Loading...
HomeMy WebLinkAboutC011 - Demolition Plan - SOUTH - GD1.1SMOKEY ROW ROAD / E 136TH STREETTBM#2 = 809.816TYP.6TYP.6TYP.6TYP.6TYP.4444444435555117777588822229958TPTPTPTPTP TP TPTPTPTPTPTP TPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTP TPTPTP 26826263435151512828282828433551810PROPERTY LINE52121212128282130303030111130301010999511281212TPTPTP TPTPTP 26TPTPTP SFSFSFSF309003060INLETS, VALVES, AND MARKS MADE UPON THE GROUND BYALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOREXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIESSHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAYALL CONSTRUCTION.THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIESEVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUNDCAUTION !!Know what'sbelow.before you dig.CallRCall 811 or 1-800-382-5544 Before You Begin Any Digging Project.Call 48 hours or 2 working days before you dig.It's Fast, It's Easy and It's the Law in the state of Indiana! GD1.1DEMOLITION PLAN - SOUTHDEMOLITION LEGENDAPPROXIMATE LIMITS OF CONCRETE PAVEMENT REMOVALAPPROXIMATE LIMITS OF ASPHALT PAVEMENT REMOVALTPTPTP TREE PROTECTION REQUIREDAPPROXIMATE LIMITS OF CONSTRUCTIONAPPROXIMATE LIMITS OF UTILITY LINE REMOVAL1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONALLEGEND.2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWNWERE PROVIDED BY CEC CIVIL & ENVIRONMENTALCONSULTANTS DATED MAY 17, 2022. THE ENGINEER MAKES NOGUARANTEES THAT THE UNDERGROUND UTILITIES SHOWNCOMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER INSERVICE OR ABANDONED.3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THEPROJECT AREA INCLUDING UNDERGROUND UTILITYCONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITECONSTRUCTION. REPORT ANY DISCREPANCIES TO THEENGINEER.GENERAL NOTESSEE SITE DEMOLITION PLAN - SOUTHEAST - GD1.4 SEE SITE DEMOLITION PLAN - WEST - GD1.6 (NOT IN PROJECT)SEE SITE DEMOLITION PLAN - CENTER - GD1.2 (NOT IN PROJECT)LEGEND DEMOLITION KEYNOTES (SOUTH BLDG)1.REMOVE ASPHALT PAVEMENT2.REMOVE LIGHT POLE & LINE, COORDINATE WITH ELECTRICAL SITE DEMOPLANS3.REMOVE CONCRETE SIDEWALK4.REMOVE CONCRETE CURB5.SAWCUT EXISTING ASPHALT/CONCRETE6.BLACK OUT EXISTING PAVEMENT MARKING7.REMOVE CHAIN LINK FENCE, POSTS AND FOUNDATIONS8.REMOVE TREE & ROOTS TO 1'-6" BELOW GRADE9.PROTECT FENCE TO REMAIN10.PROTECT SANITARY STRUCTURE & LINE TO REMAIN11.REMOVE WATER LINE AS REQUIRED TO INSTALL PROPOSED WATER LINE -REFER TO SITE UTILITY PLAN12.REMOVE STORM LINE AND STRUCTURE 21. PROTECT ELECTRIC OUTLET, BOX & LINE TO REMAIN, ADJUST BOXES AND OUTLETS TO PROPOSED FINISHED GRADE AS NECESSARY 26. PROTECT TREE TO REMAIN 28. PROTECT STORM STRUCTURE & LINE TO REMAIN 30. PROTECT WATER LINE, HYDRANT & VALVE TO REMAINCOPYRIGHT 2022 BY FANNING/HOWEY ASSOCIATES, INC.WWW.FHAI.COMARCHITECTPROJECT NUMBER: 220136.00CARMEL STADIUMSOUTH SUPPORTBUILDINGCARMEL CLAY SCHOOLSE 136th St, Carmel, IN 46032PROJECT ISSUE DATE: 12.13.2022CONSTRUCTION DOCUMENTSDRAWN BY: ARS317.848.0966350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204REV.NO.DESCRIPTIONDATECONSULTANTPROJECT MANAGER: PMR19700317No.1REGULATORY REVIEW1-18-2023EROSION CONTROL LEGENDSF2TAC RESPONSE03-07-2023