Loading...
HomeMy WebLinkAboutC350 - Erosion Control Plan - NORTHEAST - G3.5TBM#1 = 813.74KEYSTONE AVENUE / S.R. 431KEYSTONE AVENUE / S.R. 431PROPERTY LINESFSFSF222244444999999COPYRIGHT 2022 BY FANNING/HOWEY ASSOCIATES, INC.WWW.FHAI.COMARCHITECTPROJECT NUMBER: 222063.00CARMEL HIGHSCHOOLGREYHOUNDACTIVITY CENTERCARMEL CLAY SCHOOLS520 E MAIN STREETCARMEL, IN 46032PROJECT ISSUE DATE: 12.01.2022CONSTRUCTION DOCUMENTSDRAWN BY: ARS317.848.0966350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204REV.NO.DESCRIPTIONDATECONSULTANTPROJECT MANAGER: PMR19700317No.INLETS, VALVES, AND MARKS MADE UPON THE GROUND BYALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOREXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIESSHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAYALL CONSTRUCTION.THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIESEVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUNDCAUTION !!Know what'sbelow.before you dig.CallRCall 811 or 1-800-382-5544 Before You Begin Any Digging Project.Call 48 hours or 2 working days before you dig.It's Fast, It's Easy and It's the Law in the state of Indiana! 309003060G3.5EROSION CONTROL PLAN -NORTHEAST1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND.2.SEE DRAWING G4.1 FOR EROSION CONTROL DETAILS.3.ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES MAY BE REQUIREDBY THE INSPECTOR.GENERAL NOTES EROSION CONTROL KEYNOTES1.SILT FENCE2.INLET SEDIMENT PROTECTION3.CONSTRUCTION ENTRANCE DRIVE4.SEED DISTURBED AREAS5.PORTABLE TOILET - ANCHOR TO PREVENT SPILLS6.CONCRETE WASHOUT7.SWPPP INFORMATION BOARD8.EROSION CONTROL BLANKET9.CONSTRUCTION LIMITS10.DURING CONSTRUCTION KEEP PAVEMENT AND SIDEWALKS CLEAN AND WORK AREAS IN ANORDERLY CONDITION. CLEAN WHEELS OF VEHICLESBEFORE LEAVING SITE TO AVOID TRACKING SOILONTO ROADS OR OTHER PAVED AREAS.EROSION CONTROL LEGENDCWSFPTSEE EROSION CONTROL PLAN - NORTH - G3.3 SEE EROSION CONTROL PLAN - SOUTHEAST - G3.4 (NOT IN PROJECT)1REGULATORY REVIEW1-18-20232TAC RESPONSE03-07-2023