Loading...
HomeMy WebLinkAboutPacket for PC 03-21-23 PLAN COMMISSION PACKET FOR Irving Materials Corporate Headquarters Docket No. PZ-2023-00005 DP/ADLS Hearing Date: March 21, 2023 Submitted by: Tuohy Bailey & Moore LLP, Snelling Engineering, LLC & Luminaut | Rowland on behalf of Petitioner, IMI Real Estate, LLC (formerly known as Irving Materials, Inc.) TABLE OF CONTENTS Tab 1 Description of Project Tab 2 Location Map Tab 3 Site Design • Site Plan • Aerial Exhibit with Proposed Site Development Tab 4 Architectural Design • Color Renderings • Building Elevations • Materials Sheets • Dumpster Enclosure Plan / Elevations • Floor Plans • Roof Plan Tab 5 Landscaping Plans Tab 6 Lighting Plans Tab 7 Signage Plans Tab 8 Development Plan Findings of Fact Form Tab 1 Description of Project DESCRIPTION OF PROJECT IMI Real Estate, LLC (formerly known as Irving Materials, Inc.) (“Petitioner”) filed a Development Plan Application and an ADLS Application in connection with the proposed development of a 4-story office building with covered parking (“Office Building”) on an approximately 19.6 acre site at the southeast corner of Illinois Street and 111th Street (“Site”). Petitioner proposes the Site be improved with the Office Building for use as the corporate headquarters for an Indiana business, Irving Materials. The Site is located in the Meridian Corridor zoning district, which allows for the proposed office use. The Site is bordered by Illinois Street on the west, 111th Street on the north and US 31 on the east. The uses surrounding the Site include the KAR Global office and parking garage to the north, the Forte/Franciscan office and parking garage to the South, the Delta Faucet office to the east across U.S. 31 and a residential neighborhood to the west. The Office Building will consist of approximately 62,500 +/- square feet with most of the parking located in a covered area below the Office Building. The Office Building’s exterior elevations will be constructed with precast concrete panels, aluminum store front systems and glass fiber reinforced cement. The location of the Office Building on the far east side of the Site will allow for substantial separation and screening between the Office Building and the residential homes on the west side of Illinois Street. The Office Building is Phase 1 of the proposed development of the Site. Applications for Development Plan and ADLS approvals for future development on the Site(Phase 2) will be submitted at a later date. Petitioner anticipates that Phase 2 will be an expansion of IMI’s corporate headquarters. Tab 2 Location Map Location Map Tab 3 Site Design Tab 4 Architectural Design Tab 5 Landscaping Plans Tab 6 Lighting Plans Tab 7 Signage Plans 48"64"SITE SIGN CONCEPT10 March 2023IMI HeadquartersRLR ASSOCIATES INC72" B/ DETAILnot to scaleA/ EAST ELEVATIONnot to scaleBUILDING SIGN CONCEPT10 March 2023IMI HeadquartersRLR ASSOCIATES INCSpandrel width± 39'-6"MAXIMUM SIGN SIZE33'-7" W × 8'-5" H PROPOSED SIGN SIZE22'-1" W × 8'-0" H Spandrel height12'-2"MAXIMUM SIGNABLE AREA31'-7" (80% SPANDREL WIDTH) ×8'-5 1/2" (70% OF SPANDREL HEIGHT)12'-2"± 39'-6"8'-0"± 22'-1" Tab 8 Development Plan Findings of Fact Form Page 9 Filename: Development Plan and DP Amend Application 20 FINDINGS OF FACT FORM DEVELOPMENT PLAN CONSIDERATION Carmel Plan Commission, Carmel, Indiana DOCKET NO. DP PROJECT NAME: PETITIONER: Based upon all the evidence presented by the Petitioner and upon the Department Report of the Department of Community Services, dated, we determine that the Development Plan complies with the Standards set forth in the Carmel Unified Development Ordinance. We hereby approve the Development Plan as submitted with the following specific conditions as agreed to by the petitioner. Condition 1. Condition 2. We hereby disapprove of the Development Plan as submitted for the following reasons: 1. 2. 3. DATED THIS DAY OF , 20 . Commission Member Rev. PZ-2023-00005 DP/ADLS IMI Corporate Headquarters IMI Real Estate, LLC (formerly known as Irving Materials, Inc.) Thank You!