Dick,
It
Consistent with what we did on the Garrison Enterprises petition (Docket No. V-68-00), I informed the petitioner that we
would only require the curbing of the newly-paved portions of the lot. I've copied Terry on this in case he has a different
take on it.
Laurence
-----Original Message-----
From: Hill, Dick B
Sent: Friday, January 19, 2001 4:14 PM
To: Lillig, Laurence M
Subject: Carmel United Methodist Church
Question not asked at TAC. Will the church be required to curb the rest of their parking area since they are adding
parking with curbs? Seems I recall that a business on 3rd Avenue wanted to expand an existing curbless parking area
and they were told they would also be required to curb not only the new but also the existing.
1
"
w (;)
City of Carmel
'<. .
DEPARTMENT OF ENGINEERING
/.--:ItL'
/,
/
I,
I',
{~:'::i/
-~
,
--'
\_J,
,,'
C~j'\
./
~
JEC8VE~
fIB. r 2001
IIOCI
}\
- \
--I
-J
i
I
Mr. Jeff Bolinger
Fanning/Howley Associates, Inc.
3750 Priority Way South Drive, Suite 110
Indianapolis, IN 46HO
}/o
S().~ '
February 5, 2001
RE: Carmcl Unitcd Mcthodist Church/Pm.icct Rcvicw #1
Dear Mr. Bolinger:
I apologize for the delay in our responsc for this projcct. Wc havc rcvicwcd thc plans submillcd for the
addition and renovations to the Cannel Unitcd Methodist Church. We offcr thc following commenls:
I. This project is within the City of Carmel water and sanitary sewer scrvice area. All other infrastl1lcture
issucs arc within City of Cannel jurisdiction.
2. Board of Public Works and Safcty Approvals Rcquircd
Therc do not appcar to be any Board of Public Works and Safety submission/apprO\'al requircmenls
with possibly two exccptions:
. Water and Sanitary Scwcr Additional Availability (Connection Fecs). Sincc thcrc is a building
addition including classrooms, kitchcn and rcstrooms, thcrc may bc additional conncction fces for
watcr and sanitary sewcr. C.mnel Utilities will pro\'ide a separatc rcvicw of this project rcgarding
water and sanitary scwer issucs, The issuc of addilional fees will be reviewed wilh Carmel
Utilities.
. Right of way andlor easemcnt cncroachmcnt. This issuc is co\'cred in morc detail later in this
corrcspondencc.
1, Thc City. as r,art of the Rangelinc/Cily Ccntcr projcct. imprm'cd a ponion of the existing easternmost
drivc on 126" Strcct. 11 appears this work is included iuthe demolition plan. Is this cOITecl"
4. Thc right of way on Rangeline Road and on 12(,'11 Street. indicated as proposed on Sheet No, 1. should
be indicatcd as cxisting. I belicvc this right of way laking has becn completed.
S, Thcre is an existing right of way encroachmelll at the I10rlheast cOf'ller of the e"islillg parkil1g lo!. The
twelve parking spaces and the Dumpstcr IXld encroach into the dedicated right or \lay of (,'11 Stred S.L.
This may bc rcmcdied by either remO\'al of thc cncroachmcl1t dlll'ing rcnovatiol1 aCli\'ilics or by
rcqucsting Board of Public Works and Safcty approval of the cncroachment.
6. Is thcrc any rccord of that portion ofthc right of way of(i'11 Strect. fromlhe east right of way line of I"
Avenuc S.E. to the property line of the large church parcel. beiug vacated?
7, On Sheet GDI.O. isn't the island between the parking lot dcmolilion also bcing rcmon;d"
l{, All arcas of nC\l parking and/or asphalt being rcconligured lor dri\'es must be cmbed, 11 appears this is
thc case in all arcas with the exception of the area in thc northeast corner at the exisling house am! the
arca between the two buildings on Ihe sonth side of the church properly. These areas arc identilicd as
slopcd cnrbs/asphalt and lurf cdge, What is the rcasoning for lhe c1illliualiou of curhs in these areas?
Is it becausc Ihese areas arc adjacent 10 church property'./ Uulcss c.\clllpted by lhe City Ellgilleer. thesc
areas will be required to bc curbed. as is the case wilh the remainder or Ihe rcnO\aliolls.
lJ, For c1arilkation. plc:lse illdicate all dedicaled righl of way alld right of wa~' lines 011 all drawings,
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317{571-244t
...
U)
(;)
Mr. Jeff Bolinger
February 5, 2001
Page 2
10. On Sheet G1.1, there is an arrow pointing to the West Side of the East l26th Street drive without
identification. Also, what do the dashed lines represent just west of this entry. This appears on other
sheets.
11. On sheet SUl.l, please identify ail stonn structures, pipes, etc. as either existing or proposed. Please
identify any existing stonn structures, pipes, etc. that are scheduled to be removed.
12. It would be helpful if stonn pipe material and inverts are indicated on the plans.
13. We agree with Jolm South's statement at T.A.C. regarding the need for drainage improvements along
the north property line, from the Indiana Gas substation. We also request that aJl existing pipes,
culverts, etc. that are scheduled to remain in place be opened up or replaced to return thc system to its
original capacity.
We request tIlat all comments and comment letters generated by this office be answercd in writing and be
accompanied by a drawing reflecting requested revisions. Final drawings will not be approvcd for
construction until all issues have been resolved, including Cannel Utility issues. Thc design cngineer must
certify all drawings submitted for review. TIllS office will require five-sets of approvcd drawings aOer all
issues llave been resolved. The drawings will be approved and signed by tIle City Engineer and the
Director of Cannel Utilities. The Developer/Owner will receive one set to be maintained on the
construction site. Cannel Utilities will receive two-sets. Our Public Works Inspector will receive one-set
and one-set will be lnaintained in the Department of Engincering.
If you have questions, please feel free to contact Kate Weese, City Engincer or me at 571.2441.
siler~IY~ } J
rO~
Dick Hill. Assistant Director
Department of Engineering
Enclosurcs
cc: M. Kate Weese, City Engineer (w/o enclosures)
John Duffy. Cannel Utilities (w/o enclosures)
Laurence LilJig, Department of Community Services (w/o enclosures)
S:II'R,O.JREVO I IUN1TEDlvlETHOJ)IST
_ .L. _
u
u
~
.
~OW~
Associates, Iiic.
~ Enpeers Consultants
T RAN
s
M
~~ ~\>'-\
I~~ II
JAf--i
I 1\...., T ~8 2tfl ,2")
\,., \, j/'"
January~~1:~;200~ --AS;'-
"-/.~ ::~-n 1 c;\
-_.~:..-:....-
To: Laurence M. LillJg. Jr.
Planning Administrator
Oept. at Community Services
City of Cattttel
One Civic Sauare
Carmel. Indiana 46032
From: Jeff Bolinger. ASLA Je
Landscape Architect
Date:
Project:
Additions and Renovations to
Carmel United Methodist Church
Carmel, Indiana
Project No. 200091.00
NO. OF COPII:S
1
DESCRlP'nON OF ITEMS
Site Plen with Alternetive Temporary Pel'king
Sent via: D Mail 0 Overnight
~ Fax (317) 571-2426
D UPS D ~nd Deliver
~age 1 of2
o Pickup
COMMENTS:
Please find the accompanying Dlsn shows the temporary parking the Church is contemplating on the south
side of the bunding. Please review and advise U5 as to the construction requirements they would need to
meet.
Thank you for your assistance.
JBnh
1'.0 eo.. 80006 .. IIldIaAlpol~.lncbAna 46280
3'750 Priority Way South Drive. SuilR 11(')" l!1dianapnli$. Indiana 46140
,...,,_ _~_ __..~ _ _ ....~_ _4_ __4.. _ t.. o. ...
aSI-~ ZO/IO'd BIB-!
StaonallS
S'dQNI-A3MOH 9NINNV~~~~
80:BI 10-IS-Nvr
_L __u
..
o
u
.
~"
:-:1
JJ"
~. !
f~ ~tl
-
-~
I
e'
It ~\9)
~~tt~ 1.~~\
~,,\\ ~\
fJQcra
00t ~ .... _ ......
'J'l"ot! .. ~,.". . 3 (f"f"'ftW
"
8BI-~ ZO/ZO'd glg-!
Bt808t81IB
S'dONI-A3MOH 9NINNV~~~
OPSI IO-IB-NVr
u
u
!lSlWl-danningIJ-Iowey
U ~ul:5 Associates, me.
Architects Engineers Consultants
~l!7;,,;',..
/\ \e.'--'--. I ! "-,
.~ ".// ',- -..~...,.....( ~ -""
. "-',,'
AGENCY/ARCHITECT MEETING
CARMEL UNITED METHODIST CHURCH
Carmel, Indiana
)(+
~~
\
':>'\
Date:
January 17, 2001
Re:
Additions and Renovations to
Carmel United Methodist Church
Carmel, Indiana
Project No. 200097.00
To:
Robert Dugger, Owner's Representative
The following is a report of our meeting on the above date. If you find anything with
which you disagree, please let us know.
Present:
City of Carmel Technical Advisory Committee Members: Richard Hill, Department of
Engineering; Charles Shupperd, Indiana Gas; Jeff Kendall, Deputy Building
Commissioner; John South, Hamilton County Soil & Water Conservation; Scott Brewer,
Urban Forestry; William Akers, Carmel Communications; Gary Hoyt, Office of the Fire
Chief; Laurence Lillig, Department of Community Services; Charles R. Tyler, Jeff
Bolinger; Fanning/Howey Associates, Inc.
Purpose:
This meeting was held for the Technical Advisory Committee review of the Carmel
United Methodist Church expansion.
1. Chuck Tyler provided an overview of the building program.
1. Jeff Bolinger provided an overview of the site development and utility plans.
2. Dick Hill noted the following:
a. The storm drainage plan needs to identify (label) existing and new lines.
b. Storm water calculations were requested and were submitted by Jeff Bolinger at this
meeting.
c. All new parking areas will be curbed. Existing parking to remain will not be curbed.
3. Chuck Shupperd noted the following:
a. Gas line relocation needs to be confirmed.
b. Additional building load should be reviewed with Robert Darning at Indiana Gas.
P.O. Box 80006 ... Indianapolis, Indiana 46280
3750 Priority Way South Drive, Suite 110 ... Indianapolis, Indiana 46240
(317) 848-0966 "l Fax (317) 848-0843 "l http://www.fhaLcom
u
(,)
AlA MEETING (01/17/01)
CARMEL UNITED METHODIST CHURCH
Carmel, Indiana
Project No. 200097.00
Page 2
4. Jeff Kendall requested the following:
a. The code plans need to be submitted for review. Wall penetration requirements through
the area separation wall (firestopping) need to be identified.
b. Morris Hensley with Carmel Water needs to be contacted regarding the demolition of
the existing house and the proper capping of any existing wells. A signed document is
required from Mr. Hensley prior to release of the Project.
c. If any of the existing structures are to be demolished, a demolition permit will be
required by the City of Carmel.
5. John South requested further erosion control documentation and also noted that some of the
existing storm structures along the north property line are in need of repairs/cleaning.
6. Scott Brewer noted the following:
a. A tree preservation plan with details needs to be submitted for the Project.
b. The burning bush proposed for the landscape buffer along the east property line should
be reconsidered. The City will forward a copy of recommended species.
c. Street trees should be provided along the south edge of the new parking lot along 126lh
Street.
d. The City does not recommend the use of Austrian Pine. They would suggest one from
the Spruce family instead.
7. Gary Hoyt provided the following information:
a. The location of the Fire Department connection needs to be reviewed and approved.
b. Direct access is need to the fire riser room. This could be through the current electrical
room.
c. The Knox box needs to be relocated to the door adjacent to the riser room.
d. The Variance Application for the Project was discussed. This covers the additional
square footage being created within the existing building footprint at the atrium. Mr.
Hoyt did not have any concerns regarding this approach.
[F3~anning(Howey
AssoCIates, Ine.
Architects Engineers Consultants
u
Q
AlA MEETING (01/17/01)
CARMEL UNITED METHODIST CHURCH
Carmel, Indiana
Project No. 200097.00
Page 3
8. Laurence Lillig provided the following items:
a. The property is currently comprised of seven different parcels. This will complicate
review of the Project since all current property lines will be considered as they apply to
setback requirements, etc. The parcels should be combined into a single legal
description and ownership.
b. The Church's existing north parking lot is located slightly into the existing right-of-way
for 6th Street. Mr. Hill will review this further and advise.
c. A site plan that overlays the current parcel lines with the current site development plan
will be submitted for review.
d. A variance for the height limitation for the new addition will be pursued by the Church.
Charles R. Tyler, AlA ct'l
Project Designer/Principal
crt!