Loading...
HomeMy WebLinkAboutCorrespondence u v 1.!.!!!P, Laurence M Lillig, Laurence M Monday, February 25, 2002 5:34 PM Hill, Dick B; Dobosiewicz, Jon C Weese, Kate K RE: Office Building at 300 E. M~in\1?~a/~ /i,,\..l-- _~<'<fi> ' 'J" . "- /"/ ~ . -:;)>, Yes, we will allow the new area alone to be curbed f07fh~(time_~ . \f\ 'i An 'N~@ r-=-' -Original Mes~age:-- 1<, fR 16 IJ From: Hili, Dick B \.-i 1002 Sent: Monday, February 25,20024:19 PM \(' DOCS To: Dobosiewicz, Jon C; Lillig, Laurence M ~}).:A Cc: Weese, Kate K "<( Subject: Office Building at 300 E. Main >?sr. ~i1t;.\ Is there any wiggle room in the curbing requirement for this project? Mike McBride, in his review letter to Mr. Ahluwalia, stated that all parking areas are to be curbed and paved including the existing area. The owner says that the requirement to curb the existing parking will sink his project. He indicated that he might be able to curb the existing parking at some point in the future. Kate is comfortable with the requirement to curb the new parking area only since the drainage from the existing parking flows towards the new area. We are requiring that he install a storm sewer inlet in the new parking area to provide an outlet for drainage. From: Sent: To: Cc: Subject: 1 '~,'Of C-4~ . ..l'~ '"\/----:...T..1?:. ""<);/u""'~ ..... f~ 't.\ Ie/) (fl' :. .l~ ~! * ") \G: sf \~~~oN~c6/*" u u City of Carmel \jM 52,0 I " . 3~ ~o I DEPARTMENT OF ENGINEERING April 5, 2002 Charan Ahluwalia 894 Arrowwood Drive Carmel, IN 46033 .~-~:- / ,_1-"1';--...... '." ,,~- --.-1 I ~~ " )- ~<,( >' A ~; :l" 'i~J' A~~t}r~Jrf~@ r~ 'R 15 2002 L~I \ .,:\ Docs i:J \/\, /'1'" 'Y/'-, .."'\, ~''.''-I- }j< \Y ~, j-:-'-r \/ ~-'- RE: 300 E. Main Street Dear Mr. Ahluwalia: The Engineering Department has reviewed the revised site plan for the 300 E. Main St. property. All Engineering Department issues with the plans have been resolved and all requested revisions have been included in the revised drawing. Therefore, the drawing submitted to this office on March 12,2001 is approved. The following remaining Engineering Department requirements must be satisfied prior to your pre-submittal meeting with the City of Carmel Building and Code Enforcement: . The OwnerlDeveloper must obtain one set of signed/approved drawings from the Engineering Dept., which is to be maintained on the construction site at all times. If more than one approved set is desired, please make the request to the City of Carmel Department of Engineering. . A Right of Way Permit and Right-of-Way bond is required for the project. The permit form is available through this office. There is no charge for the permit, but a Right of Way bond is required for work in dedicated street right-of-way. Please provide a Right-of-Way bond (License & Permit type bond) in the total amount of $2,000.00. The bond amount is based upon the number of instances of work in the right-of-way @ $2,000.00 per instance as follows: -Storm Sewer connection to Storm Sewer Manhole within right-of-way of 1 st Street NE. The bond is to the City of Carmel in the amount of $2,000.00. The expiration date of the bond shall be at least one-year from the date of issue of the bond. . There will be no additional Availability Fees for this project because the existing Sanitary Sewer and Water Connections are to be utilized. However a Sewer Permit will still be required. The Sewer Permit is a requirement to obtain a Building Permit. The Sewer Permit requires the designation of a Bonded Plumber/Excavator. This is the person who will make the outside sanitary sewer connection from the new building to the existing lateral. I am including a listing of current Bonded Plumbers/Excavators. If the contractor you wish to use is not on our list, they may be added by providing a $2,500.00 Plumbers Bond (License & Permit type bond) to the City of Carmel. The bond must have an expiration date of at least one-year from the date of issue of the bond. ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2441 u w Mr. Charan Ahluwalia AprilS, 2002 Page 2 If you have questions or comment please feel free to contact the Engineering Dept. at 571-244 and ask for Kate Weese, Dick Hill or me. Sincerely, rV~)(hJt Michael T. McBride Assistant City Engineer Enclosures cc: M. Kate Weese, City Engineer (w/o encl.) Dick Hill, Assistant Director, Engineering Dept. (w/o encl.) Laurence Lillig, Department of Community Services (w/o encl.) Jon Dobosiewicz, Department of Community Services (w/o encl.) Jeff Kendall/Gayle Stahl, Building and Code Enforcement (w/o encl.) John Duffy, Carmel Utilities (w/o encl.) Robert D. Peterson, Polaris Land Surveying Z:\eng\shared\mmcbride\Project Review\2002lJOO E Main approva1.doc Q w l!!!!1J, Laurence M From: Sent: To: Cc: Subject: Hill, Dick B Monday, February 25,20024:19 PM Dobosiewicz, Jon C; Lillig, Laurence M Weese, Kate K Office Building at 300 E. Main Is there any wiggle room in the curbing requirement for this project. ride, in his review letter to Mr. Ahluwalia, stated that all parking areas are to be curbed and paved including the existing area. The owner says that the requirement to curb the existing parking will sink his project. He indicated that he might be able to curb the existing parking at some point in the future. Kate is comfortable with the requirement to curb the new parking area only since the drainage from the existing parking flows towards the new area. We are requiring that he install a storm sewer inlet in the new parking area to provide an outlet for drainage. 1 if::~Z~~~C~~:"'::. <;'~\ :/ ~UYi( '\,\, ',~ * (~ ;Ji *,>1 ~.$~ k// "'".':;;'~"""~'~ji\' '<";?~TON (;,0:,1/ o u City of Carmel DEPARTMENT OF ENGINEERING ~\ \""')7{--./ ' <-- \ v: ~-.A_I I ~', /,>>-.-- -,d / '" / \"'/ '( / "- I', )' "/ ~\ A--:"Y L'i 4 "'\ r"/I 'r'/'....... '-.(' I "-'I /.('n <t'/' ',."-', t..:-:! <6 ('/h;~ \ kd .Q ~ !~~I \ -\ ~O/'l <t2h 1,'--_. ,/' (..~ ~ /"-'1 \~~\ ,/..~~I ~," "j '02:LL<> ' February 22,2002 Charan Ahluwalia 894 Arrowwood Drive Carmel, IN 46033 RE: 300 E. Main Street Dear Mr. Ahluwalia: We have reviewed the site plan for the 300 E. Main S1. property that was submitted to this office on February 14, 2002 and offer the following comments: BONDING REOUIREMENTS 1. Upon initial review, it appears the following bonding requirements will apply to this project: Street CutlRight of Way Permit and Bonding Requirements Any work in dedicated right of way will require a Street Cut/Right of Way Permit and a License and Permit Bond. The bond amount will be determined by the number of instances of work in the right of way (curb cut, storm sewer work, etc.) @ $2,000.00 per instance. Open pavement cuts require the approval of our Board of Public Works and Safety. If there are alternatives to open cutting, they are e~edtobeutiliz~ PROJECT COMMENTS 2. All parking areas are required to be paved and curbed. The northernmost portion of the parking lot should be curbed with a minimum 6-inch chair-back curb in order to prevent unapproved access to lit Street NE. 3. A storm sewer inlet should be placed in the northwest comer of the parking lot to provide an outlet for drainage in the parking lot. This new inlet should then be connected to the existing storm sewer manhole at the northwest corner of the site within the lit Street NE right-of-way (T-junctions into the City's storm sewer will not be permitted). Installation of this connection will require work with the City's right-of-way and therefore will be subject to the Bonding Requirements listed above. Any damage to the City's property (grass, plantings, sidewalk, curb/gutter, or pavement) must be repaired prior to release of the bond 4. Water & sewer connections must be coordinated with the Camel Utilities Department. 5. A letter addressing the comments in this letter and revised drawing showing the required revisions should be submitted to this office for final approval. Please provide our office with a follow up letter and revised plans, indicating all revisions. If you have questions, please contact Kate Weese or me at 571-2441. Sincerely, -~'fI14~ idt^- Michael T. McBride cc: M. Kate Weese, City Engineer Dick Hill, Assistant Director Dept. of Engineering Laurence Lillig, Department of Community Services John Duffy, Carmel Utilities Robert D. Peterson, Polaris Land Surveying Z:\eng\shared\mmcbride\Prejmm~\1Sl3tJ3iRf M~tt~&~ INDIANA 46032 317/571-2441 ~ .' i ".7~~ \ti?(.:t Of C.4~~~ :'r(j~~~,% 01 ~ <',c, 0.'.. ~U'l"~ % ~~ ~i (~; \'< -so ,::r iY ",':,"1. ~N '~!ON C,!,j1'V -<"-~::Z:7_-::Z [t.- u u City of Carmel Dear Mr. Winzenread: ~~ ~ JAIV ~~7Pf,~1OJ l'l" 9 2(}Op uUGs January 7, 2002 Mr. Mark E. Winzenread Residential Design, Inc. 1622 Shannon Lakes Drive Indianapolis, IN 46217 ". RE: 300 E. Main Street We have reviewed the drawing submitted for this project and offer the following comments: GENERAL INFORMATION 1. The project site is located within current City of Carmel Corporate Limits. 2. Jurisdictions: . Street and Right of Way - City of Carmel. . Water, Sanital)' Sewer, Storm Sewer - City of Carmel. 3. Possible Board of Public Works and Safety Approval Requirements: . Water and Sanital)' Sewer Availability. . Commercial Curb Cut (if applicable). Please provide an exlubit that shows the location of the curb cut and acell/decellanes if applicable; appropriate dimensions including drive width, overall width at the street, acellldecel dimensions, radii, etc.; and location of existing opposing curb cuts, if applicable. The exhibit should be 8 Y2 x 11 or of a size that can be reduced to 8 Y2 x 11 such as 8 Y2 x 14 or 11 x 17. . Temporary Construction Entrance. Same requirements as for the Commercial Curb Cut. . Any permanent improvement to be installed within dedicated right of way. . Consent to Encroach Agreements for any permanent improvement to be installed within dedicated easements and/or right-of-way. I am enclosing a schedule for Board of Public Works and Safety meeting dates and agenda deadlines for your use. Please use the Engineering Department deadlines for submissions to the Board. . 4. Water and Sanital)' Sewer Connection Fees: . Connection Fees are based upon the average user factor tables from Section 9-35 (water) and 9- 200 (sanital)') of our Utility Ordinance. The Connection Fees are $1,310.00 per EDU for water and $795.00 per EDU for sanitary sewer. Please provide this office the total square footage of this facility. The Equivalent User Contribution Multiplier for offices is 0.5 EDUs per 1000 FT2. To arrive at the total Connection Fees, multiply the number of square feet by 0.5 EDUs/lOOO FT2 equals the total number of ED Us. Multiply the total EDUs by the Connection Fee for water ($1,31O.00IEDU) and sanitary sewer ($795.00IEDU). I am enclosing copies of our Average User Factors for Water and Sanital)' Sewers and our current fee schedule. I have also highlighted the Average User Factors that apply to this development. Note: Any deviation from the Connection Fee calculations listed in our Ordinance win require Carmel Utilities and Board of Public Works and Safety approvals. ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571.2400 i u u Mr. Mark E. Winzenread January 7,2002 Page 2 5. T AC Review/Drawings submitted for approval: We request that all comments and comment letters generated by this office be answered in writing and be accompanied by a drawing reflecting requested revisions. Final drawings will not be approved for construction until all issues have been resolved. All Carmel Utility issues must also re resolved. The design engineer must certify all drawings submitted for final approval. This office will require five- sets of approved drawings after all issues have been resolved. The drawings will be stamped approved and signed by both the City Engineer and Director Carmel Utilities. The Developer/Owner will receive one-set which is to be maintained on the construction site at all times. Carmel Utilities will receive two-sets. Our Public Works Inspector will receive one-set and one-set will be maintained in the Department of Engineering. If more than five-sets are requested to be approved, the additional sets must be submitted with the five required sets. 6. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated easements will require a Consent to Encroach Agreement between the Owner/Developer and the City of Carmel. This Agreement requires Board of Public Works and Safety approval. Installations within dedicated right of way require separatec Board approval. 7. Carmel Utilities does not subscribe to "Holey Moley" and should be contacted directly for all water main and sanitary sewer main locations. 8. Carmel Utilities will provide a separate review of this project for water and sanitary sewer issues. 9. I am including copies of the following with this correspondence: . Commercial Project Approval Procedures. . Performance Release Procedure. . Permit Data, Contacts, etc. . Commercial Permitting Procedures. BONDING REQUIREMENTS 10. Upon initial review, it appears the following bonding requirements will apply to this project: Street CutlRigbt of Way Permit and Bonding Requirements Any work in dedicated right of way will require a Street CutlRight of Way Permit and a License and Permit Bond. The bond amount will be determined by the number of instances of work in the right of way (curb cut, storm sewer work, etc.) @ $2,000.00 per instance. Open pavement cuts require the approval of our Board of Public Works and Safety. If there are alternatives to open cutting, they are expected to be utilized. PROJECT COMMENTS 11. Please differentiate between the existing and proposed site features (such as buildings, pavement, drives, drainage inlets, storm & sanitary sewer pipes, water lines, etc.). 12. If at all possible, the existing sanitary sewer & water connections should be used for the proposed building to avoid disturbances in the City of Carmel Right-of-way. 13. Please provide drainage calculations. We reserve the opportunity for further review and submission of comments regarding drainage upon receipt of such calculations. 14. Is there going to be access to this site from 1st Street NE? .. u Mr. Mark E. Winzenread January 7, 2002 Page 3 u The above comments are based upon the Engineering Department's initial review. Please provide our office with a follow up letter and revised plans, indicating all revisions. A second review will focus only on revised items. It is critical that our office be made aware of all modifications made on the plans being re-submitted, particularly if any such changes are considered "new" or fall outside of our initial review. If you have questions, please contact Kate Weese or me at 571-2441. Sincerely, ?~7Ji~ Michael T. McBride Enclosures cc: M. Kate Weese, City Engineer Dick Hill, Assistant Director Dept. of Engineering Laurence Lillig, Department of Community Services Jon Dobosiewicz, Department of Community Services John Duffy, Carmel Utilities Z:\eng\shared\mmcbride\Project Review\2002\300 E Main.doc u u Johnson, Sue E From: Sent: To: Stahl, Gayle H Thursday, November 29, 2001 10:43 AM Akers, William P; Brewer, Scott I; Dobosiewicz, Jon C; Hancock, Ramona B; Hill, Dick B; Hoyt, Gary A; Johnson, Sue E; Lillig, Laurence M; Weese, Kate K Kendall, Jeff A; 'cahluwalia@applied-e-s.com' Pre-Submittal for Ahluwalia Building Cc: Subject: The Dept. of Community Service, Building & Code Enforcement division, has received a request to schedule a pre-submittal meeting for the purpose of obtaining a building permit. Project: Ahluwalia Building (addition) @ 300 E. Main St. Meeting Date: Monday, December 3, 2001 Time: 10 a.m. Related Planning & Zoning docket numbers: V32-01, V33-01 and TAC March 2001. Representative: Chatan Ahluwalia If there are concerns that might affect the issuance of this permit, please REPL Y TO ALL on this e-mail. 1 U BAKER & DANIELS 0 EST. 1863 96TH STREET OFFICE 600 E. 96TH STREET, SUITE 600 . INDIANAPOLIS, INDIANA 46240 . (317) 569-9600 . FAX (317) 569-4800 . www.bakerdaniels.com JOSEPH M. SCIMIA DIRECT (317) 569-4680 DIRECT FAX (317) 237-8580 a-mail: jmscimia@bakerd.com May 11, 2001 INDIANAPOLIS FORT WAYNE SOUTH BEND ELKHART WASHINGTON, D.C. QINGDAO, P.R. CHINA VIA HAND DELIVERY Mr. Laurence M. Lillig, Jr. Planning Administrator Department of Community Services City of Carmel One Civic Square Carmel, IN 46032 Re: V-32-01 and V-33-01 Dear Laurence: Enclosed are eight (8) packets that should be distributed to the Board of Zoning Appeals in connection with the above-referenced matters. I have also enclosed Check No. 2275 in the amount of $700.00, which constitutes the filing fees for the above-referenced matters. Please give me a call if you have any questions. Enclosures JMS:msr ::ODMAIMHODMAIINIMAN2;530087; 1 r\ ~ o BAKER & DANIELS EST. 1863 96TH STREET OFFICE 600 E. 96TH STREET, SUITE 600 . INDIANAPOLIS, INDIANA 46240 . (317) 569-9600 . FAX (317) 569-4800 . www.bakerdaniels.com Mr. Laurence M. Lillig, Jr. Planning Administrator Department of Community Services City of Carmel One Civic Square Carmel, IN 46032 /)~---.f(-CI~lTJ..'-)"',.>~ /" \ .:;:-- -.....l, / ;~-'~\ / ' " "," "./ '" . <' / /~, ,/ T \..\./~ I':::, ;1 /1ltI\1!!1IMIt!IRt ~;:\ /". REw"fIl5t!dlf @1'APR2S2001JQ:J' \<;,",'-\ OOCS t' \/' .... \,A /. n." \, 1~ ". "" '!J:JJ' / '-C ,~~.\), 1::..~Ll_~3-Y./ INDIANAPOLIS FORT WAYNE SOUTH BEND ELKHART WASHINGTON, D.C. QINGDAO, P.R. CHINA JOSEPH M. SCIMIA DIRECT (317) 569.4680 DIRECT FAX (317) 237.8580 e-mail: jmscimia@bakerd.com April 23, 2001 Re: V-32-01 and V-33-01; 300 East Main Street, Carmel, Indiana; Charan Ahluwalia Dear Mr. Lillig: This firm represents Mr. Charan Ahluwalia in connection with the above-referenced matter. Mr. Ahluwalia hereby requests that the public hearing currently scheduled for April 23, 2001 on Docket Nos. V-32-01 and V-33-01 be continued to the regularly scheduled meeting of the City of Carmel and Clay Township Board of Zoning Appeals to be held on May 29, 2001. Unless you inform the undersigned otherwise, representatives of Mr. Ahluwalia will not be present at the regular meeting of the City of Carmel and Clay Township Board of Zoning Appeals to be held on April 23, 2001, and we will consider the matter continued to May 29, 2001. Please give me a call if you have any questions. JMS:msr Sincerely, ~ 0 ph MLO ::ODMAIMHODMA IINIMAN2;52431 0; 1 __ v , 'i I' fff/~ ~\\\\\~9~~ ~ '0/" rJi ~ ~~ W I/: \\ ~ ~ td~ ~) " * ~ ~ '... n S ~ ~ ~r ~ ~~\~ ::::.<~., ~ ~/{rON- CO'dlll\\\\~ ~/f,1' Date: 18 April 2001 u u CITY OF CARMEL DEPARTMENT OF COMMUNITY SERVICES Division of Planning & Zoning TRANSMITTAL ~<,<:'1?~~,~:; :~~~:~~.: ~,..~ To: Joseph M. Scimia of Baker & Danielslr\>~\/ . tax:>~rV 7) 237-1000 ,'/ j. ,,/) /"i/ T\,:./\ From: Laurence M. Lillig, Jr._ 7 ~~~~I!) 'L~. Planning & Zoning Administrator - r ~PR 18 2001 c:-\ Department of Community Services ,-\ oaes )L-) One Civic Square . :-, /:</ Carmel, IN 46032 ./"'~__~~':<~/ :'_'~.\": \ v,.;:~\~;./- Re: Carmel United Methodist Church (SUA-2-01) &-Ahluwalia Office Building (V-32-01; V- 33-01) ph. 317.571.2417 fax. 317.571.2426 . The material you requested D For review and comment D For your information D For approval Joe, Attached is Article IV, Section 8, of the Carmel/Clay Board of Zoning Appeals Rules of Procedure. If I can be of any further assistance, please do not hesitate to contact me at 317.571.2417. Laurence M. Lillig, Jr. (j u o Section 3. Any application to the BZA which involves land usage in any way shall be sent to the Technical Advisory Committee (T AC) for its review and recommendations prior to being heard by the BZA. Section 4. Petitions not initiated by the BZA itself shall be accompanied by a non- refundable filing fee as established by Ordinance. Section 5. For the purpose of amending the previous section (Article N, Section 4 dealing with Filing Fees). The BZA shall publish a public notice as required by Article VI of these Rules of Procedures. Section 6. The order of business on the agenda for each regular meeting shall be: A. Call to Order B. Pledge of Allegiance C. Swearing in of Members (when applicable) D. Roll Call E. Declaration of a Quorum F. Approval of Minutes of Previous Meeting(s) G. Election of Officers (when applicable) H. Communications, Bills and Expenditures I. Reports, Announcements and Staff Concerns 1. Public Hearings K. Old Business L. New Business M. Adjournment Section 7. All items on the agenda for each meeting shall appear, under the proper heading, in the order of their assigned docket numbers unless otherwise ordered by the BZA. Section 8. Copies of the agenda and support documentation for the items appearing at the regular meeting shall be submitted to the BZA members no less than seven days prior to the meeting. If support information on a particular item is not received by the Board seven days prior, the item will be tabled until the next regularly scheduled meeting. Deletions, but not additions, to the agenda may be submitted to the BZA at a regularly scheduled meeting. The agenda for a special meeting may be submitted at the time of the special meeting, but shall include only the item or items for which the meeting was specifically called. s: \bza\rulesofprocedure.1999 4 (: , -' o o BAKER & DANIELS EST. 1863 96TH STREET OFFICE 600 E. 96TH STREET, SUITE 600 . INDIANAPOLIS, INDIANA 46240 . (317) 569.9600 . FAX (317) 569-4800 . www.bakerdaniels.com JOSEPH M. SCIMIA DIRECT (317) 569-4680 DIRECT FAX (317) 237-8580 e-mail: jmscimla@bakerd.com ~ f. HARrg~~N~@ 29 2001 DOcS INDIANAPOLIS FORT WAYNE SOUTH BEND ELKHART WASHINGTON, D.C. QINGDAO, P.R. CHINA March 27, 2001 Mr. Laurence M. Lillig, Jr. Planning Administrator Department of Community Services City of Carmel One Civic Square Carmel, IN 46032 Re: SUA-2-01: V-32-01 and V-33-01: and V-34-01 and V-35-01 Dear Laurence: Enclosed are the Petitioner's Affidavit of Notice of Public Hearing for each of the above- referenced petitions. Please cause a copy of the enclosed Affidavits to be placed in the respective files for the above-referenced petitions. Please give me a call if you have any questions. ~ JMS:msr ::ODMAIMHODMA IINIMAN2;516340; 1