HomeMy WebLinkAbout05080285 Misc.
~
=
AlA
Document G704™ -2000
~.
.
-
Certificate of Substantial Completion
TO CONTRACTOR:
(Name and address):
Smith Development and Construction
5220 East 64th Street
Indianapolis, IN 46220
OWNER: 181
ARCHITECT: 181
CONTRACTOR: 181
FIELD: D
PUNCH LIST: 181
PROJECT:
(Name and address):
Kipp Brothers Addition
9760 Mayflower Park Drive
Cannel, IN 46032
TO OWNER:
(Name and address):
Kipp Brothers
9760 Mayflower Park Drive
Cannel, IN 46032
PROJECT NUMBER: 05-01181
CONTRACT FOR: General Construction
CONTRACT DATE: February 08, 2006
PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE:
26,000 square feet additon to existing building.
The Work performed under this Contract has been reviewed and found. to the Architect's best knowledge, infonnation and belief,
to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated
portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for
its intended use. The date of Sub~tantial Completion of the Project or portion designated above is the date of issuance established
by this Certificate, which is also the date of commencement of applicable warranties required by the Contract Documents, except
as stated below:
Warranty
02/0812006
Date of Commencement
Peterson Architecture
ARCHITECT
~..".
.----~-
BY
oq~ O~
DATE OF ISSUANCE
O~
A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the
responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to in
writing, the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate
of Payment or the date of final payment.
Cost estimate of Work that is incomplete or defective: $ 0.00
The Contractor will complete or correct the Work on the list of items attached hereto within Zero ( 0 ) days from the above date
of Substantial Completion.
Smith Development and
Construction
CONTRACTOR
Jr~~ /J ~
2/10/06
DATE I ,
The Owner accepts the Work or designated porti
(date).
Kipp Brothers
OWNER
. ally complete and will assume full possession at
(time) on
"--'
2/10 / () rn
DATE I
The responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, damage to the Work and insurance
shall be as follows: '
(Note: Owner's and Contractor's legal and insurance counsel should determine and review insurance requirements and
coverage.)
AlA Document G704TN: -2000. Copyright @1963, 1978, 1992 and 2000 by The American Institute of Architects. All rights reserved. WARNING: This
AlAe Document Is protected by U.S. Copyright Law and Internatlonal Treaties. UnauthorIzed reproduction or distribution of this AIA~ Document, or - 1
any portion of It, may result In severe civil and crImInal penalties, andwlii be prosecuted to the maxImum extent possible under the law. This
document was produced by AlA software at 14:03:50 on 02/08/2006 under Order No.1000197605_1 which expires on 9/12/2006, and is 'not for resale.
User Notes: (4212025087)
,
Kipp Brothers Addition
Punch List
02/0812006
Complete asphalt and landscaping in the Spring.