Loading...
HomeMy WebLinkAboutC300 - Overall Erosion Control Plan - G3.0UP REF.23'-8 5 /8 "26'-6 3 /8 "23'-8 5 /8 "28'-0 3/8"20'-8"32'-7 5/8"20'-8 "175'-11 5/8"76'-0"26'-0 "76'-0 " 52'-8" 31'-10"18'-9 5/8"TBM#1 = 813.74TBM#2 = 809.81TBM#3 = 803.80FINAL PLAT OFARDEN TOWNHOMESINS T R . # 2 0 0 7 0 0 1 1 7 1LOT1201LOT1202LOT1203LOT1204LOT1205LOT1206LOT1207LOT 1301LOT 1302LOT 1303LOT 1304LOT 1305LOT 1306LOT 1401LOT 1402LOT 1403LOT 1404LOT 1405LOT 1406LOT 1701LOT 1702LOT 1703LOT 1704LOT 401LOT 402LOT 403LOT 404LOT 405LOT 301LOT 302LOT 303LOT 304LOT 305LOT 201LOT 202LOT 203LOT 204LOT 205LOT 101LOT 102LOT 103LOT 104LOT 105COMMON AREA "B"COMMON AREA "N"PRIVATE ALLEYCOMMON AREA "L"COMMON AREA "H"COMMON AREA "F"COMMON AREA "E"PRIVATE ALLEYPRIVATE ALLEY PROPERTY L INEPROPERTY LINE PROPERTY LINEPROPERTY LINEPROPERTY LINEPROPERTY LINEPROPERTY LINEPTCWSFSFSFSFSF SF SF SF 1PTCWSFSFSFSFSFSFSFSFFDCFDCFDCCONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTION LIMITSEXISTING DRY DETENTIONPOND - BMPAQUASWIRL XC-11(ON-LINE UNIT)AQUASWIRL XC-12(OFF-LINE UNIT)NATIVE VEGETATIONNATIVE VEGETATIONNATIVE VEGETATIONNATIVE VEGETATION"DO NOT SPRAY" SIGN"DO NOT SPRAY" SIGN"DO NOT SPRAY" SIGN"DO NOT SPRAY" SIGN"DO NOT SPRAY" SIGNGREYHOUND ACTIVITY CENTERSOUTH ENTRANCE BUILDINGSCOPYRIGHT 2022 BY FANNING/HOWEY ASSOCIATES, INC.WWW.FHAI.COMARCHITECTPROJECT NUMBER: 220136.00CARMEL STADIUMSOUTH SUPPORTBUILDINGCARMEL CLAY SCHOOLSE 136th St, Carmel, IN 46032PROJECT ISSUE DATE: 12.13.2022CONSTRUCTION DOCUMENTSDRAWN BY: ARS317.848.0966350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204REV.NO.DESCRIPTIONDATECONSULTANTPROJECT MANAGER: PMR19700317No.G3.0EROSION CONTROL PLAN -OVERALL80240080160SEE EROSION CONTROL PLAN G3.4(SOUTH SUPPORT BUILDINGS PROJECT)SEE EROSION CONTROL PLAN G3.5(GREYHOUND ACTIVITY CENTER PROJECT)SEE EROSION CONTROL PLAN G3.3(GREYHOUND ACTIVITY CENTER PROJECT)SEE EROSION CONTROL PLAN G3.1(SOUTH SUPPORT BUILDINGS PROJECT)SEE EROSION CONTROL PLAN G3.2(NOT IN PROJECT)1REGULATORY REVIEW1-18-2023SEE EROSION CONTROL PLAN G3.6(SOUTH SUPPORT BUILDINGS PROJECT)2TAC RESPONSE03-17-2023