Loading...
HomeMy WebLinkAboutSite Layout Plan_Stamped Approved3.00'4.05'±3.00'48.99'±10.00'1 4 . 3 9 ' ± 10.00' 43.40'±4.62'53.33'±39.02'±3.00'15.35' 3.00'3.00'6.90'±6.00'58.98'± 7.08'± 14.00'14.00' 5.22'42.96'±3.00'Match ExistingMatch ExistingMatch Existing R 1 0 . 0 0 'R10.00'R20.00'R2 0 . 0 0 ' 4.81'99.94'± (21 Eq.)Maintain Existing Conditions Maintain Existing Conditions13.00'13.00' 1 0 . 1 1 '7.00' 7.00'7.00' 19.25' 44.9 0°' Existing Tulip Tree to Remain, Protect in Place. Existing Crabapple Trees to Remain, Protect in Place. Existing Metal Structures aloong E/W Connector Walk to Remain, Protect in Place. Center of This Sign to be Aligned to Concrete Sidewalk Centerline Suspended Canopy Posts to be Marked and Located in Field After Installation of Evergreen Screen Synthetic Turf Surfacing to fit within Existing Extents of Pavements Synthetic Turf Surfacing to fit within Existing Extents of Pavements Centerline of Shade Sail Posts Shall be 2.00' Offset of Synthetic Turf Surfacing Perimeter, Typ. Each Post Align Soldier Course of Unit Paving to Face of Existing Structure Existing Zelkova Tree to Remain, Protect in Place. Underdrains, See Note 7 Underdrains, See Note 7 Underdrains, See Note 7 EXISTING PARKING LOT FLEX / PUTTING AREA PARKWOOD 3 FLEX / GAMING AREA PARKING STRUCTURE PARKWOOD 46.50'6.58'5.00' 5.19'10.19'5.90'2.65'2.57' 5.78'4.28' 4.28'2.91'55.13 °' 2 9.01 '40.99'2 4 . 1 8 ' 30.90' 9.86'24.45'12.51'14.95'1 6 . 5 2 ' 25.34' 15.04'R11.18'R13.79'R56.56'R13 .96'R9. 1 8 ' R13.3 1'R102.86'R13.56'R121.66' Revision Date Description Date: Project No: Drawn by: Checked by: 21-1513 AY, SG, SS DTF 2023-01-275825 Lawton Loop E. Dr. | Indianapolis, IN 46216317-485-6900 | www.context-design.comNOT FORCONSTRUCTIONPermit Documents for thePARKWOOD CROSSING VILLAGE GREEN550 E 96th St, Indianapolis, IN 46280LAYOUT PLAN L201 0 Scale 1" = 10'-0" 20'10'5' North 1. Dimensions are shown to Face of Curb, Wall, or Vertical Feature unless otherwise noted. 2. Refer to detail 1/L600 for concrete paving joint details. 2.1. "EJ" denotes Expansion Joint. 2.2. Natural color, broom finished concrete shall receive sawcut joints. 2.3. Sand release and decorative finish concrete shall receive double sawcut joints. 3. Contractor shall coordinate final joint locations in the field with the Landscape Architect. Align to existing conditions when practical, including at building and wall corners, connections to existing work, connections to key site amenity features, and to centerlines of doors. 4. Space control joints evenly between all bands and expansion joints as shown, unless otherwise dimensioned. Space interim joints equally whenever possible. 5. All pavement shown shall adhere to Details and Specification 321316 Concrete Paving. All disturbed areas not proposed to receive pavements shall be dressed with topsoil and seeded per Specifications. 6. If unit pavers are installed on concrete substrate contractor shall provide a jointing plan to Landscape Architect for approval prior to construction of unit paving substrates. Jointing plan should include expansion and contraction joints. 7. Underdrains within Synthetic Turf Surfacing areas shall be field staked for final layout approval with Engineer and Landscape Architect. Contractor shall use the locations as indicated in the Plans as the basis for underdrain layout staking. Install underdrains in accordance with all local codes.1 03.24.2023 City Comments04/27/23