Loading...
HomeMy WebLinkAboutC250 - Grading Plan - NORTHEAST - G2.5TBM#1 = 813.74KEYSTONE AVENUE / S.R. 431KEYSTONE AVENUE / S.R. 431MEGPROPERTY LINEST-118TOR: 811.49ST-120TOR: 811.13ST-117TOR: 811.05ST-119TOR: 810.52ST-121TOR: 809.96ST-123TOR: 807.59810.00809.00808.75MEG 811.09MEG 810.81TC 811.85BC 811.35811.37811.55TC 811.42BC 810.92811.80811.90811.66811.61811.55811.56811.99811.74811.82811.72811.89812.23ST-122TOR: 809.95COPYRIGHT 2022 BY FANNING/HOWEY ASSOCIATES, INC.WWW.FHAI.COMARCHITECTPROJECT NUMBER: 222063.00CARMEL HIGHSCHOOLGREYHOUNDACTIVITY CENTERCARMEL CLAY SCHOOLS520 E MAIN STREETCARMEL, IN 46032PROJECT ISSUE DATE: 12.01.2022CONSTRUCTION DOCUMENTSDRAWN BY: ARS317.848.0966350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204REV.NO.DESCRIPTIONDATECONSULTANTPROJECT MANAGER: PMR19700317No.INLETS, VALVES, AND MARKS MADE UPON THE GROUND BYALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOREXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIESSHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAYALL CONSTRUCTION.THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIESEVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUNDCAUTION !!Know what'sbelow.before you dig.CallRCall 811 or 1-800-382-5544 Before You Begin Any Digging Project.Call 48 hours or 2 working days before you dig.It's Fast, It's Easy and It's the Law in the state of Indiana! 309003060G2.5GRADING PLAN - NORTHEASTGRADING PLAN LEGENDEXISTING SPOT ELEVATIONMATCH EXISTING GRADETOP OF CURBBOTTOM OF CURBEDGE OF PAVEMENTFLOWLINETOP OF WALLEXISTING CONTOUR W/ ELEVATIONPROPOSED CONTOUR W/ ELEVATIONPROPOSED SPOT ELEVATIONPROPOSED CURB ELEVATIONAPPROXIMATE LIMITS OF CONSTRUCTIONMEGTCBCEPTCBC750.65FLTW1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONALLEGEND.2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWNWERE PROVIDED BY CEC CIVIL & ENVIRONMENTALCONSULTANTS DATED MAY 17, 2022. THE ENGINEER MAKES NOGUARANTEES THAT THE UNDERGROUND UTILITIES SHOWNCOMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER INSERVICE OR ABANDONED.3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THEPROJECT AREA INCLUDING UNDERGROUND UTILITYCONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITECONSTRUCTION. REPORT ANY DISCREPANCIES TO THEENGINEER.GENERAL NOTESSEE GRADING PLAN - SOUTHEAST - G1.4 (NOT IN PROJECT)1REGULATORY REVIEW1-18-20232TAC RESPONSE03-17-202335-5-2023TAC RESPONSE