Loading...
HomeMy WebLinkAboutC013 - Demolition Plan - NORTH - GD1.3TBM#1 = 813.74KEYSTONE AVENUE / S.R. 431222222222222227TYP.7TYP.7TYP.7TYP.7TYP.3171722219191919242425252555111889TPTPTPTPTP TPTPTP TPTPTPTPTPTPTPTPTPTPTPTP TPTPTP TPTPTP TP26262627272828281110101110282999777TYP.31323PROPERTY LINE PROPERTY LINE7TYP.82111911559999311130313014303131193131311414610101111111222111130302832153020202020208888888820209TPTPTP 2222793425TPTPTP 26SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFCOPYRIGHT 2022 BY FANNING/HOWEY ASSOCIATES, INC.WWW.FHAI.COMARCHITECTPROJECT NUMBER: 222063.00CARMEL HIGHSCHOOLGREYHOUNDACTIVITY CENTERCARMEL CLAY SCHOOLS520 E MAIN STREETCARMEL, IN 46032PROJECT ISSUE DATE: 12.01.2022CONSTRUCTION DOCUMENTSDRAWN BY: ARS317.848.0966350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204REV.NO.DESCRIPTIONDATECONSULTANTPROJECT MANAGER: PMR19700317No.INLETS, VALVES, AND MARKS MADE UPON THE GROUND BYALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOREXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIESSHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAYALL CONSTRUCTION.THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIESEVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUNDCAUTION !!Know what'sbelow.before you dig.CallRCall 811 or 1-800-382-5544 Before You Begin Any Digging Project.Call 48 hours or 2 working days before you dig.It's Fast, It's Easy and It's the Law in the state of Indiana! 309003060GD1.3SITE DEMOLITION PLAN - NORTHDEMOLITION LEGENDAPPROXIMATE LIMITS OF CONCRETE PAVEMENT REMOVALAPPROXIMATE LIMITS OF ASPHALT PAVEMENT REMOVALTPTPTP TREE PROTECTION REQUIREDAPPROXIMATE LIMITS OF CONSTRUCTIONAPPROXIMATE LIMITS OF UTILITY LINE REMOVAL1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONALLEGEND.2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWNWERE PROVIDED BY CEC CIVIL & ENVIRONMENTALCONSULTANTS DATED MAY 17, 2022. THE ENGINEER MAKES NOGUARANTEES THAT THE UNDERGROUND UTILITIES SHOWNCOMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER INSERVICE OR ABANDONED.3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THEPROJECT AREA INCLUDING UNDERGROUND UTILITYCONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITECONSTRUCTION. REPORT ANY DISCREPANCIES TO THEENGINEER.GENERAL NOTESSEE SITE DEMOLITIONPLAN - WEST - GD1.6(NOT IN PROJECT)SEE SITE DEMOLITION PLAN - CENTER - GD1.2 (NOT IN PROJECT)SEE SITE DEMOLITION PLAN - CENTER - GD1.2 (NOT IN PROJECT)SEE SITE DEMOLITION PLAN - NORTHEAST - GD1.5 LEGEND DEMOLITION KEYNOTES (GAC)1.REMOVE ASPHALT PAVEMENT2.REMOVE CONCRETE PAVEMENT3.REMOVE CONCRETE SIDEWALK5.SAWCUT EXISTING ASPHALT/CONCRETE6.BLACK OUT EXISTING PAVEMENT MARKING7.REMOVE CHAIN LINK FENCE, POSTS AND FOUNDATIONS8.REMOVE CHAIN LINK GATES, POSTS AND FOUNDATIONS. SALVAGE FOR RETURN TO OWNER9.PROTECT FENCE TO REMAIN10.REMOVE STORM MANHOLE STRUCTURE11.REMOVE STORM SEWER LINE12.CAP STORM PIPE WITH MECHANICAL PLUG - PER DETAIL ON DWG SU2.113.REMOVE SANITARY MANHOLE STRUCTURE14.REMOVE SANITARY SEWER LINE15.CAP SANITARY PIPE WITH MECHANICAL PLUG - PER DETAIL ON DWG SU2.117.REMOVE BUILDING - CONTRACTOR TO DISCONNECT AND REMOVE ALLASSOCIATED ELECTRICAL, MECHANICAL, AND PLUMBING SANITARY ANDSUPPLY COMPLETE PRIOR TO BUILDING DEMOLITION. REMOVE BUILDINGUTILITY LINES BACK TO NEAREST CONNECTION POINT. PROTECT ALLEXISTING LINES TO REMAIN. NOTIFY ARCHITECT OF ANY CONCERNS ORUNFORESEEN CONDITIONS.19.REMOVE LIGHTPOLE/ELECTRICAL OUTLET, COORDINATE WITH ELECTRICALSITE DEMOLITION PLANS20.REMOVE ELECTRICAL/TELECOM LINES/EQUIPMENT, COORDINATE WITH ELECTRICAL SITE DEMOLITION PLANS21.PROTECT ELECTRIC OUTLET, BOX & LINE TO REMAIN22.REMOVE TREE & ROOTS TO 1'-6" BELOW GRADE23.RELOCATE DISCUS CAGE TO LOCATION SHOWN ON SITE PLAN ANDREMOVE CONCRETE PAD24.LIMITS OF PROPOSED BUILDING25.PROTECT SYNTHETIC TURF AND CURB TO REMAIN26.PROTECT TREE TO REMAIN27.REMOVE GOAL POST AND SALVAGE TO OWNER28.PROTECT STORM STRUCTURE & LINE TO REMAIN29.WATER WELL - CONTRACTOR SHALL REMOVE THE WELL ASSEMBLY IN ITSENTIRETY AND TO 3' BELOW FINISHED GRADES. THE WELL SHALL BECAPPED AND DECOMMISSIONED PER LOCAL AND STATE REQUIREMENTSAND ORDINANCES.30. PROTECT WATER LINE, HYDRANT & VALVE TO REMAIN31. REMOVE WATER LINE AS REQUIRED TO INSTALL PROPOSED WATER LINE - REFER TO SITE UTILITY PLAN32. PROTECT SANITARY STRUCTURE & LINE TO REMAIN34.PROTECT CONCRETE WALK TO REMAINREMOVE 6 DEAD EVERGREENAND 1 DEAD DECIDIOUS TREEWITHIN WOODED FENCELINEREMOVE TREES AND SHRUBSAS REQUIRED TO INSTALLWATERLINE AND BUILDING1ADDENDUM #11-6-20232REGULATORY REVIEW1-18-2023EROSION CONTROL LEGENDSF3TAC RESPONSE03-07-2023