Loading...
HomeMy WebLinkAboutCorrespondence1ST STREETMONON BLVD.EXISTING DEPOTARCHIVES ANNEXCARMEL CLAY HISTORICAL SOCIETY0'10'20'30'(IN FEET)GRAPHIC SCALECall 811 or 800-382-5544 Before you Dig!SITE IMPROVEMENT KEYNOTES:#LEGEND:EXISTINGPROPOSEDREENIGNELANOISSEFORP No.PE11700769--------C1.1INDIANAPOLIS - TERRE HAUTELAFAYETTE - MUNCIE - NEW ALBANYwww.hwcengineering.comSITE UTILIZATION Proposed siteaccess locationConstruction fence tobe installed andmaintained bycontractor.No construction activity on bike pathor in street/parallel parking lane.No construction activityon corner. To remainopen during construction. To: City of Carmel City of Carmel Engineering Department One Civic Square Carmel, Indiana 46032 Date: December 23, 2022 Attn: Alex Jordan Re: Carmel Clay History Museum – BPW Request Letter Alex, We would like to formally request the closure of the sidewalk, adjacent to the property, north and east of the site. The contractor would like to keep the fence behind the pavers so that construction doesn’t damage them or the trees. See attached Site Utilization exhibit for additional information Please let me know if there are any questions or if any additional information is needed. Sincerely, Chad James, PE Senior Project Manager City of Carmel City of Carmel Engineering Department One Civic Square Carmel, Indiana 46032 Date: December 23, 2022 Attn: Alex Jordan, John Thomas Re: Carmel Historic Society Building Alex, John, Please consider this letter as a formal request to seek Waivers for the following items at Carmel Historic Society Building: Carmel Stormwater Technical Standards Manual Section 303.07: Drainage System Overflow Design The Finished floor elevation is required to be 1’ above the adjacent roadway and the MFPG is required to be 1’ above the local ponding resulted in the 100-year clogged condition. Due to the existing grades along the east side of the property and being required to meet ADA requirements at the main entrance of the building (eastern entrance), the finished floor elevation has to be at 828.10. On the southside of the building we are approximately 10” above top of curb. However, with Monon Boulevard increasing in elevation as you move north along the property line, on the north side of the building, the building is about 4” below the existing top of curb. Same issue with the MFPG. With the owner/developer wanting a Monon Boulevard access on the north side of the building, it has created a low point on the north side of the building. In order to match FFE at the door location while maintaining ADA compliant slopes, and matching at the existing Monon trail elevations, the overflow elevation for that area, will be about 5” above FFE. We would like to request a variance from these requirements. UDO 5.21.C – Bufferyards (C2 District Only) The minimum bufferyard width shall be equal to the building heigh of the nearest building to each side or rear lot line, not to exceed thirty-five (35) feet. We have placed the building along the east property line (as far east as we possibly can). This has allowed us to maximize the rear yard on the west side of the property. However, due to the size of the building, we are only able to provide ±15 feet. We would like to request a variance from the 35’ buffer yard requirement for this project. Please let me know if there are any questions or if any additional information is needed. Sincerely, Chad James, PE Senior Project Manager