Loading...
HomeMy WebLinkAboutMinutes PC 02-21-23 • Our new banking center will have multiple uses; 1' floor bank,2nd floor for office space, 3rd floor for bank operations,community room,and useable roof-top space • We ask the PC to approve the DP/ADLS and DSV at tonight's meeting Public Comments: None Department Report: Alexia Lopez: • Combo hearing for a new multi-tenant building with a bank • The building steps down to 2-stories for part of the building • Since the Dept.Report was completed,the Petitioner has revised their plans and addressed all of our outstanding comments,which the Petitioner presented in their handouts.The Petitioner increased the parking space dimensions to meet the Overlay standards,they will have 3 drive-thru stacking spaces for the ATM,they reduced footcandles along the property line,added wheel stops at the parking spaces next to sidewalks,and reduced number of signs on the building. • Staff recommends the PC suspend the Rules of Procedure to approve this proposal at tonight's meeting Committee Comments: Christine: What were the parking space adjustments?Ashton Fritz,Engineer:Northern row and western row parking spaces are 9x20, south side parking spaces are 10x18. We didn't have enough space on the southside to shift it anymore. Jeff: Can we have a commitment if there are broken sidewalk panels along Michigan Road,can you commit to fixing them?Ashton Fritz: Yes,we can fix those. We would need to coordinate with INDOT. We are proposing a sidewalk connection from the entrance to the existing sidewalk.Brad: Who's responsible for the sidewalk maintenance along US- 421/Michigan Road ROW?Alexia Lopez: INDOT,but we usually have the property owner adjacent to the sidewalks responsible for them. Leo: I thought this was going to Committee,and not straight to approval at tonight's meeting. Why for the change? Alexia Lopez: Since the Department Report was released,the Petitioner has addressed all of the outstanding comments. A Motion made by Grabow and seconded by Kirsh to suspend the PC's Rules of Procedure in order to vote on this item tonight. Approved 8-1,Dierckman. A Motion made by Hill and seconded by Kirsh to approve PZ-2022-00247 DP/ADLS and PZ-2022-00248 V with the conditions the Petitioner will make any necessary repairs to the path along their street frontage and will work to provide a connection to the neighboring sidewalk south of the property(Christian Brothers). Approved 8-1,Dierckman. Old Business 3. Docket No.PZ-2022-00237 DP/ADLS: Carmel Medical Office Building at The Bridges. The applicant seeks site plan and design approval for a new,three-story medical office building on 9.23 acres.The site is located at the SW corner of Illinois Street and Pittman Way,south of the Market District grocery and west of the KAR office building. The future address will be 11380 Illinois Street.It is zoned PUD(The Bridges Z-550-11)and is not within any overlay district. Filed by Nathan Winslow of American Structurepoint on behalf of the owner,Cornerstone Companies. Petitioner: Nathan Winslow,American Structurepoint: • Presented Site Plan, Dumpster Enclosure elevations, rendering view from the future Steadman Apartments, Landscape Plan along the internal drive, • Our mechanical units will be properly screened • Plenty of street trees will be planted along the internal drive • Steve Pittman,original owner of The Bridges,has corresponded with the current owners about the conditions of the detention ponds within the Bridges development • We have committed to provide an outdoor bicycle location. We will work with the Alternative Transportation Coordinator on the structure and location. Proposing the location at the northwest corner of the building. 2 Plan Commission Minutes 2-21-23 Recap of Commercial Committee,Josh Kirsh-Committee Chair: • The heights of the light poles have been reduced from 25' to 20' • Sheltered outdoor bike parking,and indoor shower/locker rooms will be provided IDepartment Report: Alexia Lopez • Our outstanding comments were related to the bike parking and indoor changing facilities. • Staff recommends approval at tonight's meeting with the commitment for the bike parking and indoor changing facilities Committee Comments: Brad: Will you be planted any evergreen trees along the west property line?Nathan Winslow: We don't have any plans for evergreens,mostly ornamental and decorative styled trees. Brad: Please continue to work with the Urban Forester on the selection of tree species. Jeff: Will a detention pond be constructed for this project?Nathan Winslow: Yes, it will be a temporary dry basin detention until the southern parcel is redeveloped. It would then turn into an underground basin. Jeff: Will there be an access off of 111' Street during construction?Nathan Winslow: We can commit to not having any construction access off of 111th Street. A Motion made by Zoccola and seconded by Krish to approve PZ-2022-00237 DP/ADLS with the conditions a shower and changing facility(with public access)will be provided within the building,and long-term bike parking will be provided on site with the approval of the Alternative Transportation Coordinator. Meeting adjourned at 6:40 p.m. '...\---- ,.../Q1dt?../( Joe estak PC Secretary Brad Grabow President I Plan Commission Minutes 2-21-23