HomeMy WebLinkAboutM000_Symbols & AbbreviationsK-3427HIGHLINETOILETSVITREOUS CHINA
K-3427HIGHLINETOILETSVITREOUS CHINA
K-3427HIGHLINETOILETSVITREOUS CHINA
K-3427HIGHLINETOILETSVITREOUS CHINA
K-3427HIGHLINETOILETSVITREOUS CHINA
K-3427HIGHLINETOILETSVITREOUSCHINA
T
TTTTTTT10
9
86
3 7
2
6
6
6
1
1
1
1 1
1
1
1
5
9
9
1
4
1
1
1
1
3
3
3
11
12
12 ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS2 WEST MAIN STREET O: 317.810.1502CARMEL, IN 460322101
10-26-2022
BID DOCUMENTS
MD101FIRST FLOORDEMOLITIONMECHANICAL PLANCLAY TOWNSHIPCENTER10701 North CollegeAvenueCarmel, INN
1/8" = 1'-0"
FIRST FLOOR DEMOLITION MECHANICAL PLAN1
GENERAL NOTES
A REFER TO SHEET M-000 FOR GENERAL MECHANICAL NOTES, SYMBOLS AND
ABBREVIATIONS.
SHEET KEYNOTES
1 REMOVE DIFFUSER AND DUCT TO THIS POINT. PREPARE FOR NEW
CONNECTION.
2 REMOVE DIFFUSER AND DUCT TO THIS POINT. PATCH WITH A DUCT
ENDCAP.
3 REMOVE DIFFUSER AND DUCT BACK TO MAIN. PATCH DUCT.
4 REMOVED DUCT TO THIS POINT. PREPARE FOR NEW CONNECTION.
5 REMOVE DUCT TO THIS POINT. PATCH WITH A DUCT ENDCAP.
6 REMOVE DUCT AND GRILLE COMPLETE.
7 REMOVE EXISTING FAN AND DUCTWORK. PATCH EXTERIOR WALL
PENETRATION.
8 REMOVE EXISTING FAN AND DUCTWORK. PATCH ROOF PENETRATION.
9 REMOVE THERMOSTAT AND WIRING. PRESERVE FOR RELOCATION.
10 REMOVE AND PRESERVE REHEAT COIL FOR RE-USE.
11 REMOVE PIPING AND SUPPORTS BACK TO COIL SHUTOFF VALVE AND CAP.
12 REMOVE PIPE TO THIS POINT AND PREPARE FOR NEW CONNECTION.
# DESCRIPTION DATE
03/10/23
K-3427HIGHLINETOILETSVITREOUS CHINA
K-3427HIGHLINETOILETSVITREOUS CHINA
K-3427HIGHLINETOILETSVITREOUS CHINA
RAMP UP
RAMP UP
RAMP UP
TTTTTTTTT
GIS TECH
OFFICE
118
GIS DIRECTOR
OFFICE
117
SYSTEM ADMIN
OFFICE
116
DIRECTOR
OFFICE
115
ADMIN OFFICE
114
EXIST. COFFEE/
BREAK
?
WORK SPACE
105
CONFERENCE
112
RECEPTION
113
EXIST. OPEN
CONFERENCE
?
Room
11
Room
12
Room
13
Room
14
EXIST.
RESTROOM
?
EXIST.
RESTROOM
?
Room
17
Room
18
Room
19
Room
28
Room
29
Room
30
NEW BREAK
ROOM
111
OFFICE
110
OFFICE
109
OFFICE
108
WORK SPACE
102
Room
37
Room
38
Room
39
EXIST.
TRUSTEE
?
Room
41
Room
42
IT DATA ROOM
106
CORRIDOR
107
STAGING/
STORAGE
104
PAINT BOOTH
101
STAGING/
STORAGE
103
EXIST.
TRAINING
?
NEW GARAGE
100
EX 30/18
EX 14/10
EX 11/10
EX 11/8
EX 11/5
EX 11/9
EX 11/7
EX 11/5
EX 17/9
EX 8/4EX 8/4
EX 8/4EX 8/4
EX 8/4EX 8/4
EX 8/4
EX 8/7
EX 13/7
EX 13/9
EX 20/15
EX
RHC-10
EX
RHC-12
EX
RHC-13
EX
RHC-14
EX
RHC-15
EX
RHC-16
EX 8/4
RHC-11
12/6
SD1SD1 -100
SD1SD1 -80
SD1SD1 -85
1
SD1SD1 -100 SD1SD1 -100
SD1SD1 -100 SD1SD1 -100
SD1SD1 -100 SD1SD1 -100
SD1SD1 -100 SD1SD1 -100
SD1SD1 -180
SD1SD1 -80
SD1SD1 -80
6ø
6ø
8/8
RG2
RG2
RG2
SD1SD1 -150
RG2
SD1SD1 -100
RG2
SD2SD2 -220
SD1SD1 -175
SD1SD1 -170
SD1SD1 -170
RG2
RG2
RG2
8/8
SD1SD1 -200
SD1SD1 -200
SD1SD1 -200
SD1SD1 -200 SD1SD1 -200
SD1SD1 -200
SD1SD1 -200
SD1SD1 -200
RG1
RG1 EG1
6ø 6ø
6ø 6ø
6ø6ø
6ø6ø
6ø
6ø
8ø
8ø
14ø
SG1SG1 -200 SG1SG1 -200
SG1SG1 -200 SG1SG1 -200
8ø8ø
8ø
8ø
10ø
14/10
26/10
8ø
8ø
14/10
10ø
8ø 8ø
14/10 12/18
RG3
RG2
SS-1
3/4" HHR
3/4" HHS
TO RTU-1
EX 8/4
RG2
ø6
EX 20/18
EX 8/4
ø6
ø8
11/11
EX 11/4 1 1/4" HHR1 1/4" HHS2
2
2
ø8
ø8
10/5
8/6
3
10/10
RG4
24/18
4
5
6
7
8 8
8
8
8
8
8
8
8 8
88
8
8
7
7
9
10 ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS2 WEST MAIN STREET O: 317.810.1502CARMEL, IN 460322101
10-26-2022
BID DOCUMENTS
M101FIRST FLOORMECHANICAL PLANCLAY TOWNSHIPCENTER10701 North CollegeAvenueCarmel, INN
1/8" = 1'-0"
FIRST FLOOR MECHANICAL PLAN1
GENERAL NOTES
A REFER TO SHEET M-000 FOR GENERAL MECHANICAL NOTES, SYMBOLS AND
ABBREVIATIONS.
SHEET KEYNOTES
1 RELOCATED REHEAT COIL.
2 RELOCATED THERMOSTAT.
3 REROUTE PIPING TO AVOID THE NEW DATA ROOM.
4 MOUNT TRANSFER GRILLE ABOVE DOOR, CENTERED ON DOOR.
5 MOUNT RETURN GRILLE ABOVE DOOR, CENTERED ON DOOR.
6 MOUNT HIGH WALL SPLIT SYSTEM AS HIGH AS POSSIBLE.
7 CONNECT NEW PIPING TO EXISTING A THIS LOCATION. DUCTWORK GAUGE TO
MATCH EXISTING.
8 CONNECT NEW DUCTWORK AT THIS LOCATION. DUCTWORK GAUGE TO MATCH
EXISTING .
9 EXPOSED DUCTWORK BEYOND THIS POINT.
10 CONDENSATE DRAIN FOR DUCTLESS SPLIT SYSTEM. ROUTE THROUGH WALL
AND TERMINATE 8-INCHES ABOVE FINISHED GRADE.
# DESCRIPTION DATE
03/10/23
EF-1
RTU-1
SSCU-1
1
2 ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS2 WEST MAIN STREET O: 317.810.1502CARMEL, IN 460322101
10-26-2022
BID DOCUMENTS
M102ROOFMECHANICAL PLANCLAY TOWNSHIPCENTER10701 North CollegeAvenueCarmel, INN
1/8" = 1'-0"
ROOF MECHANICAL PLAN1
GENERAL NOTES
A REFER TO SHEET M-000 FOR GENERAL MECHANICAL NOTES, SYMBOLS AND
ABBREVIATIONS.
SHEET KEYNOTES
1 PACKAGED ROOFTOP HEATING/VOOLING UNIT IS TO BE INSTALLED A
STANDARD 14-INCH ROOF CURB.
2 SPLIT SYSTEM CONDENSING UNIT TO BE INSTALLED ON CONDENSING UNIT
PAD.
# DESCRIPTION DATE
03/10/23
TYPICAL
PACKAGED
ROOFTOP UNIT
PLUG
VALVE
UNION
PIPE REDUCER
PRESSURE
REDUCING
VALVE
DIRT
LEG
PIPING BRANCH
REFER TO PLANS
FOR SIZE
PIPE
SUPPORT
(TYPICAL)
INSTALL GROMMET
AT PENETRATION THRU
CABINETRSRLEVAPORATOR COIL
THERMAL EXPANSION VALVE
SIGHTGLASS
REFER TO MANUFACTURER FOR
REFRIGERANT LINE SIZES
AIR COOLED CONDENSING UNIT WITH FACTORY
INSTALLED:
1. LIQUID LINE FILTER DRIER
2. SUCTION AND DISCHARGE LINE REFRIGERATION
CHARGING CONNECTIONS
FIELD BRAZED
CONNECTIONS
ISOLATION VALVE, TYP.
CLEAN OUTPITCH DOWN
TOWARD DRAIN
CLEAN OUT
DRAIN SHALL BE AT LEAST THE
SAME SIZE AS THE NIPPLE ON
THE DRAIN PAN
FLOOR DRAIN
AIR HANDLING
UNIT DRAIN PAN
1"BAP = NEGATIVE PRESSURE (IN OF
WATER)
A = 1/2P + 2 IN
B = 1 1/2P + 2 IN
P
PITCH DOWN
TOWARD DRAIN
CLEAN OUT
DRAIN SHALL BE AT LEAST THE SAME SIZE
AS THE NIPPLE ON THE DRAIN PAN
FLOOR DRAIN
AIR HANDLING
UNIT DRAIN PAN
1"P = POSITIVE PRESSURE (IN OF
WATER)
A = P + 2 IN
P
CLEAN OUT
AAA. METALLIC FLEXIBLE DUCT SHALL BE ATTACHED USING A MINIMUM OF THREE #8 SHEET METAL
SCREWS EQUALLY SPACED AROUND THE DUCT'S CIRCUMFERENCE; DUCTS LARGER THAN 12"∅
SHALL HAVE A MINIMUM OF FIVE #8 SHEET METAL SCREWS. SCREWS SHALL BE LOCATED AT
LEAST 1/2" FROM THE DUCT END.
B. NON-METALLIC FLEXIBLE DUCT SHALL BE SECURED TO THE SLEEVE OR COLLAR USING A DRAW
BAND. IF THE DUCT COLLAR EXCEEDS 12"∅, THE DRAW BAND MUST BE POSITIONED BEHIND A BEAD
ON THE METAL COLLAR.
C. INSULATION AND VAPOR BARRIERS PRESENT ON FACTORY-FABRICATED DUCTS SHALL BE FITTED
OVER THE CORE CONNECTION AND SHALL BE SUPPLEMENTALLY SECURED WITH A DRAW BAND.
D. FLEXIBLE DUCT SEALING SHALL BE A CLASS "B" SEAL FOR LOW PRESSURE SUPPLY.
JOINING AND ATTACHING FLEXIBLE DUCT SPECIFICATION:
RECTANGULAR
SUPPLY DUCT
SPIN-IN FITTING
W/VOLUME DAMPER
FLEX DUCT-MAXIMUM 6'-0"
LENGTH AND NO MORE THAN
ONE (1) 90° BEND.
SQUARE TO ROUND FITTING
CEILING
SUPPLY DIFFUSER
90° METAL ELBOW
TYPICAL AT ALL DIFFUSER
CONNECTIONS
UPBLAST CENTRIFUGAL EXHAUST FAN
BIRDSCREEN
NEMA 3R DISCONNECT FACTORY
WIRED FROM MOTOR TO DISCONNECT
THROUGH THE BREATHER TUBE
LIQUID TIGHT FLEXIBLE CONDUIT
(BY OTHERS)
PREFABRICATED ROOF CURB
ROOF
AUTO BACKDRAFT DAMPER
SEE PLANS FOR DUCT SIZE
PROVIDE HOLE
THRU ROOF
SEE ARCH PLANS
FOR ROOF CONSTRUCTION
4' LONG
8"TYPE "AT" GRILLE-SEE
FLOOR PLANS FOR SIZE.
INTERNALLY LINED DUCTWORK
SEE FLOOR PLANS FOR DUCT SIZE.ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS2 WEST MAIN STREET O: 317.810.1502CARMEL, IN 460322101
10-26-2022
BID DOCUMENTS
M501MECHANICALDETAILSCLAY TOWNSHIPCENTER10701 North CollegeAvenueCarmel, INNOT TO SCALE
ROOFTOP UNIT GAS PIPING DETAIL1
NOT TO SCALE
REFRIGERATION PIPING DETAIL3
NOT TO SCALE
NEGATIVE PRESSURE CONDENSATE DRAIN TRAP
DETAIL4
NOT TO SCALE
POSITIVE PRESSURE CONDENSATE DRAIN TRAP
DETAIL5
NOT TO SCALE
TYPICAL SUPPLY DIFFUSER INSTALLATION7
NOT TO SCALE
TYPICAL EXHAUST FAN (UPBLAST) DETAIL6
NOT TO SCALE
AIR TRANSFER DUCT DETAIL2
# DESCRIPTION DATE
03/10/23