L1-19
L1-19
L1-19
L1-21
L1-7
L1-23
L1-23
11
11
L1-25 L1-25 L1-25
L1-25
L1-25
L1-27L1-27
L1-27 L1-27
L1-29
L1-29 L1-29
L1-29
L1-31
L1-31
L1-31
L1-31
L1-33
L1-33
L1-33
L1-33
L1-35
L1-35
L1-37
L1-37
L1-37
L1-37
L1-10,12,14
L1-16,18,20 ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS2 WEST MAIN STREET O: 317.810.1502CARMEL, IN 460322101
10-26-2022
BID DOCUMENTS
EP101FIRST FLOORELECTRICAL PLANCLAY TOWNSHIPCENTER10701 North CollegeAvenueCarmel, INN
1/8" = 1'-0"
FIRST FLOOR ELECTRICAL PLAN1
SHEET KEYNOTES
1 EXISTING RECEPTACLE BACK BOX AND CONDUIT WITHIN WALL SHALL BE
REUSED FOR NEW MODULAR FURNITURE CONNECTIONS.
2 BACKBOX FROM EXISTING RECEPTACLE SHALL BE REUSED FOR NEW GFCI
TYPE RECEPTACLE.
3 PROVIDE 1"CONDUIT DOWN COLUMN TO JUNCTION BOX AT 1'-6" TO PROVIDE
POWER TO MODULAR FURNITURE AS SHOWN.
4 PROVIDE 1"CONDUIT DOWN WALL TO JUNCTION BOX AT 1'-6" TO PROVIDE
POWER TO MODULAR FURNITURE. COORDINATE EXACT FURNITURE LOCATION
WITH OWNER/ARCHITECT PRIOR TO ROUGH-IN.
5 RECEPTACLE TO BE INSTALLED IN TELEVISION RECESSED CHEIFBOX.
6 PROVIDE A 4" TALL PAD FOR TRANSFORMER MOUNTING. PAD DIMENSIONS TO
BE 4" LARGER THAN TRANSFORMER FOOTPRINT IN ALL DIRECTIONS.
7 PROVIDE CEILING MOUNTED 14-30R FOR DATA RACK POWER. CIRCUIT SHALL
BE FED BY (4) #10,#10 G. IN 3/4” CONDUIT. PROVIDE 2 POLE 30A BREAKER AT
PANEL SPACES NOTED TO SUPPLY POWER.
8 PROVIDE CEILING MOUNTED CORD REEL WITH 45’ OF CABLE WITH DUPLEX
RECEPTACLE MODULE. BASIS OF DESIGN HUBBELL HBLI45123GF220K.
9 PROVIDE 15A RATED TOGGLE SWITCH FOR ROOM EXAUST FAN CONTROL.
10 PROVIDE A MINIMUM OF A 6 GANG, ON GRADE RATED, RECESS ACCESS
FLOORBOX. INSTALL TWO DUPLEX MODULES WITHIN FLOORBOX. ROUTE 1”
CONDUIT ALONG SAME PATH AS DATA/AV CONDUIT THEN UP WALL AND BACK
TO PANEL AS NOTED. PRIOR TO SLAB DEMOLITION FOR FLOORBOX AND
CONDUITS CONTRACTOR SHALL X-RAY PROPOSE AREA TO ENSURE THAT
EXISTING INFASTUCTURE WILL NOT BE DAMAGED.
11 PROVIDE POWER FOR OVERHEAD COILING DOORS. PROVIDE
INTERCONNECTION BETWEEN DOOR CONTROLS AND DOOR MOTOR AS
NOTED BY COILING DOOR MANUFACTURER. CIRCUITING SHALL BE BY (3) #10,
#10 G IN 1” CONDUIT FOR COILING DOOR. COORDINATE COILING DOOR POWER
(VOLTAGE, PHASE, AMPS) REQUIREMENTS PRIOR TO ROUGH IN, IF
MANUFACTURER REQUIREMENTS DIFFER THAN SHOWN ON PLANS PROVIDE
PLAN TO ACCOMIDATE TO ENGINEER FOR APPROVAL.
# DESCRIPTION DATE
GENERAL NOTES
A REFER TO SHEET E-000 FOR GENERAL ELECTRICAL NOTES, SYMBOLS AND
ABBREVIATIONS.
03/10/23