Loading...
HomeMy WebLinkAboutC150 - Site Plan - NORTHEAST - G1.5KEYSTONE AVENUE / S.R. 431KEYSTONE AVENUE / S.R. 4311212121212122623 5 ' FRO N T Y ARD S E T B AC K 3 0 ' GR E EN B E L T 221PROPERTY LINE22151515282828282828COPYRIGHT 2022 BY FANNING/HOWEY ASSOCIATES, INC.WWW.FHAI.COMARCHITECTPROJECT NUMBER: 222063.00CARMEL HIGHSCHOOLGREYHOUNDACTIVITY CENTERCARMEL CLAY SCHOOLS520 E MAIN STREETCARMEL, IN 46032PROJECT ISSUE DATE: 12.01.2022CONSTRUCTION DOCUMENTSDRAWN BY: ARS317.848.0966350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204REV.NO.DESCRIPTIONDATECONSULTANTPROJECT MANAGER: PMR19700317No.INLETS, VALVES, AND MARKS MADE UPON THE GROUND BYALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOREXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIESSHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAYALL CONSTRUCTION.THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIESEVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUNDCAUTION !!Know what'sbelow.before you dig.CallRCall 811 or 1-800-382-5544 Before You Begin Any Digging Project.Call 48 hours or 2 working days before you dig.It's Fast, It's Easy and It's the Law in the state of Indiana! 309003060PROPOSED SITE LEGENDBUILDINGCONCRETE SIDEWALK/PAVEMENTASPHALT PAVEMENTSEEDED LAWNSYNTHETIC TURFNATIVE SEED MIX APPROXIMATE LIMITS OF CONSTRUCTION1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONALLEGEND.2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWNWERE PROVIDED BY CEC CIVIL & ENVIRONMENTALCONSULTANTS DATED MAY 17, 2022. THE ENGINEER MAKES NOGUARANTEES THAT THE UNDERGROUND UTILITIES SHOWNCOMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER INSERVICE OR ABANDONED.3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THEPROJECT AREA INCLUDING UNDERGROUND UTILITYCONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITECONSTRUCTION. REPORT ANY DISCREPANCIES TO THEENGINEER.GENERAL NOTESG1.5SITE PLAN - NORTHEASTLEGENDSEE SITE PLAN - NORTH - G1.3 SEE SITE PLAN - SOUTHEAST - G1.4 (NOT IN PROJECT)10'5'10'5'30'-0"150°5'SITE KEYNOTES (GAC)CONCRETE SIDEWALK - SEE DETAIL A/G4.1LAWN AREA - SEE LANDSCAPE PLANSCONCRETE CONTROL JOINT - SEE DETAIL C/G4.14' WIDE MAN GATE, MATCH EXISTING FENCE HEIGHT AND FABRICCONCRETE EXPANSION JOINT - SEE DETAIL C/G4.12121521TYPTYPTYP281REGULATORY REVIEW1-18-20232TAC RESPONSE03-07-2023