Loading...
HomeMy WebLinkAbout3D Company, Inc/ENG/CO #2/106th and College Ave RAB DocuSign Envelope ID:A05EB794-4E8D-4CBB-BD32-DEE1134F9112 ( APPROVED By Jon Oberlander at 9:45 am,Apr 13,2023 City of Carmel Project 20-ENG-02 Intersection Improvements : 106th Street and College Avenue Roundabout CHANGE ORDER #2 Pay item is being created for the demolition of the existing structure on the northwest corner of the new roundabout. The cost includes all demolition and removal of existing structure, utility disconnects, asbestos reports, backfill, dump fees, labor and equipment. There is no time extension for this work. Pay item 0037 is not used on project so quantity being adjusted. Contract Price prior to this Change Order $3,759,360.21 Contract Price will be changed by this Change Order $21,026.40 New Contract Price including this Change Order $3,780,396.6 I Amount Adjusted Contract Cumulative%Change Price from Original Contract Original Contract $3,660,000.00 N/A N/A CO1 $99,360.21 $3,759.360.21 2.71% CO2 $21,026.40 $3,780,396.61 3.29% DocuSign Envelope ID:A05EB794-4E8D-4CBB-BD32-DEE1134F9112 CITY OF CARMEL TO: Jeremy Kashman CONTRACT CHANGE ORDER NO.: 2 City Engineer DATE: April 12, 2023 City of Carmel Indiana PROJECT NAME: 106th and College Ave RAB One Civic Square CITY REQ. NO.: Carmel, IN 46032 CITY PO NO.: 20-ENG-02 CITY PO DATE: I. You are directed to make the following changes in this Contract: Pay item is being created for the demolition of the existing structure on the northwest corner fo the new roundabout at 106th Street and College Avenue. The cost includes all demolition and removal of existing structure, utility disconnects,asbestos report, backfill, dump fees, labor and equipment. There is no time extension for this work. Pay item 0037 being deleted from contract since not used. SCHEDULED ADJUSTMENT ITEM AMOUNT (+)OR(-)DAYS II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: N/A W.D.C.NO.: N/A The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 3,759,360.21 Contract Price will be increased by this Change Order $ 21,026.40 New Contract Price including this Change Order $ 3,780,386.61 Contract Time prior to this Change Order Days Closure 12/2/2022 Substantial Completion Date Contract Time prior to this Change Order 1/3/2023 Final Completion Date Net increased/decreased resulting from this Change Order 0 Days Current Contract Time including this Change Order Days Closure 12/2/2022 Substantial Completion Date Current Contract Time including this Change Order 1/3/2023 Final Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Accepted Approved Recommended DocuSigned by: American Structurepoint,Inc. 3D Company,Inc. C wi ENGINEER CONTRACTOR yilbbr ibugasi.. James Brainard,Mayor 9025 River Road,Suite 200 7240 North State Road 3 eA,l nV Address Address t'' "h4 �ttin Burke, Member by Indianapolis,IN 46240 Muncie,IN 47303 IU„hnu,. City/State/Zip City/State/Zip `LtS911"PV°ftson, Member Deanna D. ' .7-:'rzno— Je y K shman,pE,City Engineer By: T ar.Ard�y iz By: Case "—DocuSigned by: ATTEST: Phone: 317-281-9563 Phone:7 Sic (AMC 65-288-3326 ro s iasaaac;o... Sue Wolfgang,a u°l�erc 4/19/2023 Date: 04-12-2023 Date: 4/12/2023 Date: DocuSign Envelope ID:A05EB794-4E8D-4CBB-BD32-DEE1134F9112 in °■ 5TRUCTUREP01N7 American Structurepoint, Inc, ■ Change Order Details 20-ENG-02 - 106th and College RAB Description intersection improvements at 106th Street and College Avenue will consist of replacing a signalized intersection with a roundabout. The reconstruction of the intersection will include new full-depth pavement,curb and gutter, enclosed storm water network,lighting,and shared-use paths with new curb ramps and raised crosswalks. Prime Contractor 31)Company,Inc Muncie Change Order 2 Status Pending Date Created 04/12/2023 Type Owner Requested Change Summary Change Order 42 Change Order Description Pay item is being created for the demolition of the existing structure on the northwest corner of the new roundabout. The cost includes all demolition and removal of existing structure, utility disconnects, asbestos reports, hacklll, dump fees, labor and equipment. There is no time extension for this work. Awarded Project Amount S3,660,000.UU Authorized Project Amount S3,759,360.2I Change Order Amount S21,026.40 Revised Project Amount S3,7811,386.61 Change Order Details: 04/12/2023 20-ENG-02-106th and College RAB Page 1 of 2 DocuSign Envelope ID:A05EB794-4E8D-4CBB-BD32-DEE1134F9112 Increases/Decreases Line Number Item ID Unit Unit Price Current Change Revised Quantity Amount Quantity Amount Quantity Amount Section: 1 -Description 0037 503-05240 LFT $11.000 176.000 81,936.00 -176.000 -$1,936.00 0.000 .5U Illl D-1 CONTRACTION JOINT Reason: Not used on contract. 1 item Totals $1,936.00 -$1,936.00 S0.00 New Items Line Number Item ID Unit Quantity Unit Price Extension Section: 1 -Description 0167 202-05668 LS 1.000 $22,962.400 S22,962.40 DEMOLITION Reason: Existing structure on NW Quadrant of RAB l item Total: S22,962.40 Change Order Details: 04/12/2023 20-ENG-02- 106th and College RAB Page 2 of 2 DocuSign Envelope ID:A05EB794-4E8D-4CBB-BD32-DEE1134F9112 From: Maghala, Dave To: "Seth Blalock;Ogg,Chris Cc: Don Case; Deanna Case;ChrisRhodesMuncie@omail.com Subject: RE: Existing Building Demo Date: Tuesday,April 11, 2023 3:37:00 PM Attachments: im.ge001.pnq image002.onq image003.pnq image004.onq im•ge005.onq image006.pnq image007.pnq Seth, The City of Carmel is approving the cost for the building demo submitted by Deanna Case on March 2, 2023 in the amount of$22,962.40. There will be no additional days added to the contract for the closure period for this work. 3D is reminded to protect all newly constructed road items (path, curb, etc.) as repairs to any items will not be reimbursed by the City of Carmel. A new pay item for this building demo will be created on CO/12 to be drafted in the coming weeks—my target would be before the end of April. Thanks, David David Machala RI r Resident Project Representative ■ STRUCTUREPUINT . CELL • WEB 0 0 0 0 Best Places to Work in Indiana 0 •r JAW Best Employers in Ohio From: Seth Blalock<sblalock@3dcompanyinc.com> Sent: Friday, April 7, 2023 8:11 PM To: Machala, Dave<DMachala@structurepoint.com>; Ogg, Chris <cogg@carmel.in.gov> Cc: Don Case<Don@3dcompanyinc.com>; Deanna Case <dcase@3dcompanyinc.com>; ChrisRhodesMuncie@gmail.com Subject: Existing Building Demo EXTERNAL EMAIL: Do not click any links or open any attachments unless you trust the sender and know the content is safe!