Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutCorrespondence
\ .
i
Properties
November 22, 2002
, \
Mr. Jon C. Dobosiewicz
Planning Administrator
Department of Community Servict:)s
City of Carmel
One Civic Square
Carmel, IN 46032
~
-\\Icn
RfCt \, ~u ,
DOCS
Re: The Townhomes at Hazel Dell
Dear Mr. Dobosiewicz:
Pursuant to our November 21, 2002 meeting, Platinum Properties agrees to install a total
of twelve (12) trees within the Lake Forest Common Area located east of Pursel Lane.
Deciduous trees will have a minimum 2" caliper (but will not exceed 4" caliper).
Evergreens will be 6' to 8' high. The specific type of tree and location where planted
will be approved by Mr. Scott Brewer, Carmel's Urban Forester. The trees will be
planted prior to June 1,2003. Platinum Properties will also warranty these trees for a one
year period from date of installation.
The above commitment is contingent upon Platinum Properties receiving, prior to
February 1,2003, written approval and authorization from the Lake Forest Home Owners
Association to enter onto their property for the purpose of installing these trees plus any
other associated work for the referenced project.
S~~8~
Kenneth R. Brasseur, P.E.
'lice President
CC: Mr. Scott Brewer
317 818-2900. 317 818-2910 fax
9551 Delegates Row. Indianapolis, IN 46240
-r
. .~I-o~._i2;'~-_
. ~;./ '<Z'k:
.1~. l
'\ /
. 1-\, ,~~
--~,."1A':-- ~/"'" ..
-.,:';7/'-':;;---(,0... .
.-. ON ...
u u
City of Carmel
~
DEPARTMENT OF ENGINEERING
" ~\,-
! .
Mr. Dave Sexton, PE
The Schneider Corporation
12821 E. New Market St., Suite 100
Carmel, IN 46032
~
~~~~H'lf~{Q)
MAY 9 2002
DOCS
,,' \
:. -\
- \
"
May 8, 2002
-I
I'~.i
)
RE: The Townhomes at Hazel Dell Primary Plat-Review #1
Dear Mr. Sexton:
We apologize for the delay in responding to Keith Lash's letter and drawing dated Febrwuy 20, 2002. We
have now reviewed this primary plat and offer the following comments:
1. We have not received detailed construction plans for this project. Some of the comments made on
this primary plat will apply when we do receive detailed plans.
2. The north and south entrances will require acceVdecellane construction. In addition, the northern
entrance will require the construction of a left turn lane in the median of Hazel Dell Parkway to
accommodate northbound left turns from Hazel Dell Parkway into the development. We will
require detail including construction, landscaping, maintenance of traffic, etc.
3. As a reminder, we will not approve plans that include the verification requirement above the
engineer's certification.
4. Sheets PI0l and PI02. Where is the outlet for the run of sanitary sewer parallel to Hazel Dell
Parkway?
We will not have any additional comments until detailed construction drawings are submitted for review.
If you have questions, please call.
/JJ;Jdu
Dick Hill, Assistant Director
Department of Engineering
Cc: M. Kate Weese, City Engineer
Mike McBride, Assistant City Engineer
Jon Dobosiewicz, Department of Community Services
Laurence Lillig, Department of Community Services
John Duffy, Director Carmel Utilities
S:\PROJREV02\TWNHMHDPRI
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2441
j
w
u
CITY OF CARMEL
Department of Community Services
One CMc Square
Carmel, IN 4E032
(317) 571-2417
Fax: (317) 571-2426
-Fax
To:
~.:l '- h, bJ. Y
~, ~... ;J ~ ,0
From:
.~~
L{
4-\" -o~
Fax:
Pages:
Phone:
Date:
Re: ~..~~-a~ \),Q..
cc:
Cl Urgent
~" 'N'\QrC'\ ~ot)e... \'"
Cl For Review - tl P.lease Com e 0 Please Reply
o Please Recycle
'\\)I..~~
~~~
~~"t ~
I SC)~,
-.E:>..,.....~..- ~ tL ~
" ~ I , .
Properties
~~ ~
4'1f ~~~
l?'~
<JO/'l <tt?.?
viS' <
TO:
FROM:
RE:
DATE:
Plan Commission Members
Paul Rioux, Platinum Properties
Townhomes at Hazel Dell
April 16, 2002
We had a very interesting and productive Subdivision Committee meeting on Tuesday evening.
After almost 2 hours of discussion, including significant public, committee and staff input we
were able to arrive at a plan that received a 4 to 1 positive vote. Voting in favor of a plan with the
commitments described below and a reduction of density from 97 to 87 homes were Ron Houck,
Norma Meighen, Dan Dutcher and Linda Flanders. Wayne Haney was opposed.
Regarding our proposal, please consider that we have satisfied all Technical Advisory Committee
(T AC) issues, including DPW and Fire Department, have a strong positive recommendation from
staff and were previously given a 4-1 positive recommendation from the Subdivision Committee
(March meeting), before the question of proper notice was raised at the March Plan Commission
meeting. As requested, prior to the Subdivision Committee meeting on April 9, we re-confirmed
that all public notices were given properly.
This has been a long discussion, and for the sake of clarity, I have outlined the points that have
been agreed to through this process and confirmed them with the Department of Community
Development.
LAND PLAN - revisions based on public and committee input:
We have not connected our roadways to adjoining neighborhoods.
Reduced density from the maximum allowable 104 homes to 87.
Reduced the number of buildings from 20 to 16.
Eliminated four buildings - all on the south end of the site.
Have added over an acre of open park land to the south end of the site.
Have added numerous "off-street" parking spaces to accommodate guests of residents.
PRODUCT - expensive improvements to the architecture of the buildings
Added significant brick to almost every building.
Created offsets to emphasize individual home character of the buildings.
Committed to abide by additional Staff architectural recommendations.
Added shutters to the windows on the rear and side elevations of the homes.
Committed to no floodlights on the homes.
FINANCIAL CONCESSIONS to satisfy numerous requests of adjoining homeowners
Added over 400' of 10' wood fencing to extend existing fence
Agreed to clean up grade and seed common areas west and south (over 6 acres).
Agreed to provide easements or storm lines for continued water supply to LF lakes
317 818-2900. 317 818-2910 fax
9551 Delegates Row. Indianapolis, IN 46240
-.
Agreement with Scott Brewer to add landscaping on the LF side of the berm
Agreement with Scott Brewer to increase sizes of some of the landscape material
NORTH VS. SOUTH
There are 27 homes that directly abut the 6 acre "north property" with their rear yards, decks,
play areas, windows and porches directly exposed to the property in question. These residences
have no existing buffer and would lose a significant number of trees to see this area developed.
They obviously have been in favor of this plan. These residents live in both the Lake Forest and
Brookfield neighborhoods.
The residents to the south initially saw a plan that had 4 buildings in the southern 500' of the
property. They were concerned, and continually expressed their concerns about the density and
the view. After some discussions at their neighborhood meetings and at sub-committee we
eliminated two buildings, added fencing and landscaping and increased the separation between
the remaining buildings.
Prior to and during the Subdivision committee it was obvious the people on the south still were
not satisfied. As discussed above, after lengthy discussion Platinum Properties further agreed to
eliminate 2 additional buildings. This now gives us a plan with a large (over I-acre) park on the
southern portion of the site, enhanced with significant landscaping.
In conclusion, we feel the process that has been created by the Plan Commission has worked.
There has been lively debate and in the end a creative solution to a tricky site. As for the
fulfillment of this plan, Platinum Properties, has been involved in the development of literally
thousands of home sites in Carmel and Platinum Properties does what it says it will do. The
builder of this community, Ryland Homes, also has an excellent reputation and has enhanced it
with successful town home neighborhoods in City Center and Village of West Clay.
We respectfully ask for your support of this new neighborhood on Tuesday evening.
Sincerely
Paul Rioux
Platinum Properties
Alan Goldsticker
Ryland Homes
~~
Schneider
April 17, 2002
/~-::f\TI".1',);o '.-'
L \ \'-''':~1
f!i\"~:'- '. / I.]
'~y ~ .~\
h., ~~ ..,
i - . ~t~~ <<t~~1. Sj
1~-=1 Q \1 )~I
'\'-'\. ~~\" c~ /!J ::~
~~ ~!J ",_
\ )~
"'-:::>;.. .. :<'~/
"(~21J~
Jon Dobosiewicz
Department of Community Services
One Civic Square
Carmel, IN 46032
RE: TOWNHOMES AT HAZELDELL
Dear Jon,
Please fmd enclosed the following materials related to the Townhomes at Hazeldell:
2 copies of the Primary Plat (24"x36")
2 copies of the Primary Plat reduced to 11"x 17"
2 copies of the overall site plan on II"x 17"
The enclosed drawings have been revised to reflect comments made at the subcommittee meeting of April
9,2002 to include the deletion of the 2 most Southern buildings and relocation of the Southern entrance
Northward.
If you should have any questions, or are in need of additional information, please feel free to contact me at
your convenience.
Sincerely,
THE SCHNEIDER CORPORA nON
~~
Dave Sexton, P.E.
Director - Residential Development Services
N :\4k\4041 \00 1 \docs\dobosiewicz4.doc
~
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel. Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
I
u
u
CITY OF CARMEL
Department of Community Services
One Clvlc Square
Carmel, IN 46032
(317) 571-2417
Fax: (317) 571-2426
Fax
To> p~~ ~.C>uX
Fu: 8\~ - d. <:.), a
~~~
3
i-t'-O~
From:
Pages:
Phone: Date:
Re: \;>...p...,) ~~...,"..,.~ ~4-~ cc:
. Uc" ol. Q -c::> OL
D Urgent D For Review 0 P.Jease Comment
o Please Reply
o PJeaseRecycle
)s9-~,
~p
(
...- '-."..,
Q
o
CITY OF CARMEL
Department of Community SelVices
One Civic Square
Carmel, IN 4ED32
(317) 571-2417
Fax: (317) 571-2426
Fax
To, Q~,- ~'&>UX
Fax: gr~ -~ ,,) 0
Phone:
From: d 'N.....~
Pages: ~
Date: ~ - ~ --f.) ~
~~l>O' \J I ";.. c:...... \::)i"'t. CCl
VJ~oa.:, - &\ C\ b Ol...
o Urgent 0 For Review P.I ase Comment
o Please Reply
o Please Recycle
~L:~ ~-:
;:t:\:~_
IS9-<O\
~ ~ ~ \'"~
~~~~
\-o~~~~..~ ~
r.
I
'~,
u
u
CITY OF CARMEL
Department of Community SelVices
One Clvlc Square
Carmel, IN 4aJ32
(317) 571.2417
Fax: (317) 571.2426
Fax
To. )(/.\.>..... R. OL'l(
Fax: 8\ &- ~ ~, ~
Pages:
~~
~
S-c";l ~ "O'd--
From:
Phone:
Ilel~U ~ U,-.., ..",- 4bJo~
Date:
CC:
o Urgent D For' Review D P.lease Comment 0 Please Reply
Cl Please Recycle
~\... 1C..t>-. ~
~~-.
4\:-~. - 't;;~ - c!:) \ Y ~
\' ~~- a L.."LRL ~IS"L.L..
....
,'-
'''"-
~
o
<"
~
1"
CITY OF CARMEL
Dep~rtment of COnln1unity Services
One Clvlc SC{L1are
Carmet, IN 4S032
(317) 571-2417
F~ (317) 571-2426
'Fax
Tot PP,Ot- ~\ QIA.{
Fax: Cb\~- ~qlo
From5
~~~
~
~-f4-Dd-
Pages:
Phone: Date:
,~Re~ ~~,~ ~ ~..~ '~~t OCt
CI Ursent CI Far Review tl Please Comment Cl Please Reply Cl Please Heeycle
~~~-
A~~;; ·
. .
~ '1
" JS'l-Ci' ,~p
-
,\~~~~ .
~~
~ "'~h ~~
,,-,
,
l)
o
CITY OF CARMEL .
. Department of tommunity Services .
. " . ,
. -
One Civic SC{Uate
CQrmel, IN 4SJ32
(317)571-2417
Fax: (317) 571-242S
'Fax
TN \)"'~<.., R, ~^
Fax: 81&- ~ ',0
Phon~
From= c' ~~~~
Pages: ~
Date! a-'8 -<:::)~
Re= M~~, ~'I' 0 a ~CL .~_~ eel
[J Urgent [J For Review C Please Camment [J Please Reply C Please J:teeycle
~L...~ ~_G; ~....~~ -*:
3i
---- .
t~-O'
~-P :-\tS)~.~\l~Mii-=- ~
'l~~' ~L-i-
-Fax
To. \L~ ~,tJU'x
Fax: gt~- ~~, 0
7<:' .'...
Phone:
Q)
u
CITY OF CARMEL
Department of Community Services
One CMc Sct'JSre
Carmel, IN 4SJS2
(317) 571-2417
FalC (317) 571-2426
From=~~
Pages:
-
-:::>
.erS-Q ~
Date!
CCI
Re: I S C)...O l "'PP
CI Urgent [J Far Review [J Please Comment 0 Pll!:lase Reply
CI Please Recycle
fh-....s.
s
,
~(:) e ':::>-
0'T'-
A~
~i~ .-...
.~
u
CITY OF CARMEL
Department of Community Services
One Civic Square
Carmel, IN 4Sl32
(317) 571.2417
Fax: (317) 571.242El
Fax
T., ~j['~" L~ t.~
Fax: ~:l4' ~ ~q, 0
Phone:
F",... ~,--lJL
Pages: 5"
Datel::a- S -0 OL
Re:
CCI
1$'-0\ pp
[J Urgent [J For" Review [J P.lease Comment 0 Please Reply
CI Please Recycle
~~~~\
S d-~C d-
,
~... A..-fi><>(!.."f;
~------..~
~
~
u
~~
Schneider
March 4, 2002
Scott Brewer
Department of Community Services
One Civic Square
Carmel, IN 46032
\ 5"lJDl fX"
RE: The Townhomes at Hazel Dell
Dear Scott,
Please find enclosed a copy ofthe revised Landscape Plans for the above referenced project. These plans
have been revised per comments received at the February meeting ofthe Plan Commission Committee
meeting. I believe these plans conform to the requirements and requests set forth in prior meetings with
your department.
If you should have any questions, or are in need of additional information, please feel free to contact me
at your convenience.
Sincerely,
Keith Lash, P .E.
Project Manager
Enclosure
c.c: "3b.l P.
\\aum"_"ll 1j0""".14041\00 11d"""brewe<2.do< J1 (\, ~
~2-2002
THE SCHNEIDER CORPORA nON
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
~
o
~~
Schneider
January 30, 2002
Jon Dobosiewicz
Department of Community Services
One Civic Square
Carmel, IN 46032
RE: The Townhomes at Hazel Dell
;'
Dear Jon,
Please find enclosed a copy of the revised Landscape Plans for the above referenced project. These plans
have been revised per comments received at the January 14th meeting with your departmentr, Schneider
and Platinum Properties. I believe these plans conform to the requirements and requests set forth in the
meeting.
If you should have any questions, or are in need of additional information, please feel free to contact me
at your convenience.
Sincerely,
THE SC~ORATION
Keith Lash, P .E.
Project Manager
Enclosure
\\""''''_ nt I ,0b,\4kI4<)41\00 I ldoe'ldobo"'Wi"'..y1 (), ~
~~2-2002
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
-Fax
w
u
CITY OF CARMEL
Department of Community Seroiees
One Olvic Squsre
Carmel, IN 40032
(317) 571-2417
Fax: (317) 571-2426
To: ' A\),-
j
FaJC 8l8-~q,O Pages:
Phone: Date:
Re:' t:2 '''f.~ 0c eCI
tJ Urgent tJ For Review D P.lease Comment C Please Reply
tJ Please Recycle
VL..~~~-' ~
~7\:'"\; ~~~~ ~~~ "M~~
~~ ~.
L '5. 9 -<91 ~p - 'bW~"t--\cMr;;'~ ~-,
~---,
~E1..J-
~
J
.(j)
()
CITY OF CARMEL
Department of Community SelVices
One CMc Square
Cannel, IN 4SJ32
(317) 571-2417
Fax: (317) 571-2426
Fax
~~~ ~I E:>u.'x
.
To:
From:
~'N..~
~
,- Cls-P8--
Fax:
~ lS" ~C\ \0
Pages:
Phone: Datsl
Rs: . 0< Is-/a~ ~U'C'Ul"'6""" Cc\Y\' CCI
~'-" fto-' ~
CI Urgent CI For Review CI Please Comment
o Please Reply
o Please Recycle
~L-~
~\_'..
C?~
( ~ ~ - 0\ ~c;::> - ~-\-~~A~1"-~ ~\
~~~,,~ "C:~ ~
~~
Schneider
January 23, 2002
Jon Dobosiewicz
Department of Community Services
One Civic Square
Carmel, IN 46032
RE: The Townhomes at Hazel Dell
Dear Jon,
Please find enclosed a copy of the revised Primary Plat for the above referenced project. This plat has
been revised per comments received at the January 16th Technical Advisory Meeting. I have listed some
of the significant revisions that were requested below:
. Curb cuts onto Hazel Dell Parkway have been increased to 36' back-of-curb to back-of-curb.
. Emergency vehicular access drive to Lake Forest has been added.
. Internal roadways have been increased to have 20' of pavement north of the northern entrance
and south of the southern entrance and22' of pavement between the two entrances.
. Additional off street parking spaces have been added.
If you should have any questions, or are in need of additional information, please feel free to contact me
at your convenience.
Sincerely,
RPORATION
Keith Lash, P .E.
Project Manager
Enclosure
\\""""_ ntl \io"'l4kl404' 100 I \dO"ldObo';OWk"'.~ (). ~
~~2-2002
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
u
q
City of Carmel
Fire Department Headquarters
2 CIVIC SQUARE
CARMEL, INDIANA 46032
317/571~2600
Keith Lash, P.E.
Schneider Corporation
12821 E. New Market St. Suite 100
Carmel, IN 46032
1-
!RJ/gC/"f;on/Jr;"
JAA' '".JIY!f;;'@
~ 16 2002
\ -~:. DOcS / ;
\'/' , /e/'I
\., .. "" /',
\;':~(-)~r-l'--;-;:--<'\'-\~>/
", , I I, \--
~ ~..;....-"--
RE: The Townhomes at Hazel Dell
LETTER OF APPROVAL
The undersigned has reviewed the proposed plans for
The Townhomes at Hazel Dell
and has approved the plans subject to the following:
1. We are requesting the installation of cul-de-sac's at all stubbed streets in the project to allow our
apparatus to turn around without undo backing.
2. Our office is requesting a set of plans showing the water distribution showing fire hydrant
locations for this project.
3. Please find enclosed, a sheet showing turning radii for our apparatus. Our concern is with the
street widths at intersections being only twenty feet (20') our ladder will not be able to make the
turn onto the frontage road. Using these figures, please document that we will have adequate
turning radius to make turns in either direction of the frontage road.
4. The street in the project that runs north and stub's, is over the allowable length for a dead end
street or cul-de-sac.
5. Are these structures to be bricked or siding used on the exterior of the buildings?
6. Are these structures to be multi-story structures?
7. Will these buildings have a fire sprinkler system installed?
8. Are the streets in this project to be private streets?
Please respond to the above noted condition(s) in writing and submit to our office prior to the
scheduled Technical Advisory Meeting for this project.
Date: Januarv 10. 2002
By: Gary Hoyt, Fire Marshal
Carmel Fire Department
Fire Prevention Saves Lives and Property
.-'
~
Q
City of Carmel
January 15, 2002
Mr, Keith Lash, PE
TheSchnciderCo~rntion
12821 E. New Market St., Suite 100
Cannel, IN 46032
/',
/'- ,.
I{' ~
(</ ~
rl r [R]lIErc~JW~rQJ
~'~ JAN 16 2002
\;.\ DOCS
\/ \
"<
\ .
RE: The Townhomes at Hazel Dell-Project Review #1
Dear Mr. Lash:
We have reviewed the drnwings submitted for this project and offer the following comments:
GENERAL INFORMATION
1. The project site is located within current City of Cannel Corporate Limits.
2. Jurisdictions:
. Street and Right of Way - City of Cannel.
. Water, Sanitary Sewer, Storm Sewer - City of Carmel.
3. Board of Public Works and Safety Approval Requirements:
. Water and Sanitary Sewer Availability.
· Commercial Curb Cut. Please provide an exhibit that shows the location of the curb cut(s) and
acelVdecellanes if applicable; appropriate dimensions including drive width, overall width at the
street, acelVdecel dimensions, rndii, etc.; and location of existing opposing curb cuts, if applicable.
The exhibit should be 8 Y2 x 11 or of a size that can be reduced to 8 Y2 x 11 such as 8 Y2 x 14 or 11
x 17.
. Temporary Construction Entrnnce. Same requirements as for the Commercial Curb Cut.
. Consent to Encroach Agreements for any permanent improvement to be installed within dedicated
easements and/or dedicated right of way (including landscaping). If an irrigation system is
planned for this project, additional Water and Sewer Availability approval will be required from
the Board.
I am enclosing a schedule for Board of Public Works and Safety meeting dates and agenda deadlines
for your use. Please use the Engineering Department deadlines for submissions to the Board.
Any submission to the Board requires prior final approval by the Cannel Clay Plan Commission
and/or the Board of Zoning Appeals and completion of review by the Technical Advisory
Committee. AU written requests to be place on the Board's agenda must include the appropriate
Docket Numbers and the date (or dates) of approval by the Plan Commission and/or BZA.
4. This project will require IDEM permits for water mains and for sanitary sewers. The 330 lAC
Construction Permit will not be signed by the City Engineer until availability has been approved by the
Board of Public Works and Safety. Additionally, provide this office with signed, approved copies of:
. Notice of Intent to Construct a Water Main Extension
. Capacity Certification! Allocation Letter
5. Water and Sanitary Sewer Availability (acreage) and Connection Fees:
. Availability (acreage) Fees are based upon total acreage (legal description) @ $1,010.00 per acre
for water and $1,365.00 per acre for sanitary sewer. Based upon the legal description provided
with the preliminary drawing submitted for this project, the following would apply:
Water - 23.945 Acres @ $1,OIO.00/Acre = $24,184.00
Sanitary Sewer- 23.945 Acres @ $U65.00/Acre = $32.685.00
Totals 23.945 Acres @ $2,375.00/Acre = $56,869.00
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2400
.':;
v
o
Mr. Keith Lash, PE
January 15,2002
Page 2
. Connection Fees are based upon the average user factor tables from Section 9-35 (water) and 9-
200 (sanitary) of our Utility OrdinaI)ce. The Connection Fees are $1,310.00 per EDU for water
and $795.00 per EDU for sanitary sewer. Please provide this office with a listing of the proposed
buildings by building number and the number of one, two and three bedroom units in each
building. Multiply the total number of one-bedroom units by 0.54; the number of two-bedroom
units by 0.81; and the number of three-bedroom units by 1.00. The total of these multiplications is
the total EDU's. To arrive at the total Connection Fees, multiply the total EDUs by the
Connection Fee for water ($1,310.00IEDU) and sapitary sewer ($795.00IEDU).
I am enclosing copies of our Average User Factors for Water and Sanitary Sewers and our current
fee schedule. I have also highlighted the Average User Factors that apply to this development
Note: Any devimion from the Connection Fee calculations listed in our Ordinance will require
Carmel Utilities and Board of Public Works and Safety approvals.
6. T AC ReviewlDrawings submitted for approval:
We request that all comments and comment letters generated by this office be answered in writing and
be accompanied by a drawing reflecting requested revisions. Final drawings will not be approved for
construction until all issues have been resolved. All Cannel Utility issues must also re resolved. The
design engineer must certify all drawings submitted for final approval. This office will require a
minimum of five-sets of approved drawings after all issues have been resolved. The drawings will be
stamped approved and signed by both the City Engineer and Director Cannel Utilities. The
Developer/Owner will receive one-set which is to be maintained on the construction site at all times.
Cannel Utilities will receive two-sets. Our Public Works Inspector will receive one-set and one-set
will be maintained in the Department of Engineering. If more than five-sets are requested to be
approved, the additional sets must be submitted with the miriimum requirement of five- sets.
7. Be advised that any installation of signs, walls, irrigation systems, etc. within dedicated right of way
andlor dedicated easements will require a Consent to Encroach Agreement between the
OwnerlDeveloper and the City of Cannel. This Agreement requires Board of Public Works and Safety
approval.
8. Cannel Utilities does not subscribe to "Holey Moley" and should be contacted directly for all water
main and sanitary sewer main locations.
9. Cannel Utilities will provide a separate review of this project for water and sanitary sewer issues.
10. I am including copies of the following with this correspondence:
. Commercial/Subdivision Project Approval Procedures.
. Performance Release Procedure.
. Permit Data, Contacts, etc.
. Commercial Permitting Procedures.
I will send a copy of our Residential Subdivision and Commercial Irrigation System Requirements
upon request.
BONDING REQUIREMENTS
11. Upon initial review, it appears the following bonding requirements will apply to this project:
Performance Guarantees
· Exterior Street Improvements (all construction associated with the Hazel Dell Parkway curb cuts)
. Water Mains
. Sanitary Sewers
. Storm SewerslDrainage (if applicable)
. Sidewalks/Asphalt Paths (within dedicated right of way of Hazel Dell Parkway)
. Street Signs (at Hazel Dell Parkway curb cuts)
. Monuments & Markers (if platted)
~
u
Mr. Keith Lash
Janwuy 15, 2002
Page 3
Provide individual, detailed certified Engineers Estimates for 100% of the cost of labor and materials
for the above improvements. Post individual Performance Guarantees in the amount of the Engineer's
Estimates. TIrree-year Maintenance Guarantees will be required upon release of the Performance
Guarantees.
Street CutlRight of Way Permit and Bonding Requirements
Any work in dedicated right of way not covered by a Performance Guarantee will require a Right of
Way Permit and a License and Permit Bond. The bond amount will be determined by the number of
instances of work in the right of way (curb cut, storm sewer work, etc.) @ $2,000.00 per instance. All
open pavement cuts require Board of Public Works and Safety approval prior to start of construction.
PROJECT COMMENTS
12. Provide drainage calculations supporting the use of the existing pond for detention purposes. We
reserve the opportunity for further review and submission of comments regarding drainage upon
receipt of such calculations.
13. Since the streets in this development are to be private, it is our assumption that the storm sewer system
will be private. We will not accept the storm sewer system since most of the runs of pipe would be
along narrow private streets and not within dedicated easements.
14. Although the streets are to be developed as private, at some point in the future the City may be
requested to accept the streets as dedicated streets and right of way. This office would not be in favor
of such a request, due to many concerns, such as:
. It is our understanding that the street widths are to be 18-feet total. This office has received
numerous complaints about (public) frontage roads in other, recently developed subdivision,
which provided up to 20-feet from back of curb to back of curb. Even though the streets in this
development are planned to be private, the City will be forced to address any complaints once the
development is occupied.
. The plan provides for very little extra public/guest parking. When this parking (and the extra two
spaces behind the garage) is full, where will the overflow parking go? We would not want to
encourage parking along the narrow streets or in areas of right-of way along Hazel Dell Parkway.
. Snow plowing would be next to impossible. The streets and drives, although different materials,
do not have any separation between them and plowing the streets would block the drives. The
same goes for paving of any of these streets.
. We do not accept inverted crown designs. Experience has shown that there are both safety and
maintenance issues regarding this type of design.
. Public Safety Concerns - Even if the streets are private, how will trucks (particularly fire vehicles)
turn around in the northern and mid-section stub streets?
15. Provide a right of way pavement section for the portion of the curb cut(s) within the Hazel Dell
Parkway right of way that meets our pavement requirements. We are including a pavement section
from the Hazel Dell plans.
16. This office recommends that up to two curb cuts are justified for this development. One curb cut
would be located and aligned with the existing median cut on Hazel Dell Parkway at the Brighton
Woods Subdivision entrance which is located on the east side of Hazel Dell Parkway. The second curb
cut, without a Hazel Dell Parkway median cut, would be further south on Hazel Dell Parkway. This
office suggests the Developer work with our Parks Department in determining if any plans for the
future Founders Park have been developed to a point to determine where the entrance may be. This
would be the recommended location of the second curb cut. As proposed, the petitioner would have to
provide adequate justification to this office and the Board of Public Works and Safety in order to
warrant the three (3) curb cuts. Numerous curb cuts, while convenient for the development, are not
conducive to maintaining the overall continuity of the parkway, it's multi-use path and the landscaping
that was installed with the construction of Hazel Dell Parkway.
. ,
"
u
u
Mr. Keith Lash, PE
January 15, 2002
Page 4
17. Construction activities in the right of way of Hazel Dell Parkway are a sensitive issue. The roadway
and the multi-use paths are heavily utilized. Please be advised in advance, that the following
conditions would apply to any construction activities on Hazel Dell Parkway:
. The demolition of the existing multi-use path along Hazel Dell Parkway and the
relocation/reinstallation of the path must be coordinated to minimize the period of time the path is
not accessible to the public. It will be a requirement that each curb cut/asphalt path construction is
completed and the path reopened within two-weeks, weather permitting.
. Adequate signage will be required for path reconstruction activities, both north and south of the
construction activity at the proper, safe crossing locations.
. An approved traffic control plan will be required for the construction of the entrances and
acellldecellanes on Hazel Dell Parkway.
. The pavement of Hazel Dell Parkway must be protected during the construction of the entrances.
. The contractor(s) is to be notified that parking will not be permitted in the travel lanes of Hazel
Dell Parkway or in the dedicated right of way of Hazel Dell Parkway during construction
activities. Motor vehicles and construction equipment are not to park or drive on the asphalt path
at any time.
. Pavement markings for road improvements will be required, including lane striping for the
accelldecellanes and stop bars for the entrances.
18. You have indicated, on Sheets PI02 and P103, the existing Stub Street in the Lake Forest Subdivision
(Lake Pointe Drive) tenninating in a cul-de-sac. This cul-de-sac does not exist. Does this project
include plans to construct this cul-de-sac?
19. We reserve the right to provide additional comments when detailed construction plans have been
provided.
The above comments are based upon the Engineering Department's initial review. Please provide our
office with a follow up letter and revised plans, indicating all revisions. A second review will focus only
on revised items. It is critical that our office be made aware of all modifications made on the plans being
re-submitted, particularly if any such changes are considered "new" or fall outside of our initial review. If
you have questions, please contact Kate Weese, Mike McBride or me at 571-2441.
7J;j;L
Dick Hill, Assistant Director
Department of Engineering
Enclosures
cc: M. Kate Weese, City Engineer
Mike McBride, Assistant City Engineer
Jon Dobosiewicz, Department of Community Services
John Duffy, Cannel Utilities
Ken Brassier, Platinum Properties
S:\PROJREV02\TWNHOMATHDREVISED
u
Carmel
January 14, 2002
Keith Lash, P.E.
The Schneider Corporation
12821 E. New Market St., Suite 100
Carmel, IN 46032
RE: The Townhomes at Hazel Dell
Dear Mr. Lash:
u
,,6';>) 1
\'1 (AI. I",
" 'i;';Y' 'i..",= '
,', /. 'y'
I .,.::;- ~'
(::," ~ \~C)
/:c;/ ,ht~mi_ ~~~\
.~ J4N ijW{0 'f8
-\ ~l ,;,.1
Docs t/
/./
/..j
,.A(. .~'>/
I have received and reviewed the materials for the above-mentioned project.
At the present time, I see nothing in the plans that would hamper law enforce-
ment efforts.
If we can be of any further assistance to you, please contact us.
Respectfully,
~])..f-~
Michael D. FOga:]
Chief of Police
MDF:vb
cc: Dept. of Community Services
rcement Agency
Fu (317) 571.2512
(317) 571.2500
A Nationally Accredit
/"
u
u
~
CITY OF CARMEL
Department of Community Services
One CIVIc Square
Cannel, IN 4S032
(317) 571-2417
Fax: (317) 571-2426
Fax
Tm ~~ D,\~\
Fax: ~\~-~~,D
Phone:
\.
From: ~~l~
Pages: ~
Date: l - \, -0 d-
Re: \liii; ~ ~<L CCI
~.w,..~N"....w-, ~,
o Urgent [J Far Review [J P.lease amment 0 Please Reply
o Please Recycle
~~.
2-1; :
~
-
I S-~-U l
~~
~~
-=--- .
\ b~N~~""'~ .~
w
cj
Carmel Clay Schools - Continuing Excellence in Education
January 10, 2002
Keith Lash, P.E.
The Schneider Corporation
12821 East New Market Street, Suite 100
Carmel, IN 46032
l.-i
\)\
'(' >-.
~>""
\ '-~---"" '~'.
\ \ ~,~- '.
(~, v',
'/" '* \/" ,
? -~~ \~-'\
JAN 18 2002 )~i
DOCS l
Re: The Townhomes at Hazel Dell
Dear Mr. Lash:
Thank you for your submission of the above referenced project for review. I offer the
following comments:
1. Sidewalks should be provided for possible school age children to walk to bus
stops.
2. To facilitate safe school bus service of this project, we recommend adequate
space be allowed at the intersection of the main north-south street and the small
east-west spur to accommodate a school bus turn around. It appears that
access to the north and southbound lanes of Hazel Dell Parkway is limited to the
northern most project entrance. A turn around within the project will maximize
our options for routing school buses to this development.
If you have any questions, please feel free to contact me.
Sincerely,
Rollin E. Farrand, Jr., RA
Director, Facilities and Transportation
C: Mr. Lawrence Lillig
City of Carmel
Department of Community Services
One Civic Square - 3rd Floor
Carmel,IN46032
Facilities & Transportation Department - 5185 East 13rr Street, Carmel, IN 46033
317/815-3962 -Fax 317/571-4089
., ,"
January 10, 2002
In reply to: Docket # 159-01-PP
Carmel/Gay Plan Commission
Department of Community Services
One Civic Square
Carmel, IN 46032
~
~
· ~~ 10 2002
uocs.
.,.... \
~ .....\
\..-. ,
\ ~ . l
.
.. .
... . .....\
Attenti,on: Jon Dobosiewic2
Dear Carmel/ Clay Plan Commission:
SUBJECT: DOCKET # 159-01-PP
The Lake Forest Homeowners Association has an intetestin Docket # 159-01-PP on the
Commissioner's Agenda. Written Testimony on behalf of the Lake Forest community is as
follows:
1. Ground Water Level. Jones & Henry Engineers, Ltd. in an April 23, t 999 letter to Lake
Forest, Subject: Lake Forest Development Lakes notes a general decline in groundwater
levels in the vicinity of Lake Forest. The letter states that the City is concerned with the
impact that lower groundwater levels have on their well n0.16. The letter suggests the
potential of discharging portions of the storm water from Hazeldell Parkway and adjacent
developments into the Martin Marietta Lake adjacent to the North Lake. This would have
the benefit of recharging the ground water level in this area. The water level in City well
no. t 6, the Lake Forest North Lake as well as the lake of the proposed development is
direcdy related to the ground water elevation in this area. The only foreseeable resolution to
this problem is to mise the ground wa.ter in this area. Should this development, or 311Y other,
be approved, it would benefit the City, Lake Forest and the petitioner if the City Engineer
would include the discharge of storm water from Haze1dell Parkway into the petitioner's
lake. Petitioner has agreed to request this accommodation from the City Engineer.
Dewatering necessary for development would further lower ground water levels in this area.
Petitioner has agreed that any dewatering necessary during construction would direct the
discharge into one of the lakes rather than into the storm sewer.
2. Landscape and Mound Maintenance Easement. There is a boundary fence atop a 6.5
ft. tall and 40 ft. wide earthen mound along the east property me of Lake Forest. The
earthen mound includes a 20 ft. Landscape Greenbelt Buffer and Drainage Easement on the
Lake Forest side and a 20 ft. Landscape and Mound Maintenance Easement on the
petitioner's side.
Petitioner has acknowledged the Landscape and Mound Maintenance Easement and agreed
not to alter any portion of the earthen mound in any way that may disturb the stability of
the boundary fence. This prohibition will also be included in the Tow:nhomes at HlU:el Dell
Declaration of Covenants, Conditions, and Restrictions.
-2-
January 10, 2002
Petitioner has agreed to reserve an easement in the Townhomes at Hazel Dell Declaration of
Covenants, Conditions, and Restrictions for Lake Forest to retain access to the Landscape .
and Mound Maintenance Easement for upkeep and maintenance of the boundary fence.
Petitioner has agreed to include in the Townhomes at Hazel Dell Declaration of Covenants,
Conditions, and Restrictions a requirement to share equally with the Lake Forest Home
Owners Association, any expense related to the upkeep and maintenance of the boundary
fence.
3. Conservation Easement. The DNR Conservation Easement appears to appease those
who opposed the plan proposed by the previous developer. The Lake Forest Homeowners
Association Board of Directors has no objection to this notion.
4. Height of the Townhouses. Petitioner has agreed that the placement of outdoor
lighting at the Townhomes of Hazel Dell will ensure that Lake Forest residents will not
experience any glare from garage, security and/or any other lighting and that the height of
the Townhouses will not obstruct reasonable vision, light or air. Petitioner has agreed to
include in the Townhomes at Hazel Dell Declaration of Covenants, Conditions, and
Restrictions a continuing restriction on the placement of lighting.
5. Easement. The Lake Forest Homeowners Association Declaration of Covenants,
Conditions, and Restrictions require approval of two-thirds of the membeJ:Ship to transfer
or dedicate Common Areas to a public utility for such purposes. Provided such easement is
necessary, the Lake Forest Homeowners Association Board of DirectoJ:S will recommend
and seek such approval no later than the annual meeting to be held on the third Thursday of
March.
Respectfully,
Board of Directors
Lake Forest Homeowners Association
1-
u
u
CITY OF CARMEL
Department of Community SetVices
One Civic Square
Carmel, IN 4&X32
(317) 571-2417
Fax: (317) 571-2426
Fax
To. ~~'- ~,~X
Fax: ~ l~ 6>'l, D
Fro~ ~~_
Pages: 3
Phone:
Date:
., - I D->c:" "d--.-'
Re:
'S9-o'l ~-P
CCI
o Urgent
o For Review 0 Please Comment 0 Please Reply
o Please Recycle
.~
<
~
u
NELSON
&
FRANKENBERGER
A PROFESSIONAL CORPORATION
ATTORNEYS AT LAW
JAMES J. NELSON
CHARLES D. FRANKENBERGER
JAMES E. SHINAVER
LARRY J. KEJ\!PER
JOHN 8. FLATT
FREDERIC LAWRENCE
OF COUNSEL
JANE 8. MERRILL
3021 EAST 98TH STREET
SUITE 220
INDIANAPOLIS, INDIANA 46280
317-844-0106
FAX: 317-846-8782
January 7, 2002
'1-- 2.
$. "'>\ ~/'!.,)t';
~;. ~ >"
f'" ~V,."
-- \\~ ,
~;j JAN, ~)
lot:, 2002 j':r!
,.--:",
\\~-::~~ . .
''1'''\
~A", ,~>
~(?)..,. .-..<" of
'~I )-....~
'-~ / 9-
~-..:..~I
Sue Ellen Johnson
One Civic Square
Carmel, IN 46032
RE:
Platinum Properties
The Townhomes at Hazel Dell
Docket Numbers: 159-01 PP, 159-01a SW, 159-01b SW, 159-01c SW,
159-01d SW, 159-01e SW
Hearing Date: January 15, 2002 at 7:00 p.m.
Dear Sue Ellen:
Enclosed please find an Affidavit of Mailing, Proof of Publication in the Noblesville
Daily Ledger on December 21, 2001, and the green cards, which have been received to date.
Please call should you have any questions. Thank you for your help!
Kindest regards,
~LSON & FRANKENBERGER
~OflMJ
James 1. Nelson
JJN/kat
Enclosures
H:lKELL YIJIM NlPLA TINUM PROPERTlESITOWNHOMESIL TR2JOHNSON.OI0702.DOC
Fax
VA-:>~ ~\ ~l<
'8l~ a.9 ,0
To:
Fax:
Phone:
w
u
CITY OF CARMEL
Department of Community Seroices
One CMc Square
Carmel, IN 4e032
(317) 571-2417
Fax: (317) 571-2426
Fram~
~~~
.5""
I-q-o~
Pages:
Date:
Re: l-lc;-C";;).. ~~ ~,~~~ CC:
C1 Urgent 0 Far Review 0 P.lease Comment Cl Please Reply
CJ Please Recycle
~~~').
~ L-_~~ .:;;-
(f)
r- IL
~E"'Gi '" ~~E" ~. :
\
l~~~
~~~~""~ ~
IS' 4:)\ ~.~
. :..'> . "':" '.'
01/09/2002 09:36
'"
......
HAMILTON CO USDA.,.
. U
" "
PAGE 01
,.' ':
,
'.'
, .' . , ~.
3i7.7:1~.t1.P. ;:' :.
Fta,"3I7.7t~li'!I: '.' .".
,,'. .,'
" " .
('0\ sf. HV.\ Tl (1:\ 1)1:,> TRh T
...
, . '. :';:. ,(, ~:.' ..':., Jaii~.:9, 20.02 ',:'
'." . ~, .. . ", :: ' . ::'. ',': ~:',' .
.. . : ';,:>::' M1:.'.Paul'Rioux : ." .
':- ,': " ,. Platin\XQl"Develop'~enl .
>9551 D~lega~es Row'.:
...' 11l~~polis, ,IN:"46240 .'
. . .
- ' . .
" ......., ,': .:, ',. .' '.
:::\.::.'" " . ':.'~': >;:'.R~:'j'he'Town H~es'~t ~azel Dell Primary
." ....,..',., ", .,' .
, ..' .. "
"'. ..Dear ~;: iu~Ux:" ::
.... '.
'\'\ .
", ,'..'
, .
" .,'
'" -.
. . '. "...'
. ,',
1108 South 9tb Street · No.b.esvil1e · IN io 4606().:'3:745
. . .
"',' , .
.' .
,':
---<\1}2J~j!~.:', '..
/:.C{,~v <!.::[~ ' "
((y~ ~; "-:~~\:,:.,:;o:.
':J r -~ '. \'~\,:"',::
=l . JAN , ~" i"~':!~.:.,::
.. eVll2 . --I .
, \' ..A ""..... .' ..' j-..;" :',
. .---\. ~'S '.' /";' ""'."
\.~>\ ' .>I.,:~/,":','.::
~> /':,',::.:,
".JJ.:ZT" :~ '/.' ',.:':, ..::.:
.. .
':".."'.-,,
. ,,,.:
, .'\',
H", '.
. . ~ ..' . ,
, ,
, .' ' :' I ~8.ve ~e~ed ~e p~s far this primary plat and have the following comments:
:.', '.':
... .. .
. ,'.
".
.. .
.\ '.'
'.' .
. ,'.:~. ..'
, ','
, '.;'
.... I.,
.... .
. ... '.'..'
'" .
, ..' ~.\ I ".
, :'
',',,". .... '
,. :
,'.
, .
. ,
..'
,.
,,', .',
..
. '.'
", :..
"
,.. ~.
. ' ~,
. : .
. "
,."., ..,.,
~". . 't
" "
. '..
,
'.
. , ~',. ::" .
. , .t.
. .",", '.
I". '.
..,. TheVSD4,.NRCS:SOil,Surv~y of Hamilton',County shows this site to have an
. Orth.e~ts soil tYPe. This soil is an 'unknown mixture of cuts or fills. The soil. '
biate~ial e,ould, be poorly compacted with many voids, or have organic debris' .
bUried b~ath 'that could cause settling in the future. The material may also be'
weli~compac~ fill that is s~table for this project. I recommend that a soils .
'it1vestigation be conduc.ted to make sure that the soil conditions are suitable for
th~ ~ropo.sed prQje,~t , .
: ,:'. .1:here.:ares.ev~a1 housing deVelopments on the east side of Cannel that have
<" 'pOnd's'with loW water levels because of poor soil conditions or a dropping water
, Uible. 'PIUm Creek North, Lake Forest, Haverstick and Sprjng Creek are .an
, . d~eiQpments 'that l'1ave ,or had pOnds with a lowered water level. These
.' 'h9m~:wners purch8.sed .lots with the expectation of a nice pond and have
, some1:l.ting lesS, than that. C~ges in the ground water table that affected these
.~ . developments, '~us~ now be anticipated so future lot owners'are not left with a
:smul8t probJe:tn. TIle batiks for this existing pond need to be stahle, safe and free
o.f soil erosiori..whe~ the:wate.t elevation is high or low. The developer needs to '.
'iiss~ how'much the water elevation is likely to change and provide a plan to
,pl:oteCt the: pon~ banks..' .
,,",.'
'"
:",.:.\.,"
. ". ...
'."
"
. " .
, ,"".'
, '.
.... "
, '
. . .
'. The plan' does. ~ot shovV'a dr~g~ outlet for the existing pond. To limit the
uppact of this pl'oj~t on the.adja;eent pond in Lake Forest, the outlet should be .
equal'to o:fab~ve ~e elevati~n of the adjacent pond in Lake Forest.
. " , .:
, " , "
~ '..;:
. '.' .'
, .
,.. '1:h* has 'beex{:discussion about routing the Hazel Dell storm sewer to discharge
int-o.tJle e:?ris~ pit. I don't know if this is feasible, but it would add additi<mal
Wate<: to a pond that needs it and help recharge the aquifer,
. ,
. "
. '",'
.... "!,"'" .
. ,", CO~SERVA1'IO~ ~DEVEI.;OPMENT ~Sf3LP-QOVBRNMENT
, ' " ' . . ~~ eQUAl. OI'l'ORTUNITY 1;MPl.0YIlR"
. ".'
j. . ..
.... '.'.
,',' ::.~,~I~:Y2~~2 ,.09:36" . 317~~7U~1
, ",
HAMILTON CO USDAW
. '.
.,'., ',.
, '.
I;."
..,' " ,"
. :," " ..
. ,
~ . "'. I',
""'''''. ..
. . : I .' . . ~ :. , .': .
" '.. ':, .,,'
" " ."" '.:'..
, ,
" " I
" :
. ".. . ',.
,::',', ". ,"
, , "
(.
, .' "
. ,. .,'. '.
:. : ,,',
',' .
.,' .. I believe'a.404 w at~ Quality pennit from IDEM may be required before the
shoreline caD be altered or improved.
.' .
',",
. ,."
, " "
_," What is the intended use for Open Space A? A plan is needed and what
cliim$eslimprov~meDts ate required for the proposed use.
"', I
", '" "
., .','
. ,
.. < \"" .,.
.' The pr(jpos~ street behind buildings 3,4 & 5 overlaps the existing mound. How"
'Will thi's cotiflict be ~solved1 Is there an easement for the mound?
::.'
. ,
.'. . ' .
".. ,",
" "
. " ~
" " j" '"
'. ,/ :',' :' : ,,~hqllld.You ha,ve questions,conce~ these comments, please contact me.,
. ,
". '
....~.:.. .:. :-.Sin~iY~ :.:.
. .... ."~'l:1!4-
", ....::' " /j~bii B. ~~Uth: ,,'
'. : :
, ",
,: Cc: ..'.:: J~n Dobosiewi~z
, "Keith Lash'
File. ,
,.., .
, "
': ,;'
. .. /.".
.. '!I
'::,'
. ~ :"
., ',~'
"
, ','
, ., ' ,'. .' .
'. .:.'.'
.. ,., , ""'~.'
. ", ""
..' " . ~ .:
: ': .,,'
" . I.' .
':.
",.,
, .. '~~
,"
.'. ',.
"
PAGE 02
.)
, ........
....
'. ,. ~..
I .
, ,. t
",:'. /'
. .
:.. \
.' "
,. ':.
. '.' ",
. ,',' "
.' . ..'w
" '
.'
.. , .,' .'
" ,
. ,.'
. ,..... .
....
: . ':.~
", ..:......
, ' .,
. "
.~ t "
....
".'
'1 ",
" .
t ' .';.
'. "
'. .' .',
:,,'
..
. ".
,:.' "
u
u
iewicz, Jon C
Cc:
Subject:
Jay Alley [Jay@ctrwd.org]
Tuesday, January 08, 2002 1 :47 PM
rfarrand@ccs.k12.in.us; AKeeling@cLcarmel.in.us; CTingley@cLcarmel.in.us;
DHill@ci.carmel.in.us; DPattyn@cLcarmel.in.us; Ghoyt@ci.carmel.in.us;
GStahl@cLcarmel.in.us; JDobosiewicz@ci.carmel.in.us; JKendall@ci.carmel.in.us;
JLester@ci.carmel.in.us; JPFoster@ci.carmel.in.us; KHahn@ci.carmel.in.us;
LLillig@ci.carmel.in.us; MFogarty@ci.carmel.in.us; MHollibaugh@ci.carmel.in.us;
MMcBride@ci.carmeJ.in.us; PMorrissey@ci.carmel.in.us; PPace@ci.carmel.in.us;
RAuler@ci.carmel.in.us; RHancock@ci.carmel.in.us; SBrewer@ci.carmel.in.us;
SJohnson@ci.carmel.in.us; slillard@ci.carmel.in.us; W Akers@ci.carmel.in.us;
sprater@cmsenergy.com; sjb@co.hamilton.in.us; stc@co.hamilton.in.us; john-
south@iaswcd.org; CShupperd@vectren.com
Candy Feltner; klash@schneidercorp.com; rlauritsen@slmaco.com
Re: January 16th Carmel/Clay TAC
Thanks Jon:
~None of the three projects on your revised agenda are served by the District so we will
~have no comments for this TAC meeting. Let us know if the agenda changes again!
Thanks-
Jay
Jay W. Alley, Utility Manager
Clay Township Regional Waste District
Hamilton County, IN, USA
http://www.ctrwd.org/
317-844-9200 (phone)
317-844-9203 (fax)
>>> "Dobosiewicz, Jon C" <JDobosiewicz@ci.carmel.in.us> 01/08/02 12:36PM >>>
TAC Members,
My apologies, I have one additional item to add to the TAC Agenda for the
16th of January. Seeing the ag~nda is now only a total of three items it is
not a record for the fewest items.
The additional item is the Townhomes at Hazel Dell (formerly Hazel Dell
Pond). Same site, different plan, somewhat a work in progress.
It is within the City limits so Steve Broermann with Highway and Steve Cash
still don't have to worry.
Please find the revised agenda attached:
<<TAC2002-0116revised.rtf>>
Keith Lash with Schneider will be distributing plans today to the TAC
members.
Again, sorry for the delay and any inconvenience.
Thanks,
Jon C. Dobosiewicz
Planning Administrator
Department of Community Services
City of Carmel
One Civic Square
1
\.,.
i........
u
o
Dobosiewicz, Jon C
From:
Sent:
To:
Cc:
Subject:
Weese, Kate K
Tuesday, January 08, 2002 10:09 AM
Dobosiewicz, Jon C
Hill, Dick B; Hollibaugh, Mike P; Lillig, Laurence M; McBride, Mike T
The Townhomes at Hazel Dell- Dept. of Engineering Comments
John - I am aware that the above project goes before the P.c. Committee meeting tonight. I did meet with Keith Lash,
Paul Rioux, and one other gentleman (can't remember his name) on Friday morning last week. I want to provide you with
the following comments regarding that project. Also, in case it is still possible to require them to do so, I would like to
put in my recommendation that this project go to TAC again, as I really feel both the layout/design and change of
density/use have substantially changed since the previous project (Hazel Dell Pond) was reviewed. I am slightly
concerned with the volume of traffic generated by 99 units (2-car garages each) onto private streets only 18 feet wide.
This seems like a high generator onto Hazel Dell.. ..Anyway, my comments include:
. Generally, drainage should not present a problem, as I believe both this and the previous project could illustrate
adequate capacity in the existing pond, or with minimum modifications necessary. I would NOT want to see the
storm sewers be the City's (within easements) since most of the runs of pipe would be along the narrow, private
streets.
. I don't think they have the utility connections worked out yet. They are not clear on where they can bring in
sanitary, although they have about three different directions to go, there are easement deficiencies and/or pavement
cuts that may be required. These really need to be clear before approval would be able to be given.
. The private streets are problematic, in that although they are to be developed private, they may eventually be
requested to be taken over by the City and I would NOT be in favor of that. This is due to many concerns:
(1) Although the drawings show 20', I was told the widths of the streets were to be 18'; we have already had
numerous complaints about the (public) frontage road in Plum Creek Farms, and I believe we were able to cause
modification from the original proposed width to enlarge the widths to 20'. Even though they are private, we may
get complaints. AND, we may be forced in the future to take them on as City streets.
(2) The plan provides for very little extra public/guest parking. When this parking (and those extra 2 spaces
behind the garage) is full, where will overflow parking go? I hate to think anyone would park along the road or in
grassy areas along Hazel Dell. I believe more parking for guests should be provided.
(3) Snow plowing would be next to impossible. The streets and drives, although different materials, do not have
any separation between them and plowing the roads would block in the drives. The same goes for paving any of
these streets.
(4) Inverted crown - we do not accept the inverted crown designs. Experience has shown that there are both
safety and maintenance issues regarding this type of design. I would not want to set any precedence by beginning
to accepf this type of design.
. Public safety of the private streets - Even if private, how will trucks turn around in the northern and mid-section
stub streets? I do not have the exact widths and what the Carmel Fire Department can maneuver, but I would make
sure the Fire Department has reviewed this layout/design for approval.
. Multiple curb cuts onto Hazel Dell. I did discuss this with the developer and engineer. For the Hazel Dell Pond
development, I believe only one curb cut was to be provided, at the location of the current median cut. I understand
that at first, an additional three (3) cuts were proposed, which has been reduced to two (2). I think only ONE
additional curb cut, without a median cut, would be justified. And this is only based upon the plan showing 75 units
south ofthe median cut entrance. This means up to 150 vehicles at full capacity, not counting guests. As I am aware
of the extreme sensitivity to additional curb cuts on Hazel Dell (and the obvious opposition to any new median cuts) I
would like to discuss this with the Mayor and the other Board of Public Works members to verify their concurrence.
Additionally, I would like them to work with the Parks Department in determining if any plans for the future
Founders Park have been developed far enough to determine where the entrance may be. This would be where I
would recommend that second curb cut be located across from.
. Encroachments into the Hazel Dell RW - I am aware that there may be numerous requests to have additional
amenities located within the existing RW of Hazel Dell. This may include landscaping, lighting, signs, paths/group
sidewalks, irrigation system. All of these would have to be reviewed and included within a Consent to Encroach
1
'. - u u
- agreement prepared by City Legal and signed by our Board of Public Works.
Without additional time and full review, this is all I have for you on this project at this time. I hope this will help in your
efforts with the committee tonight. Thanks.
Kate
2
u
r.)
~~
Schneider
tf~r-;~-
\ '
""- :-
',> :f,1
~Y!'R[, ::(,
~l JAIl CElvffJ
Ii 2()Ql
DoCS .
;\
~>>~
~
-\
i
January 8, 2002
Jon Dobosiewicz
Department of Community Services
One Civic Square
Carmel, IN 46032
RE: The Townhomes at Hazel Dell
Dear Jon,
Please find enclosed the following materials related to the above referenced project being proposed by
Platinum Properties along Hazel Dell Parkway:
1. 2 sets of the Landscape Plans
2. Copies ofletters to TAC members
The above referenced materials are for your review and suggestions with respect to Primary Platting. It is
my understanding that this matter will be on the agenda of the January 16,2002 Technical Advisory
Committee meeting. In the interim, if you should have any questions, or are in need of additional
information, please feel free to contact me at your convenience.
Sincerely,
Enclosure
1"""'''_ nt I liob,I4k\404I\OO I \dO"\dObo'i<Wi"-~ (). ~
1W'~2-2002
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317--826--8410
www.schneidercorp.com
u
u
~~
Schneider
C, I
\'
~.,\/
''1'/ Jt
~ RtCtNt~~
. ~~,,? 1\N
t)oCS
January 8, 2002
Gary Hoyt
City of Carmel Fire Department
Two Civic Square
Carmel, IN 46032
RE: The Townhomes at Hazel Dell
Dear Gary:.
Please find enclosed one copy of the Primary Plat for the above referenced townhouse project
being proposed by Platinum Properties along Hazel Dell Parkway. We will be presenting this
project at the January 16,2002 meeting of the Carmel Technical Advisory Committee. Would
you please review the enclosed material and for ward to me, any comments or concerns that you
may have.
If you have any questions or require additional information, please feel free to contact me at your
convemence.
Sincerely,
ORATION
Keith Lash, P .E.
Project Manager
Enclosure
''''''''<1_ nt1\job,I4k\404l\OOtld",,',,",nb.doo A n. ~
~~2-2002
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
o
w
~.,
Schneider
January 8, 2002
Bill Akers
Carmel/Clay Communications
31 First Avenue, N.W.
Carmel, IN 46032
RE: The Townhomes at Hazel Dell
Dear Bill:
Please find enclosed one copy of the Primary Plat for the above referenced townhouse project
being proposed by Platinum Properties along Hazel Dell Parkway. We will be presenting this
project at the January 16,2002 meeting ofthe Carmel Technical Advisory Committee. Would
you please review the enclosed material and for ward to me, any comments or concerns that you
may have.
If you have any questions or require additional information, please feel free to contact me at your
convemence.
Sincerely,
Keith Lash, P .E.
Project Manager
Enclosure
'\<,rm'U.t1\iob,'4k\404I\OO I ",,,,,,Ita,,.b.d., /1 (), ~
1W~2-2002
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-82~410
www.schneidercorp.com
v
o
~~
Schneider
January 8, 2002
Ron Farrand
Carmel/Clay Schools
5201 East 13151 Street
Carmel, IN 46033
RE: The Townhomes at Hazel Dell
Dear Ron:
Please find enclosed one copy of the Primary Plat for the above referenced townhouse project
being proposed by Platinum Properties along Hazel Dell Parkway . We will be presenting this
project at the January 16,2002 meeting ofthe Carmel Technical Advisory Committee. Would
you please review the enclosed material and for ward to me, any comments or concerns that you
may have.
If you have any questions or require additional information, please feel free to contact me at your
convemence.
Sincerely,
Keith Lash, P .E.
Project Manager
Enclosure
II=m"_ otl \;0""4k\4041\00 11d""''''''''b.doo A (l ~
--rw~2-2002
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
~
u
~~
Schneider
January 8, 2002
Dave Klingensmith
City of Carmel Street Department
21 Second Street S.W.
Carmel, IN 46032
RE: The Townhomes at Hazel Dell
Dear Dave:
Please find enclosed one copy of the Primary Plat for the above referenced townhouse project
being proposed by Platinum Properties along Hazel Dell Parkway . We will be presenting this
project at the January 16,2002 meeting of the Carmel Technical Advisory Committee. Would
you please review the enclosed material and for ward to me, any comments or concerns that you
may have.
If you have any questions or require additional information, please feel free to contact me at your
convemence.
Sincerely,
THE SCHNEIDER CORPORATION
Keith Lash, P .E.
Project Manager
Enclosure
1\omn'L ntl \iob,I4k\4041Ioo I "'""I"""'b.do, J1 n ~
~2-2002
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
~
January 8, 2002
Michael Fogerty
City of Cannel Police Department
Three Civic Square
Carmel, IN 46032
RE: The Townhomes at Hazel Dell
Dear Michael:
o
~~
Schneider
Please find enclosed one copy of the Primary Plat for the above referenced townhouse project
being proposed by Platinum Properties along Hazel Dell Parkway. We will be presenting this
project at the January 16,2002 meeting of the Carmel Technical Advisory Committee. Would
you please review the enclosed material and for ward to me, any comments or concerns that you
may have.
.~
If you have any questions or require additional information, please feel free to contact me at your
convemence.
Sincerely,
Keith Lash, P .E.
Project Manager
Enclosure
1",,",<1_ntl ljob,\4kI404l\00 11d""1,,,..b.doo /1 (). ~
~~2-2002
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneldercorp.com
CD
u
~~
Schneider
January 8, 2002
John Lester
Carmel/Clay Parks Department
1055 3rd Ave. S.W.
Carmel, IN 46032
RE: The Townhomes at Hazel Dell
Dear John:
Please find enclosed one copy of the Primary Plat for the above referenced townhouse project
being proposed by Platinum Properties along Hazel Dell Parkway. We will be presenting this
project at the January 16,2002 meeting of the Carmel Technical Advisory Committee. Would
you please review the enclosed material and for ward to me, any comments or concerns that you
may have.
If you have any questions or require additional information, please feel free to contact me at your
convemence.
Sincerely,
ORATION
By:
Keith Lash, P.E.
Project Manager
Enclosure
\","",1_ ntlljo"'\4k\4041 \00 1 \do,~"",ub.doc 11 (), ~
~~2-2002
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
o
o
~~
Schneider
January 8, 2002
Rick McClain
Cinergy
1441 South Guilford
Carmel, IN 46032
RE: The Townhomes at Hazel Dell
Dear Rick:
Please find enclosed one copy of the Primary Plat for the above referenced townhouse project
being proposed by Platinum Properties along Hazel Dell Parkway. We will be presenting this
project at the January 16,2002 meeting of the Carmel Technical Advisory Committee. Would
you please review the enclosed material and for ward to me, any comments or concerns that you
may have.
If you have any questions or require additional information, please feel free to contact me at your
convemence.
Sincerely, .
THE SCHNEIDER CORPORATION
By:
Keith Lash, P .E.
Project Manager
Enclosure
\\cannel_ ntl \jobs\4k\4041 \00 I \docs\tacsub.doc
~
THE SCHNEIDER CORPORATION
12821 E. New Mar1<et Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-82EXl410
www.schneidercorp.com
CD
o
January 8, 2002
Jeff Rice
Ameritech
5858 North College Avenue
Indianapolis, IN 46220
RE: The Townhomes at Hazel Dell
Dear Jeff:
Please find enclosed one copy of the Primary Plat for the above referenced townhouse project
being proposed by Platinum Properties along Hazel Dell Parkway. We will be presenting this
project at the January 16,2002 meeting of the Carmel Technical Advisory Committee. Would
you please review the enclosed material and for ward to me, any comments or concerns that you
may have.
If you have any questions or require additional information, please feel free to contact me at your
convemence.
Sincerely,
Keith Lash, P .E.
Project Manager
Enclosure
II=n"_ "tI\jobMkl404lI00 1\d""I""'ob.do< A (), ~
1W"~2-2002
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
~
o
~~
Schneider
January 8, 2002
Tim Gibson
Time Warner Cable
516 East Carmel Drive
Carmel, IN 46032
RE: The Townhomes at Hazel Dell
Dear Tim:
Please find enclosed one copy of the Primary Plat for the above referenced townhouse project
being proposed by Platinum Properties along Hazel Dell Parkway. We will be presenting this
project at the January 16,2002 meeting of the Carmel Technical Advisory Committee. Would
you please review the enclosed material and for ward to me, any comments or concerns that you
may have.
If you have any questions or require additional information, please feel free to contact me at your
convemence.
Sincerely,
By:
eith Lash, P .E.
Project Manager
Enclosure
\\cannel_ nt 1 \jobs\4k\4041 \001 \docs\tacsub.doc
~~
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-82&6410
www.schneidercorp.com
'-J)
'-~
Schneider
Q
January 8, 2002
Kate Weese
City of Carmel Engineer's Office
One Civic Square
Carmel, IN 46032
RE: The Townhomes at Hazel Dell
Dear Kate:
Please find enclosed one copy of the Primary Plat for the above referenced townhouse project
being proposed by Platinum Properties along Hazel Dell Parkway. We will be presenting this
project at the January 16,2002 meeting of the Carmel Technical Advisory Committee. Would
you please review the enclosed material and for ward to me, any comments or concerns that you
may have.
If you have any questions or require additional information, please feel free to contact me at your
convemence.
Sincerely,
THE SCHNEIDER CORPORATION
Keith Lash, P .E.
Project Manager
Enclosure
'''rom'' _ ntl\iobMk\4041 \00 I "''''''Ioomb.doc A (), ~
1W~2-2002
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneldercorp.com
o
Q
~~
Schneider
January 8, 2002
John South, P.E.
Hamilton County Soil & Water Conservation District
1108 South 9th Street
Noblesville, IN 46060
RE: The Townhomes at Hazel Dell
Dear John:
Please find enclosed one copy of the Primary Plat for the above referenced townhouse project
being proposed by Platinum Properties along Hazel Dell Parkway. We will be presenting this
project at the January 16,2002 meeting of the Carmel Technical Advisory Committee. Would
you please review the enclosed material and for ward to me, any comments or concerns that you
may have.
If you have any questions or require additional information, please feel free to contact me at your
convenience.
Sincerely,
eith Lash, P.E.
Project Manager
Enclosure
\ \carmel_ nt 1 \i obs\4k\4041 \001 \docs\tacsub.doc
~~
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel. Indiana 46032 317.569-8112 Fax 317-82fXl410
www.schneidercorp.com
o
u
~..,
Schneider
January 8, 2002
Chuck Shupperd
Indiana Gas Company
16000 Allisonville Road
Noblesville, IN 46060
RE: The Townhomes at Hazel Dell
Dear Chuck:
Please find enclosed one copy of the Primary Plat for the above referenced townhouse project
being proposed by Platinum Properties along Hazel Dell Parkway. We will be presenting this
project at the January 16,2002 meeting of the Carmel Technical Advisory Committee. Would
you please review the enclosed material and for ward to me, any comments or concerns that you
may have.
If you have any questions or require additional information, please feel free to contact me at your
convemence.
Sincerely,
Keith Lash, P.E.
Project Manager
Enclosure
lloannet nllyo"'\4k\404IIOO 1 "'''''''''''"b.d"" A (), ~
~~2-2002
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.5chneidercorp.com
u
u
~..,
Schneider
January 8,2002
Jeff Kendall
City of Carmel
One Civic Square
Carmel, IN 46032
RE: The Townhomes at Hazel Dell
Dear Jeff:
Please find enclosed one copy of the Primary Plat for the above referenced townhouse project
being proposed by Platinum Properties along Hazel Dell Parkway . We will be presenting this
project at the January 16,2002 meeting of the Carmel Technical Advisory Committee. Would
you please review the enclosed material and for ward to me, any comments or concerns that you
may have.
If you have any questions or require additional information, please feel free to contact me at your
convemence.
Sincerely,
Keith Lash, P .E.
Project Manager
Enclosure
,"'""" - ntl~ob,'4k14041\OOl\d""\ta,,,"b.do' A (), ~
~~2-2002
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
u
Q
~~
Schneider
January 8, 2002
John Duffy
Carmel City Utilities
One Civic Square
Carmel, IN 46032
RE: The Townhomes at Hazel Dell
Dear John:
Please find enclosed one copy of the Primary Plat for the above referenced townhouse project
being proposed by Platinum Properties along Hazel Dell Parkway. We will be presenting this
project at the January 16,2002 meeting of the Carmel Technical Advisory Committee. Would
you please review the enclosed material and for ward to me, any comments or concerns that you
may have.
If you have any questions or require additional information, please feel free to contact me at your
convemence.
Sincerely,
THE SCHNEID R CORPORATION
e:-
eith Lash, P .E.
Project Manager
Enclosure
\""",',~ oU ljob,\4k\404I\OO I ldoe<Ita<,ub.doc 11 (), ~
~~2-2002
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
u
January 8, 2002
Scott Brewer
Department of Community Services
One Civic Square
Carmel, IN 46032
RE: The Townhomes at Hazel Dell
Dear Scott:
u
~~
Schneider
Please find enclosed one copy of the Primary Plat and Landscape Plans for the above referenced
townhouse project being proposed by Platinum Properties along Hazel Dell Parkway. We will
be presenting this project at the January 16,2002 meeting of the Carmel Technical Advisory
Committee. Would you please review the enclosed material and for ward to me, any comments
or concerns that you may have.
If you have any questions or require additional information, please feel free to contact me at your
convemence.
Sincerely,
Keith Lash, P .E.
Project Manager
Enclosure
''''"''''_ ntl ~ob,\4k\404l\OO IId"""ta"ob.do, .If (), ~
~~2-2002
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
.W
o
, ;;,
~
CITY OF CARMEL
Department of Community Services
One Civic Square
Carmel, IN 4E032
(317) 571-2417
Fax: (317) 571-2426
Fax
To: ?t\U &.-
From:
Fax:
Pages:
Phone:
Date:
t ~-d..~-!.:J\ .
Re: ~~~Q\ ~\....,t:I~ \-~:"~d.... CCs
o Urgent 0 For Review 0 P-Iease Comment 0 Please Reply
CI Please Recycle
~'-~
~~
~ ~..,
~.y.,...-;--- ,
.-'
\ sq - 0 1
~ p \c,u.> ....1;"........,. ~ ~b~ .~
""
JAMES 1. NELSON
CHARLES DFRANKENBERGER
JAMES E, SH!~.JAVER
LARRY 1. J(E}.U'ER
JOHN B. FLATT
FREDERIC LAWRENCE
OF COUNSEL
JANE B. MERRILL
tr
NELSON
&
FRANKENBERGER
A PROFESSIONAL CORPORATION
AITORNEYS AT LAW
December 20, 200 I
Jon Dobosiewicz
City of Carmel
Department of Community Development
One Civic Square
Carmel, IN 46032
RE: The Townhomes at Hazel Dell
Plan Commission - January IS, 2002
Docket No,: 159-0IPP, etc,
Dear Jon:
~
3021 EAST 98TH STREET
SUITE 220
INDIANAPOLIS, INDIANA 46280
317-844'{)106
FAX: 317-846-8782
/..r.:-;;01 i '7
'\ \ "' , "L-. -.!._". !
/(,./>'" . -''-/...../-r.>\
/~' ;.:/ '<</ \
/;l llli~CC'!i 14 \8
! :.:! t! 'J /f/cl) \--\
r--\ <'/." ;.- I
'\---\ i)J") d41r !,e,/'
..,;\ "'VI" '~"j i....
\' '"'..\ (,,:0. ;--J
\~ v /,
\ /~ '/"1
,-~ ....,
.....<~, ') /'r.. _--< <~^'...)/
'-:....(.../::----,..,; '. /....
, ~:~~._l_~.. ....
I am assisting Paul Rioux in notification for the January 15,2002 Public Hearing on The
Townhomes at Hazel Dell. Enclosed is the Certified List of Property Owners provided by
Transfer and Mapping, and a copy of the Notice of Public Hearing which I have forwarded to the
Noblesville Ledger for Publication on Friday, December 21,2001. A copy of the Notice will be
mailed to each owner set forth on the list. If you should have any questions, please call. Thank
you!
JJN/kat
Enclosure
H:\KELL Y\JIM NIL TR2JOND.l2200IDOC
Kindest regards,
NELSON & FRANKENBERGER
. 1.
o
o
}
.
NOTICE OF PUBLIC HEARING BEFORE THE
CARMEL PLAN COMMISSION
Docket No's. 159-01 PP. 159-018 SW. 159-01b SW. 159-01c SW.159-01d SW. 159-01e SW
NOTICE IS HEREBY GIVEN that the Carmel Plan Commission ("Plan Commission"),
meeting on the 15th day of January, 2002, at 7:00 o'clock p.m., in the Council Chambers, Second Floor,
City Hall, One Civic Square, Carmel, Indiana 46032, will hold a Public Hearing upon an Application
for Primary Plat Approval ("Application") (Docket Number 159-01PP) for a residential community to
be known as The Townhomes at Hazel Dell on the 23.945 acre parcel of real estate located west of and
adjacent to Hazel Dell Parkway in the Northwest Quadrant of Hazel Dell Parkway and East 116th Street.
The Application and plans on file with the Department of Community Services request approval to plat
the real estate into 99 lots for single family town houses, and include a request for the following waivers
from the Subdivision Control Ordinance:
5.
159-01e SW SCO 6.5.1
Minimum distance between units of6'~
Minimum width of75' for Open Space;
Every Residential subdivided property shall be served from
a public street~
Frontage Place exceeds 600' and does not terminate at
street~
Minimum lot frontage of 50' at right-of-way.
1.
2.
3.
159-01a SW SCO 7.0.1
159-01b SW SCO 7.6.3
159-01c SW SCO 6.3.20
4.
159-01d SW SCO 6.3.24
The Real Estate is legally described on Exhibit "A" attached hereto and is zoned R-2 Residence
District Classification under the Zoning Ordinance of the City of Carmel, Indiana.
A copy of the Application is on file for examination at the Office of the Director of Community
Services, One Civic Square, Carmel, Indiana 46032.
All interested persons desiring to present their views on the above Application, either in writing
or verbally, will be given an opportunity to be heard at the above-mentioned time and place.
. ,
(.)
u
-;-
Written objections to the Application that are filed with the secretary of the Plan Commission
prior to the Public Hearing will be considered and oral comments concerning the Application will be
heard at the Public Hearing.
The Public Hearing may be continued from time to time as may be found necessary.
CARMEL PLAN COMMISSION
Ramona Hancock
APPLICANT
Platinum Properties
Attn: Paul F. Rioux, Jr.
9551 Delegates Row
Indianapolis, IN 46748
317/818-2900
H:\KELL Y\JIM NIPLATIJ'IIM PROPERTIESlNOTICE OF HEARING (CARMEL PC).DOC
2
u
u
MODERNIZED LAND DESCRIPTION
A portion of the property of American Aggregates Corporation
A part of Deed Book 172, pages 72 through 73, Instrument Number 1488 and
All of Deed Book 187, page 342, Instrument Number 11976 October 15, 1998
A part of the East Half and a part of the West Half of the Southeast Quarter of Section 33,
Township 18 North, Range 4 East, Hamilton County, Indiana, more particularly described as
follows:
Commencing at the Southeast Corner of the Southeast Quarter of said Section 33, Township 18
North, Range 4 East; thence North 89 degrees 42 minutes 50 seconds West (assumed bearing)
1322.90 feet along the South Line of said Southeast Quarter to the Southwest Comer of the East
Half of said Southeast Quarter, said point being the midpoint of the South Line of said Southeast
Quarter and the southwestern comer ofa tract ofland granted to Randolph D. and Michaelene
Martin ("Martin") in a Warranty Deed, recorded as Instrument Number 8819464 in the Office of
the Recorder of Hamilton County, Indiana; thence North 00 degrees 01 minute 19 seconds West
268.00 feet along the West Line of said East Half to the northwestern corner of said "Martin"
tract and the POINT OF BEGINNING of this description; thence continue North 00 degrees 01
minute 19 seconds West 2174.44 feet along the West Line of said East Half to the southeastern
comer of a tract of land granted to American Aggregates Corporation ("American"), said corner
lying 200.00 feet (measured southerly in a perpendicular direction) from the North Line of said
Southeast Quarter; thence North 89 degrees 51 minutes 19 seconds West 1326.76 feet along the
southern line of said "American" tract and parallel with said North Line to the West Line of the
West Half of said Southeast Quarter; thence North 00 degrees 06 minutes 46 seconds West
200.00 feet along said West Line to the Northwest Comer of said Southeast Quarter; thence
South 89 degrees 51 minutes 19 seconds East 1327.07 feet along said North Line to the
Northwest Comer of the East Half of said Southeast Quarter, said point being the midpoint of the
North Line of said Southeast Quarter; thence continue South 89 degrees 51 minutes 19 seconds
East 732.07 feet along said North Line to the northwestern comer of a 12.76 acre tract as
recorded in an Affidavit by Bertha M. Irwin ("Irwin"), recorded as Instrument Number 9024929
in said Recorder's Office; thence South 00 degrees 04 minutes 08 seconds West 138.46 feet
along the western line of said "Irwin" tract and parallel with the East Line of said Southeast
Quarter to the western right-of-way line ofa 10.164 acre tract of land granted to the City of
Carmel, Indiana, known as Parcel No.IE ("Parcel IE"), recorded as Instrument Number
9709749368 in said Recorder's Office (the following two (2) courses are along the western right-
of-way line of said "Parcel 1 E"); (one) thence South 24 degrees 59 minutes 17 seconds West
1 044.61 feet to the point of curvature of a curve concave to the east, said point of curvature lying
North 65 degrees 00 minutes 43 seconds West 1994.86 feet from the radius point of said curve;
(two) thence southerly 1319.17 feet along said curve to a point lying South 77 degrees 05
minutes 58 seconds West 1994.86 feet from the radius point of said curve and lying North 89
degrees 42 minutes 50 seconds West 9.19 feet from the northeastern corner of said "Martin"
tract; thence North 89 degrees 42 minutes 50 seconds West 153.35 feet along the northern line of
said "Martin" tract and parallel with the South Line of said Southeast Quarter to the POINT OF
BEGINNTN"G containing 23.945 acres, more or less.
EXHIBIT "A"
H:\KELL Y\JlM N'J'Latinum Properties\Legal Description.doc
~
_........---."---"......~...;---,...'.~~~_...-c.::.:.y_'_-.-z:.....;:........._~>
James 1. Nelson
NELSON & FRANKENBERGER
3021 E. 98th Street Suite 220
() indianapolis, IN 46280
/."....
I
I I I
7001 1140 0003 6985 1000
etV'
City of Carmel
One Civic Square
Carmel, IN 46032
~ ~
. '.~." ::..:"iIJ~!':-' ..~:
,\>,\'-iA~o.~..::?""rr-' .;..~. :~
Q <:" " .-'ili <r
" DEe"',, - ~"~ 1" 3 9 ~ ::..
_ (.'"\ J, ti -- . r _ 0'
.~ :
B ..ETEll -~ c
IN 8126409 U.S.POSTA'GE:
- ..
.~
;; .
4 :E. 0 3 :2 +'( S E. -3 i::1
1,1" I, II, ,",,, "11,,, I, """.,.", ",." I" I, I, ,1, I" II" I i
'.
u
(.)
.'
Johnson, Sue E
From:
Sent:
To:
Cc:
Subject:
Dobosiewicz, Jon C
Tuesday, December 18, 2001 1 :53 PM
Johnson, Sue E
'Paul Rioux'; Hollibaugh, Mike P
Docket Number Assignment - The Townhomes at Hazel Dell - Primary Plat and Subdivision
Waivers
Sue Ellen,
I have issued the necessary Docket Numbers for The Townhomes at Hazel Dell (?) Subdivision, Primary Plat and
Subdivision Waivers. They are the following:
159-01 PP
q"f
~ ($700 + $3710 ($700 + $35 per lot with.-W'610ts))
$630
$70
$70
$70
$70
~~lo(
159-01a SW
159-01b SW
159-01c SW
159-01d SW
159-01d SW
e:::>'
_,r
\r
~
Total Fee:
$5,228
~StOiS;
~~
Docket No. 159-01 PP; The Townhomes at Hazel Dell?
Petitioner seeks approval to plat a one hundred and six-lot subdivision on 23.95:i: acres. The site is located
northwest of East 116th Street and Hazel Dell Parkway. The site is zoned R-2/Residence.
The petitioner also seeks approval of the following Subdivision Waivers:
159-01 a SW SCO 7.0.1 Minimum distance between units of 6'
159-01b SW SCO 7.6.3 Minimum width of 75' for Open Space
159-01c SW SCO 6.3.20 Every Residential subdivided property shall be served from a public street
159-01d SW SCO 6.3.24 Frontage Place exceeds 600' and does not terminate at street
159-01d SW SCO 6.5.1 Minimum lot frontage of 50' at right-of-way line.
Filed by Paul Rio of Platinum Properties.
The petition will be placed on the January 15th, 2001, Plan Commission agenda under Public Hearings. Please
note that while this item will not be placed on the T AC agenda the applicant is expected to contact T AC
members to address any outstanding concerns prior to the public hearing on the 15th of January. Specifically,
but not exclusively, the Carmel Engineering Dept.
In addition the item will be placed on the January 8th Subdivision Committee agenda as an informational item.
Information packets for distribution to the commission need to be in our office by Friday, January 4th for
mailing.
Please contact Keith Lash at 826-6402 with this information. Paul Rio will be in the office on Wednesday to
deliver the applications and pay the filing fees. Once Mr. Rio delivers the applications and the docket numbers
are recorded please return the file to my office.