Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
C403 - FLOOD ROUTING PLAN
UPRANGELINE ROAD 1ST AVE. SE 1ST ST. SESUPPLY ST.MULTI-USE BUILDING3-STORYFFE = 835.00MFPG = 835.50MLAG = 835.50MULTI-USE BUILDING3-STORYFFE = 835.00MFPG = 835.50MLAG = 835.50TOWNHOMES7-UNITSFFE = 841.25MFPG = 838.77MLAG = 838.77TOWNHOMES4-UNITSFFE = 841.15MFPG = 841.65MLAG = 841.65DRAINAGE LEGEND:FLOOD INFORMATION NOTE:UTILITY NOTE:DRAINAGE SUMMARY8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:325-748 FEBRUARY 02, 2023 ACH29 LOR COMMERCIAL DEVELOPMENT RANGELINE ROAD MIXED-USE DEVELOPMENT 175 S RANGELINE ROAD CARMEL, INDIANA 46032 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:FLOOD ROUTING PLAN 325-748 NPJ ACH ACH9C403 NORTHADDITIONAL CITY OF CARMEL NOTES:02/06/2023