HomeMy WebLinkAboutC600 - Overall Site Utility Plan - SU1.0UP
REF.23'-8
5
/8
"26'-6
3
/8
"23'-8
5
/8
"28'-0 3/8"20'-8"32'-7 5/8"20'-8
"175'-11 5/8"76'-0"26'-0
"76'-0
"
52'-8"
31'-10"18'-9 5/8"TBM#1 = 813.74TBM#2 = 809.81TBM#3 = 803.80FINAL PLAT OFARDEN TOWNHOMESINS
T
R
.
#
2
0
0
7
0
0
1
1
7
1LOT1201LOT1202LOT1203LOT1204LOT1205LOT1206LOT1207LOT 1301LOT 1302LOT 1303LOT 1304LOT 1305LOT 1306LOT 1401LOT 1402LOT 1403LOT 1404LOT 1405LOT 1406LOT 1701LOT 1702LOT 1703LOT 1704LOT 401LOT 402LOT 403LOT 404LOT 405LOT 301LOT 302LOT 303LOT 304LOT 305LOT 201LOT 202LOT 203LOT 204LOT 205LOT 101LOT 102LOT 103LOT 104LOT 105COMMON AREA "B"COMMON AREA "N"PRIVATE ALLEYCOMMON AREA "L"COMMON AREA "H"COMMON AREA "F"COMMON AREA "E"PRIVATE ALLEYPRIVATE ALLEY
FDCFDCFDCPROPERTY L
INEPROPERTY LINE
PROPERTY LINEPROPERTY LINEPROPERTY LINEPROPERTY LINEPROPERTY LINECONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTION LIMITSGREYHOUND ACTIVITY CENTERSOUTH ENTRANCE BUILDINGSCOPYRIGHT 2023 BY FANNING/HOWEY ASSOCIATES, INC.WWW.FHAI.COMARCHITECTPROJECT NUMBER: 220136.00CARMEL STADIUMSOUTH SUPPORTBUILDINGCARMEL CLAY SCHOOLSE 136th St, Carmel, IN 46032PROJECT ISSUE DATE: 04.26.2023CONSTRUCTION DOCUMENTSDRAWN BY: ARS317.848.0966350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204REV.NO.DESCRIPTIONDATECONSULTANTPROJECT MANAGER: PMR19700317No.SU1.0SITE UTILITY PLAN - OVERALL80240080160SEE SITE UTILITY PLAN SU1.4(SOUTH SUPPORT BUILDINGS PROJECT)SEE SITE UTILITY PLAN SU1.5(GREYHOUND ACTIVITY CENTER PROJECT)SEE EROSION CONTROL PLAN G3.3(GREYHOUND ACTIVITY CENTER PROJECT)SEE SITE UTILITY PLAN SU1.1(SOUTH SUPPORT BUILDINGS PROJECT)SEE SITE UTILITY PLAN SU1.2(NOT IN CONTRACT)50' UTILITY KEYNOTES1.CONNECT NEW GREYHOUND ACTIVITY CENTER NATURAL GAS LINESERVICE FEED TO EXISTING ON-SITE GAS MAIN, COORDINATECONNECTION WITH UTILITY COMPANY. PROTECT THE EXISTING GASLINE(S) DURING BOTH DEMOLITION AND CONSTRUCTION ACTIVITIES.2.PROPOSED GAS LINE ROUTE TO NEW GREYHOUND ACTIVITY CENTER3.CONNECT NEW SOUTH SUPPORT BUILDING NATURAL GAS LINESERVICE FEED TO EXISTING ON-SITE GAS MAIN, COORDINATECONNECTION WITH UTILITY COMPANY4.PROPOSED GAS LINE ROUTE TO NEW SOUTH SUPPORT BUILDING1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONALLEGEND.2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWNWERE PROVIDED BY CEC CIVIL & ENVIRONMENTALCONSULTANTS DATED MAY 17, 2022. THE ENGINEER MAKES NOGUARANTEES THAT THE UNDERGROUND UTILITIES SHOWNCOMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER INSERVICE OR ABANDONED.3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THEPROJECT AREA INCLUDING UNDERGROUND UTILITYCONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITECONSTRUCTION. REPORT ANY DISCREPANCIES TO THEENGINEER.GENERAL NOTES13422222ADDENDUM #11-6-202312REGULATORY REVIEW1-18-20233TAC RESPONSE03-17-20234SSB FINAL CD'S4-26-202355-5-2023TAC RESPONSEHORIZONTAL AND VERTICAL DATUM:65-6-2023TAC RESPONSE