HomeMy WebLinkAboutCorrespondencePlan Review - Review Comments Report Project Name: PZ-2023-00060 ADLS Amend L'Etoile Workflow Started: 3/9/2023 4:00:48 PM Report Generated: 03/11/2024 03:04 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 1 1 Building & Code Services Mike Sheeks 3/24/23 9:52 AM Comment Please provide the number of parking spaces and show the ADA parking locations. Thank you, Mike S. Responsed by: Ben Bemis - 8/16/23 7:43 AM There are 45 total parking spaces. 2 ADA spaces are provided and are included in the total parking count. A variance request for parking counts has been approved by the BZA docket number PZ-2023-00084V. ---------------------------------------------------------- Responsed by: Ben Bemis - 4/26/23 4:01 PM Parking space totals have been updated on the site plan. ADA parking is also shown on C200. Resolved 2 1 Planning & Zoning Alexia Lopez 3/27/23 9:23 AM Changemark Parking How many parking spaces do you have? This note says 81, but I only count 38. The minimum required is 66. C200 - SITE LAYOUT PLAN.pdf Responsed by: Ben Bemis - 12/18/23 1:49 PM The number of residential units were reduced and now the project meets the parking requirements. Please see updated parking calculation on Sheet C200. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 4/28/23 3:43 PM Can you obtain a cross parking agreement/easement with a neighboring property to make up some of the spots you are not providing on site? ---------------------------------------------------------- Responsed by: Ben Bemis - 4/26/23 4:12 PM There are 36 parking spaces proposed. A variance has been requested and is currently under review. Resolved REVIEW COMMENTS Plan Review - Review Comments Report Project Name: PZ-2023-00060 ADLS Amend L'Etoile Workflow Started: 3/9/2023 4:00:48 PM Report Generated: 03/11/2024 03:04 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 3 1 Sign Permits Aliza Shalit 3/27/23 4:34 PM Comment Please include all proposed tenant sign locations Responsed by: Ben Bemis - 3/7/24 11:23 AM See updated A6 - Elevations sheet for Tenant signage notes. ---------------------------------------------------------- Responsed by: Ben Bemis - 2/20/24 10:32 AM • Location of Tenant Signage will be per previously submitted Elevations (Sheet A-6) mounted on the Front Face of Metal Canopies. • Signage will consist of Back lit (halo lit) 3” Deep Individual Channel Letter illuminated with White LED ’s. Letter Face to be Aluminum and painted to match “Satin White” mounted on 1/8” Aluminum Light Splash Backer painted to match “Draconia Satin” (MP40821). • Letters to be mounted on (2) 2”x2” Aluminum Tubes Raceways, spaced 6” apart. ---------------------------------------------------------- Reviewer Response: Aliza Shalit - 1/4/24 2:28 PM Please include canopy widths on elevation as well as the words PER UDO SIGN STANDARDS next to the legend for the signs. Include lighting method (in this case face lit). ---------------------------------------------------------- Responsed by: Ben Bemis - 12/18/23 5:56 PM See architectural plans. ---------------------------------------------------------- Reviewer Response: Aliza Shalit - 5/10/23 11:38 AM Please include lighting method on description (internally lighted, face OR back lit - only one lighting method allowed for all signs). ---------------------------------------------------------- Responsed by: Ben Bemis - 4/27/23 2:43 AM Refer to Sheet A-6 for Tenant Sign locations (All signs will be Individual Channel Letters mounted on the front face of metal canopies) Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00060 ADLS Amend L'Etoile Workflow Started: 3/9/2023 4:00:48 PM Report Generated: 03/11/2024 03:04 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 4 1 Sign Permits Aliza Shalit 3/27/23 4:35 PM Comment A Sign package will be required for this ADLS Amend, including sign locations, types, spandrel dimensions, and lighting and mounting specs Responsed by: Ben Bemis - 4/27/23 2:43 AM Refer to Sheet A-6 for Tenant Sign locations (All signs will be Individual Channel Letters mounted on the front face of metal canopies) Resolved 5 1 Sign Permits Aliza Shalit 3/27/23 4:36 PM Comment All signs require a separate sign permit application and review process independent of the ADLS Amend process. Info Only 6 1 Vectren Energy Chad Miller 3/29/23 9:20 AM Changemark CenterPoint Energy Please have the developer or owner call into the new service center at 1-800- 990-1930 to have a work order created for the new gas service. We will need load information on the proposed building to size the new gas meter. Also, CenterPoint Energy will need an AutoCAD file. C500 - SITE UTILITY PLAN.pdf Info Only 7 1 Planning & Zoning Alexia Lopez 3/29/23 11:43 AM Changemark Site Data Please make sure this Site Data information is up to date as it still shows 60 units for the residential. Please make sure everything else is correct. C200 - SITE LAYOUT PLAN.pdf Responsed by: Ben Bemis - 4/26/23 4:12 PM Site Data has been updated. There are 45 proposed units. Resolved 8 1 Planning & Zoning Alexia Lopez 3/29/23 12:39 PM Changemark West and east side elevation 1st floor wall Is this a wall here? Please label the building material. A4 - ELEVATIONS.pdf Responsed by: Ben Bemis - 4/27/23 8:37 AM The Building Elevations changed since those Elevations were reviewed. East Elevation has no openings to the Covered Parking and filled with Utility Rooms and Bike Storage. West Elevation remains the same and the Knee Wall Finish has been called out on the New Elevation. Knee Wall is there to separate the Parking Drive from the exterior of the building Resolved 9 1 Planning & Zoning Alexia Lopez 3/29/23 12:40 PM Changemark Eastern drive Aisle on Perspective Rendering What is this eastern drive aisle on the Perspective Rendering? I do not see this on the site plan. A0 - PERSPECTIVE RENDERING.pdf Responsed by: Ben Bemis - 4/27/23 8:37 AM The Drive Aisle on the perspective is the drive of the adjacent property. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00060 ADLS Amend L'Etoile Workflow Started: 3/9/2023 4:00:48 PM Report Generated: 03/11/2024 03:04 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 10 1 Planning & Zoning Alexia Lopez 3/29/23 12:40 PM Changemark East Side elevation in Perspective Rendering Please update this perspective rendering to reflect what is shown on the site plan. On the site plan the sidewalk is up against the building and there is no landscaping until further toward the back. A0 - PERSPECTIVE RENDERING.pdf Responsed by: Ben Bemis - 12/18/23 2:19 PM Perspective Rendering has been updated with Landscaping against the Building removed and Sidewalk moved against Building. ---------------------------------------------------------- Responsed by: Ben Bemis - 4/27/23 2:44 AM East Side Elevation Perspective are currently being updated and will follow. Resolved 11 1 Planning & Zoning Alexia Lopez 3/29/23 2:22 PM Changemark Rear Yard Setback There is a minimum 40 ft. setback for surface parking. please adjust your plans to meet the ordinance or apply for a variance. C200 - SITE LAYOUT PLAN.pdf Responsed by: Ben Bemis - 4/26/23 4:12 PM A variance has been requested and is currently under review. Resolved 12 1 Planning & Zoning Alexia Lopez 3/29/23 2:23 PM Changemark Maximum Rear Setback There is a maximum rear setback of 20 ft. Please adjust your plans or apply for a variance with your reasons for the hardship of meeting the ordinance. C200 - SITE LAYOUT PLAN.pdf Responsed by: Ben Bemis - 4/26/23 4:13 PM ?A variance has been requested and is currently under review.? Resolved 13 1 Planning & Zoning Alexia Lopez 3/29/23 2:26 PM Changemark Side yard setback There is a minimum setback for surface parking of 40 ft. Please adjust the plans or apply for a variance with your explanation of the hardship for not meeting the UDO. C200 - SITE LAYOUT PLAN.pdf Responsed by: Ben Bemis - 4/26/23 4:13 PM A variance has been requested and is currently under review. Resolved 14 1 Planning & Zoning Alexia Lopez 3/29/23 4:52 PM Changemark Unit Count Are there 40 S2 units? I only count 30 if all the floors are the same. Please correct. A2 - FLOORS 2-4.pdf Responsed by: Ben Bemis - 4/27/23 2:44 AM Total Unit Count = 45 Units, Unit-A1 = 3, Unit- S1 = 12, Unit-S2 = 24, Unit-S3 = 3, Unit- S4 = 3 Resolved 15 1 Planning & Zoning Alexia Lopez 3/29/23 5:04 PM Changemark Short Term Bike Parking I believe with the multi-family and the retail, a minimum of 9 spaces are required. Please adjust plans. C200 - SITE LAYOUT PLAN.pdf Responsed by: Ben Bemis - 4/26/23 4:14 PM Plans have been revised and there are now 10 short term bike storage spots provided. See updated C200. Resolved 16 1 Planning & Zoning Alexia Lopez 3/29/23 5:06 PM Changemark Long Bike Storage Thank you for providing long term bike storage! The ordinance recommends 0.5 spaces for each bedroom which would be 22 spaces. Is there room to add 6 more spaces? A1 - FIRST FLOOR PLAN.pdf Responsed by: Ben Bemis - 4/26/23 4:14 PM Total of 24 Bicycle parking spaces are provided in the Bicycle storage room. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00060 ADLS Amend L'Etoile Workflow Started: 3/9/2023 4:00:48 PM Report Generated: 03/11/2024 03:04 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 17 1 Planning & Zoning Alexia Lopez 3/29/23 5:11 PM Changemark Bike parking location Short term bike parking is required to be within 50 ft. of the main entrance. Please refer to UDO Sec. 5.29.B C200 - SITE LAYOUT PLAN.pdf Responsed by: Ben Bemis - 4/26/23 4:15 PM The short term bike parking has been revised and split into two locations to be within 50' of the entrances. See updated sheet C200. Resolved 18 1 Fire Carmel Fire 3/30/23 9:38 AM Comment 3313.1 Where required. In buildings required to have standpipes by Section 905.3.1, not less than one standpipe shall be provided for use during construction. Info Only 19 1 Fire Carmel Fire 3/30/23 9:38 AM Comment Section 3312.1 Fire Hydrants shall be fully functional tested and approved prior to any combustible materials arriving on the construction site. Info Only 20 1 Fire Carmel Fire 3/30/23 9:40 AM Comment 912.3 Access. Immediate access to fire department connections shall be maintained at all times and without obstruction by fences, bushes, trees, walls or any other fixed or moveable object. Access to fire department connections shall be approved by the code official. The Fire Department Connection Shall be accessible at all times. Info Only 21 1 Planning & Zoning Alexia Lopez 3/30/23 11:23 AM Changemark Solar Panels The previous design incorporated solar-powered carports. Where are those now? C200 - SITE LAYOUT PLAN.pdf Responsed by: Ben Bemis - 4/26/23 4:16 PM Solar powered carports are no longer in the project. Resolved 22 1 Planning & Zoning Alexia Lopez 3/30/23 11:24 AM Library Comment Please list what green or sustainable site or building design aspects will implemented, similar to the LEED checklist: www.usgbc.org/leed/rating- systems from the US Green Building Council. (This is not a requirement, but the Commission looks favorably upon this.) Responsed by: Ben Bemis - 4/27/23 2:50 AM No substantial amount of green or sustainable material will be used on this project. Resolved 23 1 Engineering Alex Jordan 3/30/23 1:59 PM Comment It appears that we had completed our review of this project under ProjectDox task PZ-2020-00072 DP ADLS but were waiting on the final submittals to be provided. Will this submittal result in any changes to the civil plans and the need to re-review. If so, please have the plans uploaded with the next submittal. Responsed by: Ben Bemis - 9/1/23 10:48 AM No additional response is provided. ---------------------------------------------------------- Responsed by: Ben Bemis - 4/26/23 4:02 PM Plans were previously provided. Updates have been made and are included with this submittal. Info Only 24 1 Planning & Zoning Alexia Lopez 3/31/23 12:27 AM Comment Please Submit a Lighting Plan. Responsed by: Ben Bemis - 4/27/23 2:45 AM Refer to Sheet A-8 for Photometric Site Plan. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00060 ADLS Amend L'Etoile Workflow Started: 3/9/2023 4:00:48 PM Report Generated: 03/11/2024 03:04 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 25 1 Transportation Systems David Littlejohn 4/6/23 11:50 AM Changemark Bicycle parking access The proposed location for the bicycle racks is not accessible because of the furniture and the access point to the patio. Section 5.29 of the City's UDO specifies that bicycle parking is to be within fifty (50) feet of the main entrance and easily accessible from all trails and sidewalks with direct access. The current proposal does not provide a direct and unobstructed route to the racks from the path along Main St. Revise the plans to provide a direct and convenient route to the bicycle parking from the path. C200 - SITE LAYOUT PLAN.pdf Responsed by: Ben Bemis - 4/26/23 4:16 PM Short term bike parking has been moved to provide access from the trail. See updated C200. Resolved 26 1 Transportation Systems David Littlejohn 4/6/23 3:54 PM Changemark Rack options that don't require lifting bikes Please consider including floor mounted racks or racks that don't require someone to lift their bike along with the proposed wall racks. This will provide someone who can not lift their bike or people with heavy e-bikes to secure their bikes without having to lift them up to the wall mounted rack. A1 - FIRST FLOOR PLAN.pdf Responsed by: Ben Bemis - 4/27/23 2:47 AM So noted.The Bike Racks are stacked with 12 racks on the ground and 12 racks above. The racks over the ground mounted racks lower down to a height to make it easier to place a bike on the rack before raising again. These are the racks that the City used at the Civic Square Garage. Resolved 27 1 CrossRoad Engineers Willie Hall 4/7/23 2:41 PM Changemark 701.01 The City of Carmel requires that all water leaving a site shall be treated by a stormwater quality management system consisting of a minimum of two different BMPs. The installed stormwater quality management system shall be capable of removing a minimum of 80% of the TSS. Per Section 3.1.4 of the drainage report, water quality treatment is being provided by the proposed Aqua Swirl water quality treatment unit and storage settlement sump in the underground detention vault. Annual sediment removal for BMP's selected from the Indianapolis SQU Selection Guide shall be based on NJDEP certified flow rates for the unit selected. See also ref #31 for the MTD sizing. Testing to establish the TSS removal rate for the storage settlement sump in the underground detention vault must be conducted by an independent testing facility. Please provide calculations for removal efficiency of a number of BMPs in a series to confirm the TSS removal rate is met for this site. 192-733-Drainage Report.pdf Responsed by: Ben Bemis - 12/12/23 9:26 PM Per email from Carmel Engineering 12/5/23, calculations for the sump will not be required. ---------------------------------------------------------- Responsed by: Ben Bemis - 4/27/23 8:14 AM TSS removal calculations are provided in the Drainage Report for this requirement. Resolved 28 1 CrossRoad Engineers Willie Hall 4/7/23 5:26 PM Changemark Discrepancies There are numerous discrepancies between the outlet control structure details and the inputs on the Summary for POND UGD-6 in the drainage report, to include the orifice inverts, top of weir plate elevations, diameter of outfall pipe, diameter of OCS manhole/weir width. Please review and revise. C400 - DRAINAGE PLAN.pdf Responsed by: Ben Bemis - 4/27/23 7:46 AM The details have been revised to show the correct infromation. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00060 ADLS Amend L'Etoile Workflow Started: 3/9/2023 4:00:48 PM Report Generated: 03/11/2024 03:04 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 29 1 CrossRoad Engineers Willie Hall 4/7/23 5:26 PM Changemark OCS The OCS detail is labeled Str. 102. The plan shows the detention outlet as Str. 101 and the OCS as Str. 100. Please review and revise. C400 - DRAINAGE PLAN.pdf Responsed by: Ben Bemis - 4/27/23 7:46 AM The details have been revised to show the correct infromation. Resolved 30 1 CrossRoad Engineers Willie Hall 4/9/23 6:15 AM Changemark 102.03.i.d.i Pipe sizing calculations included in the stormwater drainage technical report shall contain Storm Basin Watershed Map, include the basin area designation corresponding to each individual inlet designation in the drainage calculations and the area in acres for each basin area. Please revise accordingly. 192-733-Drainage Report.pdf Responsed by: Ben Bemis - 4/27/23 7:46 AM The pipe sizing calculations have been revised in the Drainage Report. Resolved 31 1 CrossRoad Engineers Willie Hall 4/9/23 6:34 AM Changemark 701.04 Flow through BMPs are designed to treat runoff at a peak design flow rate through the system. On-line units must document the peak 10-year flow (per Section 305.02 of the STSM) is less than the approved maximum10-yr flow rate. See also review comment Ref #28. It appears, based on the calculations presented in the drainage report, that the 10-year flow into the proposed water quality unit exceeds the Max 10-yr On-Line Flow Rate of 2.30 cfs for the AquaSwirl XC-3. Please review and revise accordingly. 192-733-Drainage Report.pdf Responsed by: Ben Bemis - 4/27/23 7:47 AM The SQU has been sized to convey the 10-year online flow rate. Resolved 32 1 CrossRoad Engineers Willie Hall 4/9/23 6:45 AM Changemark Layout Discrepancies There are numerous discrepancies in the storm sewer layout between this Drainage Basin Map and the layout presented in the construction plans. Please review and revise. 192-733-Drainage Report.pdf Responsed by: Ben Bemis - 4/27/23 7:47 AM The Drainage maps have been updated in the Drainage Report. Resolved 33 1 CrossRoad Engineers Willie Hall 4/9/23 7:11 AM Changemark 302.02 The HydroCAD inputs for the Summary for Pond UGD (45, 50, 55) pdf pgs and Summary for Pond UGD-6 (pdf pgs 65, 71, 77, 89) found in APPENDIX F do not appear to be correct. Per the HydroCAD stormwater modeling, the âPrimaryâ device (Device #1) should be the pipe leaving the outlet control structure, with the remaining devices (control orifices and emergency overflow [5.0' long Sharp-Crested Rectangular Weir]) routed to the primary device. There are also numerous discrepancies between the outlet control structure details on Plan Sheet C400 and the inputs found in APPENDIX F and APPENDIX G. Please review and revise accordingly. 192-733-Drainage Report.pdf Responsed by: Ben Bemis - 4/27/23 7:48 AM The HydroCAD calculations have been updated to match the current drainage information. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00060 ADLS Amend L'Etoile Workflow Started: 3/9/2023 4:00:48 PM Report Generated: 03/11/2024 03:04 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 34 1 CrossRoad Engineers Willie Hall 4/9/23 8:06 AM Changemark 302.05 Per Section 3.0 STORMWATER DESIGN of the drainage report, the site will provide new pipes and structures to allow the runoff from the 1.21 acres of offsite runoff to bypass the proposed site stormwater detention, but the site layout in both the plans and drainage report (see also ref #32) indicates the offsite being routed through the detention pond. There are numerous discrepancies in the emergency overflow design between Plan Sheet C 400, the Summary for Pond UGD (45, 50, 55) pdf pgs and Summary for Pond UGD-6 (pdf pgs 65, 71, 77, 89) found in APPENDIX F and the EMERGENCY OVERFLOW CALCULATIONS found in APPENDIX G. 192-733-Drainage Report.pdf Responsed by: Ben Bemis - 4/27/23 8:17 AM The detention vault is sized to convey on-site runoff only. The offsite runoff that routes through the detention vault bypasses via the overflow weir in the outlet control structure. Resolved 35 1 CrossRoad Engineers Willie Hall 4/9/23 8:14 AM Changemark Layout Discrepancies There are numerous discrepancies in the storm sewer layout between the layout presented in the construction plans and the layout included in the drainage report. Please review and revise. C000 - TITLE SHEET.pdf Responsed by: Ben Bemis - 4/27/23 7:51 AM The storm sewer layout has been updated in the Drainage Report. Resolved 36 1 CrossRoad Engineers Willie Hall 4/9/23 8:29 AM Changemark 102.02.vii Construction plans need to include storm sewer plan/profile sheet(s). Please revise this plan sheet to include plan views for each proposed storm sewer run. C401 - STORM SEWER PROFILES & TABLES.pdf Responsed by: Ben Bemis - 4/27/23 7:53 AM These have been revised to include all pipe runs. Resolved 37 1 CrossRoad Engineers Willie Hall 4/9/23 8:29 AM Changemark 102.02.xiv A Structure Data Table shall be provided in the plan set. At a minimum, the structure data shall include, in addition to the information provided, type of structure and detail reference to type of structure and any notes related to the structure. The OCS detailed on Plan Sheet C 400 is labeled STRUCTURE #102. There are no details found for Str. 101 (Detention Outlet) on Plan Sheet C802 or in the construction plans. See ref #29 and also ref # 35. PLease review and revise accordingly. C401 - STORM SEWER PROFILES & TABLES.pdf Responsed by: Ben Bemis - 4/27/23 7:53 AM The structure data table has been updated. Resolved 38 1 CrossRoad Engineers Willie Hall 4/10/23 8:34 AM Comment Additional comments may be generated based on revisions. Info Only 39 1 Transportation Systems David Littlejohn 4/10/23 2:19 PM Changemark Bicycle parking spaces total number Based on the number of proposed bedrooms and the square footage of the retail this project is required to have 9 bicycle parking spaces. Please add one rack to the proposed bicycle parking to comply with the total number of bicycle parking spaces required in section 5.29 of the UDO. C200 - SITE LAYOUT PLAN.pdf Responsed by: Ben Bemis - 4/26/23 4:17 PM 10 short term bike parking spaces have now been provided. See updated plan sheet C200. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00060 ADLS Amend L'Etoile Workflow Started: 3/9/2023 4:00:48 PM Report Generated: 03/11/2024 03:04 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 40 1 Transportation Systems David Littlejohn 4/10/23 2:23 PM Changemark Long term bicycle parking room Will the bicycle parking room include any surveillance? Please consider including a window or some transparent feature on the door and walls so that people can see into the room before entering. C200 - SITE LAYOUT PLAN.pdf Responsed by: Ben Bemis - 4/27/23 2:46 AM Door into the Long Term Bicycle Storage will be provided with a window. Resolved 41 1 Transportation Systems David Littlejohn 4/10/23 2:35 PM Changemark ADA parking required ADA parking standards requires a minimum of 2 accessible parking spaces (with at least one of the spaces van accessible) for parking facilities with 26- 50 parking spaces. Revise the plans to include ADA compliant accessible parking spaces. C200 - SITE LAYOUT PLAN.pdf Responsed by: Ben Bemis - 4/26/23 4:18 PM 2 ADA accessible parking spaces have now been provided. 1 of which is van accessible. See revised C200 site plan and floor plan. Resolved 42 1 Planning & Zoning Alexia Lopez 4/11/23 3:53 PM Changemark North Elevation Window Sills Some of these windows don't appear to have a window sill like the windows in the middle. Is this is a mistake or a design choice? A3 - ELEVATIONS.pdf Responsed by: Ben Bemis - 4/27/23 2:46 AM Window Sills will be provided after consultation with window manufacturer. Resolved 43 1 Planning & Zoning Alexia Lopez 4/11/23 3:53 PM Changemark South Elevation Window Header Should these windows have the same window header as the other windows? Please adjust the drawings. A3 - ELEVATIONS.pdf Responsed by: Ben Bemis - 4/27/23 2:47 AM Window Headers are the same on all four sides of the building. Resolved 44 1 Planning & Zoning Alexia Lopez 4/11/23 3:56 PM Library Comment Please show how rooftop equipment will be screened from view, if applicable Responsed by: Ben Bemis - 12/18/23 2:24 PM The Rooftop Equipment are located away from the Parapet Wall and will not be visible from the street. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 6/22/23 1:56 PM It looks like this rooftop equipment projects above the parapet. Will these be visible from the street? ---------------------------------------------------------- Responsed by: Ben Bemis - 4/27/23 2:47 AM Rooftop Units are screened behind Parapet Wall (Refer to Elevations for locations – dashed) Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00060 ADLS Amend L'Etoile Workflow Started: 3/9/2023 4:00:48 PM Report Generated: 03/11/2024 03:04 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 45 2 Planning & Zoning Alexia Lopez 4/28/23 3:24 PM Library Comment For future submittals, please upload revised files with the exact same name as the file it is replacing. The software will version the file for us. This saves us time so we can easily see which files have been revised and we can compare the new and the old to see the changes that have been made. Responsed by: Ben Bemis - 2/20/24 11:35 AM Revised files of existing sheets are named to match the originally submitted sheet names. ---------------------------------------------------------- Responsed by: Ben Bemis - 9/1/23 1:52 PM Plans shall be named to match previous submissions. Resolved 46 2 Planning & Zoning Alexia Lopez 4/28/23 3:25 PM Changemark Unit count Please add the unit counts back to the floor plans. A2 - SECOND FLOOR PLAN.pdf Responsed by: Ben Bemis - 12/18/23 2:20 PM Unit Count Legend has added to A2 with a total of 33 Units. Resolved 47 2 Planning & Zoning Alexia Lopez 4/28/23 3:41 PM Changemark Material Legend I do not see a 2 in the legend though it is called out on the building. I also don't see a 3 called out on the east facade. Is there any material 3 on the east facade? Please correct. A6 - ELEVATIONS.pdf Responsed by: Ben Bemis - 12/18/23 2:24 PM "2" Callout on Legend has been removed. "3" has been added to the East Façade. Resolved 48 2 Planning & Zoning Alexia Lopez 4/28/23 3:49 PM Changemark Rooftop Equipment It looks like this rooftop equipment projects above the parapet. Will these be visible from the street? A6 - ELEVATIONS.pdf Responsed by: Ben Bemis - 12/18/23 2:24 PM The Rooftop Equipment are located away from the Parapet Wall and will not be visible from the street. Resolved 49 2 Building & Code Services Mike Sheeks 5/2/23 1:40 PM Comment Please see parking comments and provide the variance if obtained. Thank you, Mike S. Responsed by: Ben Bemis - 8/16/23 7:46 AM A variance request for parking counts has been approved by the BZA docket number PZ-2023-00084V. Resolved 50 2 CrossRoad Engineers Willie Hall 5/9/23 1:12 PM Changemark 102.02.vii Please include on the profile the existing and proposed utilities crossing the proposed storm sewer. C401 - STORM SEWER PROFILES & TABLES.pdf Responsed by: Ben Bemis - 8/16/23 7:48 AM Utility crossing have been shown on the storm sewer profile & tables sheets. Resolved 51 2 CrossRoad Engineers Willie Hall 5/9/23 1:20 PM Changemark 102.02.vii Please include HGL along the extents of the profile. C401 - STORM SEWER PROFILES & TABLES.pdf Responsed by: Ben Bemis - 12/12/23 9:33 PM HGLs are provided in the storm sewer profiles. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00060 ADLS Amend L'Etoile Workflow Started: 3/9/2023 4:00:48 PM Report Generated: 03/11/2024 03:04 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 52 2 CrossRoad Engineers Willie Hall 5/9/23 1:23 PM Changemark 305.02 the minimum diameter of all storm sewers shall be 12 inches. Under no circumstances shall the pipe be less than 12-inches diameter, measured as the inside diameter. C401 - STORM SEWER PROFILES & TABLES.pdf Responsed by: Ben Bemis - 8/16/23 7:51 AM Pipes sizes less than 12" have been modified to meet Carmel standards. Resolved 53 2 CrossRoad Engineers Willie Hall 5/9/23 1:27 PM Changemark 102.02.xi.d The grading and drainage plan shall include the delineation of all proposed land disturbing activities, including off-site activities that will provide services to the project site. C300 - SITE GRADING.pdf Responsed by: Ben Bemis - 8/16/23 8:18 AM The construction limits line has been indicated on plan sheets. Additional grading spot elevations have been indicated for all areas within the limits of construction. Resolved 54 2 CrossRoad Engineers Willie Hall 5/9/23 1:29 PM Changemark Landscaping in Swales Please verify that the proposed landscaping features will not impact the function of the perimeter swales. C300 - SITE GRADING.pdf Responsed by: Ben Bemis - 8/16/23 8:20 AM Mineral (stone) mulch will be provided around the inlets. Plantings will be offset from the center of the swale. Resolved 55 2 CrossRoad Engineers Willie Hall 5/9/23 1:36 PM Changemark 102.02.v Please include additional survey information for the existing pipe into which the proposed storm sewer will connect to where it outlets into Little Cool Creek. C100 - TOPOGRAPHIC SURVEY.pdf Responsed by: Ben Bemis - 2/20/24 9:57 AM Additional topography and storm outlet to Little Cool Creek has been added to the Existing Conditions plan, C100 and the Flood Routing Plan, C402. ---------------------------------------------------------- Reviewer Response: Willie Hall - 1/12/24 10:03 AM Per conversations with Engineering, more information about the existing pipe will need to provided. ---------------------------------------------------------- Responsed by: Ben Bemis - 12/18/23 1:33 PM We attempted to assess the condition of the outlet pipe but the area is currently overgrown and inaccessible. Resolved 56 2 CrossRoad Engineers Willie Hall 5/9/23 1:48 PM Changemark 102.03.i.b.ii Per GIS topo lines and existing storm pipe information, it appears that the all or most of the Warthog Cabbage LLC, American Legion, and Strip Mall/Gas Station parcels runoff is collected and routed through the existing storm sewer that runs along the west side of the subject property. Please revise offsite runoff accordingly. 192-733-Drainage Report.pdf Responsed by: Ben Bemis - 12/12/23 9:36 PM These areas have been added to the pipe sizing and detention calculations. Please see the revised Drainage Report. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00060 ADLS Amend L'Etoile Workflow Started: 3/9/2023 4:00:48 PM Report Generated: 03/11/2024 03:04 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 57 2 CrossRoad Engineers Willie Hall 5/9/23 1:54 PM Changemark 102.03.i Please include rainfall intensity table. 192-733-Drainage Report.pdf Responsed by: Ben Bemis - 12/12/23 9:37 PM This can be found in Appendix D of the revised Drainage Report. Resolved 58 2 CrossRoad Engineers Willie Hall 5/9/23 1:58 PM Changemark Direct Discharge On-site direct discharge collected by Str 100 and 112 will need to be taken into account in the overall allowable site release rate. 192-733-Drainage Report.pdf Responsed by: Ben Bemis - 12/12/23 9:38 PM There is a minimal direct discharge area south of the retaining wall south of the parking area. This area cannot be captured and detained. However, the detention system is capturing a considerable amount of offsite runoff. The detention system is sized to include all areas of the property including the direct discharge area. The remainder is by-passed through the system. Calculations can be found in the Drainage Report. Resolved 59 2 CrossRoad Engineers Willie Hall 5/9/23 2:04 PM Changemark 102.03.i.d Please utilize discharge rates included in the Main Street Plaza drainage report. 192-733-Drainage Report.pdf Reviewer Response: Willie Hall - 1/11/24 3:19 PM The Main Street Plaza drainage report has been uploaded for reference. Since the pipe sizing calculations account for a higher flow than the detained release rate per the Main Street Plaza drainage report, this comment is resolved. ---------------------------------------------------------- Responsed by: Ben Bemis - 12/12/23 9:39 PM This information is not available therefore a calculation for this area is included in the Drainage Report. Resolved 60 2 CrossRoad Engineers Willie Hall 5/9/23 2:17 PM Changemark 102.03.i.d Please revise pipe calculations based on additional information requested in comment Ref.# 56 192-733-Drainage Report.pdf Responsed by: Ben Bemis - 12/12/23 9:39 PM These areas have been added to the pipe sizing and detention calculations. Please see the revised Drainage Report. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00060 ADLS Amend L'Etoile Workflow Started: 3/9/2023 4:00:48 PM Report Generated: 03/11/2024 03:04 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 61 2 CrossRoad Engineers Willie Hall 5/9/23 2:19 PM Changemark 102.03.ii.h Please include a narrative and photographic record of the condition of the downstream receiving system and a report of the expected impact of the developmentâÃÂÃÂs stormwater runoff or any receiving stream or downstream property. The drainage report shall include information analysis on the 18" RCP further downstream on the Guilford Rd Townhome property to verify there is no choke point between the site outlet and the creek. 192-733-Drainage Report.pdf Responsed by: Ben Bemis - 2/20/24 11:17 AM Drainage report has been updated to include photos and downstream analysis of 18" RCP. See drainage report. ---------------------------------------------------------- Responsed by: Ben Bemis - 12/18/23 1:33 PM We attempted to assess the condition of the outlet pipe but the area is currently overgrown and inaccessible. Resolved 62 2 CrossRoad Engineers Willie Hall 5/9/23 2:32 PM Changemark 102.03.ii.i Please make note of any local, state and/or federal water quality permits required. 192-733-Drainage Report.pdf Responsed by: Ben Bemis - 12/12/23 9:42 PM This note has been added to the narrative. Resolved 64 2 CrossRoad Engineers Willie Hall 5/9/23 2:42 PM Changemark 104.01.1 All swales shall be installed with a subsurface drain. C300 - SITE GRADING.pdf Responsed by: Ben Bemis - 9/1/23 12:05 PM Subsurface drains are provided for all swales. The swale along W. Main Street has been removed to provide for on-street parking. Resolved 65 2 CrossRoad Engineers Willie Hall 5/9/23 2:43 PM Changemark MFPG Please include MPFG and MLAG on Grading Plan. C300 - SITE GRADING.pdf Responsed by: Ben Bemis - 2/20/24 9:58 AM A formal waiver request was prepared and sent to Caleb Werner. The waiver request was also uploaded to Project Dox. ---------------------------------------------------------- Reviewer Response: Willie Hall - 1/11/24 3:27 PM MFPG shall be 1' above the highest ponding elevation. Please revise MFPG and FFE or provide formal waiver request if these cannot be met. ---------------------------------------------------------- Responsed by: Ben Bemis - 12/12/23 9:46 PM This has been added to the grading plan. Resolved 66 2 CrossRoad Engineers Willie Hall 5/9/23 2:48 PM Changemark 302.06.7 The city will allow a minimum orifice size of 2". 192-733-Drainage Report.pdf Responsed by: Ben Bemis - 12/12/23 9:47 PM Comment noted. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00060 ADLS Amend L'Etoile Workflow Started: 3/9/2023 4:00:48 PM Report Generated: 03/11/2024 03:04 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 67 2 CrossRoad Engineers Willie Hall 5/9/23 2:55 PM Changemark 102.03.ii.f Please include in summary: on-site runoff vs off-site bypass running through detention, direct discharge runoff, 90% drawdown time 192-733-Drainage Report.pdf Responsed by: Ben Bemis - 12/14/23 1:23 PM The result of these calculations is summarized in the Drainage Report narrative. The calculations can be found in Appendix F. Resolved 68 2 CrossRoad Engineers Willie Hall 5/9/23 3:09 PM Changemark 302.11 Please include outlet control structure input information and only the 100-yr x1.25 flow is necessary to be evaluated. The emergency overflow will be re- examined after the off-site drainage has been revised. 192-733-Drainage Report.pdf Responsed by: Ben Bemis - 12/14/23 9:17 AM The emergency overflow calculations have been updated in the Drainage Report. Please see Appendix G. Resolved 69 2 CrossRoad Engineers Willie Hall 5/9/23 3:23 PM Changemark 303.02 Please verify that all channels and swales can accommodate, as a minimum, peak runoff from a 10-year return frequency storm calculated based on methodology described in Section 201.02. For Rational Method analysis, the storm duration shall be equal to the time of concentration for the drainage area. In computer-based analysis, the duration is as noted in the applicable methodology associated with the computer program. 192-733-Drainage Report.pdf Responsed by: Ben Bemis - 12/14/23 8:01 AM The swale calculations have been added to Appendix D. Resolved 70 2 CrossRoad Engineers Willie Hall 5/9/23 3:30 PM Changemark 303.07 Please include the remaining off-site flood routing to verify that buildings on the adjacent property aren't in danger of flooding. C402 - FLOOD ROUTING PLAN.pdf Responsed by: Ben Bemis - 12/15/23 9:12 AM Flood routing south of the project site is a current condition not impacted by this project. Resolved 71 2 CrossRoad Engineers Willie Hall 5/9/23 3:32 PM Changemark 304.01 The developer shall confirm the sizing of the existing roadway culverts of the roadways across the frontage of the development. All culverts under the perimeter roadways of a development shall be removed and replaced in order to convey the 100-year storm rain event from the portion of the site draining to the culvert and the 100-year storm rain event from the upstream contributing areas, regardless if the development is not discharging to these culverts. In the event that the culverts are adequate, the City reserves the right to request removal and replacement of the culvert if the culvert is determined by the City to be in an unacceptable state of repair. 192-733-Drainage Report.pdf Responsed by: Ben Bemis - 2/20/24 9:58 AM Main Street right-of-way improvements are currently in design by HWC. Per our discussion with HWC they are including this information with the revised plans. ---------------------------------------------------------- Reviewer Response: Willie Hall - 1/12/24 9:51 AM Please provide Main Street plans and revised drainage patterns if that is the case. ---------------------------------------------------------- Responsed by: Ben Bemis - 12/14/23 8:03 AM Since the start of the project considerable work has been by the City of Carmel including the construction of a new roundabout and infrastructure at Main St. & Guilford Rd. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00060 ADLS Amend L'Etoile Workflow Started: 3/9/2023 4:00:48 PM Report Generated: 03/11/2024 03:04 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 72 2 CrossRoad Engineers Willie Hall 5/9/23 3:42 PM Changemark 305.05 Rim elevations of structures upstream of the detention facility shall be above the 100-YR storage elevation. C401 - STORM SEWER PROFILES & TABLES.pdf Responsed by: Ben Bemis - 12/15/23 9:13 AM Per Carmel Engineering email a check valve may be considered to prevent surcharging from the detention system. Resolved 73 2 CrossRoad Engineers Willie Hall 5/9/23 3:44 PM Changemark 306.02 there shall be no trees or shrubs planted, nor any structures or fences erected, in any drainage easement, unless otherwise accepted by the City of Carmel. C700 - SITE LANDSCAPE PLAN.pdf Responsed by: Ben Bemis - 9/1/23 11:01 AM The site landscape plan has been modified to shift plantings outside of the drainage easement. Resolved 74 2 CrossRoad Engineers Willie Hall 5/9/23 3:50 PM Changemark 501.01 there should be no less than 2.5 feet of cover along any part of the pipe from final pavement elevation or final ground surface elevation to the top of the pipe. C401 - STORM SEWER PROFILES & TABLES.pdf Responsed by: Ben Bemis - 12/12/23 9:48 PM A waiver will be requested for this requirement. Resolved 75 2 CrossRoad Engineers Willie Hall 5/10/23 11:34 AM Changemark 303.07 Please include ponding limits and elevations for these inlets to confirm MFPG. C402 - FLOOD ROUTING PLAN.pdf Responsed by: Ben Bemis - 2/20/24 9:58 AM A formal waiver request was prepared and sent to Caleb Werner ---------------------------------------------------------- Reviewer Response: Willie Hall - 1/11/24 4:15 PM MFPG shall be 1' above the highest ponding elevation. Please revise MFPG and FFE or provide formal waiver request if these cannot be met. ---------------------------------------------------------- Responsed by: Ben Bemis - 12/12/23 9:48 PM Ponding limits have been added to these structures. Resolved 76 2 CrossRoad Engineers Willie Hall 5/10/23 11:35 AM Changemark 303.07 This overflow path and tag appears to be left over from the previously submitted plans. Please revise. C402 - FLOOD ROUTING PLAN.pdf Responsed by: Ben Bemis - 12/12/23 9:51 PM This has been removed. Resolved 77 2 CrossRoad Engineers Willie Hall 5/10/23 11:38 AM Changemark Underdrain Underdrain per City Standard Drawings shall be added/moved under the curb. C400 - DRAINAGE PLAN.pdf Responsed by: Ben Bemis - 9/1/23 12:27 PM Underdrains are shown under all curbs. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00060 ADLS Amend L'Etoile Workflow Started: 3/9/2023 4:00:48 PM Report Generated: 03/11/2024 03:04 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 78 2 CrossRoad Engineers Willie Hall 5/10/23 11:40 AM Changemark 102.03 Proposed detention shall be considered for the full R/W along the property frontage, not just half. 192-733-Drainage Report.pdf Responsed by: Ben Bemis - 12/12/23 9:52 PM The calculations have been revised to reflect this. Resolved 79 2 Sign Permits Aliza Shalit 5/10/23 11:42 AM Comment Will this parking lot be private (for tenant use only?). Please see parking sign criteria in the correspondence folder - for public parking. Reviewer Response: Aliza Shalit - 1/4/24 2:25 PM ---------------------------------------------------------- Responsed by: Ben Bemis - 12/13/23 8:16 AM The parking lot is intended to be private. Question 80 2 CrossRoad Engineers Willie Hall 5/10/23 11:44 AM Changemark 306.02 Easements will be required for off-site overflow paths will be required. C402 - FLOOD ROUTING PLAN.pdf Responsed by: Ben Bemis - 2/20/24 11:24 AM The southern adjoiner has drainage easements already in place. See drainage easement exhibit included in the correspondence folder of ProjectDox. ---------------------------------------------------------- Reviewer Response: Willie Hall - 1/11/24 4:16 PM This comment will remain unresolved pending result of discussion with Engineering. ---------------------------------------------------------- Responsed by: Ben Bemis - 12/15/23 9:13 AM An easement exists for the MIG Guilford Reserve property. Any additional stormwater easements will be discussed with Carmel Engineering. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00060 ADLS Amend L'Etoile Workflow Started: 3/9/2023 4:00:48 PM Report Generated: 03/11/2024 03:04 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 81 2 CrossRoad Engineers Willie Hall 5/10/23 11:47 AM Changemark 306.02 Please show off-site drainage easement if one exists. If none exists, an easement will be required. C402 - FLOOD ROUTING PLAN.pdf Responsed by: Ben Bemis - 2/20/24 11:26 AM An off-site drainage easement exhibit has been uploaded to Project Dox. ---------------------------------------------------------- Reviewer Response: Willie Hall - 1/11/24 4:18 PM This comment will remain unresolved pending result of discussion with Engineering. ---------------------------------------------------------- Responsed by: Ben Bemis - 12/15/23 9:15 AM An easement exists for the MIG Guilford Reserve property. Any additional stormwater easements will be discussed with Carmel Engineering. Resolved 82 2 CrossRoad Engineers Willie Hall 5/10/23 11:49 AM Changemark 700 Please provide Water Quality volume calculations for the settlement sump in the UGD. 192-733-Drainage Report.pdf Responsed by: Ben Bemis - 12/12/23 9:26 PM Per email from Carmel Engineering 12/5/23, calculations for the sump will not be required. Resolved 83 2 Engineering Alex Jordan 5/10/23 1:07 PM Changemark Please place the SWPPP narrative in the States format (Sections A, B, and C) We no longer use this format and ask that narratives be placed in the States format to comply with the construction stormwater general permit. C902 - STORMWATER POLLUTION & PREVENTION NOTES.pdf Responsed by: Ben Bemis - 9/1/23 10:46 AM Notes have been updated to the current format for the construction stormwater general permit. Resolved 84 2 Engineering Alex Jordan 5/10/23 1:07 PM Changemark Please revise this section The water quality unit size does not match what is shown on the plans and we are unable to locate the bioswale plantings. We would also like for the sumped portion of the underground vault to be listed here. C902 - STORMWATER POLLUTION & PREVENTION NOTES.pdf Responsed by: Ben Bemis - 2/20/24 11:30 AM The sump portion of the underground detention vault has been added to the notes on sheet C902. ---------------------------------------------------------- Responsed by: Ben Bemis - 9/1/23 10:59 AM The BMPs are listed in the notes to the current construction stormwater general permit format per IDEM. Resolved 85 2 Engineering Alex Jordan 5/10/23 1:13 PM Library Comment Please provide the anticipated start construction date in a comment letter or project summary Responsed by: Ben Bemis - 9/1/23 10:44 AM The anticipated start construction date is shown on the title sheets with the project summary. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00060 ADLS Amend L'Etoile Workflow Started: 3/9/2023 4:00:48 PM Report Generated: 03/11/2024 03:04 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 86 2 Engineering Alex Jordan 5/10/23 1:13 PM Library Comment Please verify that there are no direct discharge areas Responsed by: Ben Bemis - 12/12/23 9:30 PM There is a minimal direct discharge area south of the retaining wall south of the parking area. This area cannot be captured and detained. However, the detention system is capturing a considerable amount of offsite runoff. The detention system is sized to include all areas of the property including the direct discharge area. The remainder is by-passed through the system. Calculations can be found in the Drainage Report. Resolved 87 2 Engineering Alex Jordan 5/10/23 1:13 PM Library Comment Please clearly show the construction limits on all sheets with plan view (not required on profile sheets) Responsed by: Ben Bemis - 9/1/23 10:41 AM Construction limits are shown on all plan sheets. Resolved 88 2 Engineering Alex Jordan 5/10/23 1:13 PM Library Comment Please verify that all elevations are North American Vertical Datum of 1988 (NAVD) Responsed by: Ben Bemis - 9/1/23 10:40 AM Benchmark data on sheet C100 indicates vertical datum is 1988 (NAVD) Resolved 89 2 Engineering Alex Jordan 5/10/23 1:13 PM Library Comment Please verify that the horizontal datum of topgraphic map is Indiana State Plane Coordinates, NAD83 Responsed by: Ben Bemis - 9/1/23 10:38 AM Benchmark data on sheet C100 indicates horizontal datum is in the Indiana State Plane Coordinate system. Resolved 90 2 Engineering Alex Jordan 5/10/23 1:13 PM Library Comment Please verify that the locations of existing utilities with top of curb and invert elevations, pipe sizes, and direction are shown Responsed by: Ben Bemis - 9/1/23 10:33 AM Existing utilities, top of curb and invert elevations, pipe sizes are shown on plans. Resolved 91 2 Engineering Alex Jordan 5/10/23 1:13 PM Library Comment Please verify that all existing culverts, pipes, and bridges on existing drives or under the roadway are shown indicating size, type, and invert elevations Responsed by: Ben Bemis - 9/1/23 10:01 AM All existing pipes for culverts and storm systems are shown on the plans with labels to identify size, type, and inverts. Resolved 92 2 Engineering Alex Jordan 5/10/23 1:13 PM Library Comment Please verify that the locations of all existing electrical power vaults, transformers, power lines, gas lines, television cable , and telephone lines are shown Responsed by: Ben Bemis - 9/1/23 9:59 AM All existing utilities are shown on the plans. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00060 ADLS Amend L'Etoile Workflow Started: 3/9/2023 4:00:48 PM Report Generated: 03/11/2024 03:04 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 93 2 Engineering Alex Jordan 5/10/23 1:18 PM Changemark Board of Public Works and Safety approval needs for closures or restrictions Any closures or restrictions of the street or walk will need to be approved by the BPW. Please have a request letter for any of these items provided with the next submittal. C102 - SITE DEMOLITION PLAN.pdf Responsed by: Ben Bemis - 12/15/23 9:18 AM Comment noted. A closure request will be submitted. Resolved 94 2 Engineering Alex Jordan 5/10/23 1:33 PM Changemark A consent to encroach will need to be applied for to have these items within ROW This can be applied for here: https://cw.carmel.in.gov/PublicAccess/template/Login.aspx C200 - SITE LAYOUT PLAN.pdf Responsed by: Ben Bemis - 2/20/24 11:30 AM The consent to encroach has been applied for on the public access site. The document has went to the owner for signature. ---------------------------------------------------------- Reviewer Response: Alex Jordan - 1/10/24 10:39 AM We will still need this applied for to have the outdoor seating areas, fencing, and planting beds within the right-of-way. ---------------------------------------------------------- Responsed by: Ben Bemis - 9/1/23 9:54 AM The site furniture items have been removed from the plans. Resolved 95 2 Engineering Alex Jordan 5/10/23 1:33 PM Changemark Please complete the right-of-way deed and dedication form that was uploaded to the correspondence folder Please have this completed and resubmitted along with a legal description and exhibit. C200 - SITE LAYOUT PLAN.pdf Responsed by: Ben Bemis - 2/20/24 11:32 AM The right-of-way deed and dedication form has been prepared and once signatures are ready will will provide. ---------------------------------------------------------- Reviewer Response: Alex Jordan - 1/10/24 10:38 AM We will leave this item unresolved until the requested documentation is provided. ---------------------------------------------------------- Responsed by: Ben Bemis - 12/18/23 5:59 PM This will be submitted. Resolved 96 2 Engineering Alex Jordan 5/10/23 1:45 PM Changemark What will this underdrain be collecting? It appears that this area is sloped at 8% towards the roadway and there will be no standing water here. What will this underdrain be collecting? C300 - SITE GRADING.pdf Responsed by: Ben Bemis - 9/1/23 9:49 AM Off site roadway parallel parking has been requested. There will not be a swale in this location. The underdrain has been removed from the plan. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00060 ADLS Amend L'Etoile Workflow Started: 3/9/2023 4:00:48 PM Report Generated: 03/11/2024 03:04 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 97 2 Engineering Alex Jordan 5/10/23 1:57 PM Changemark Please provide a detail for the wheel wash station C101 - TEMPORARY STORMWATER POLLUTION PREVENTION PLAN.pdf Responsed by: Ben Bemis - 9/1/23 9:46 AM A temporary wheel wash station detail has been added to sheet C901. A reference to the detail has been added to the plan note. Resolved 98 2 Engineering Alex Jordan 5/10/23 2:01 PM Changemark Commercial driveway radii are to be 30' Per Carmel Standard Drawing 10-22, the radii must be 30'. Please revise. C200 - SITE LAYOUT PLAN.pdf Responsed by: Ben Bemis - 9/1/23 9:47 AM A waiver request letter has been uploaded to the correspondence folder. Info Only 99 2 Engineering Alex Jordan 5/10/23 2:08 PM Changemark Please show the ponding limits for these inlets in the 100-year clogged condition C402 - FLOOD ROUTING PLAN.pdf Responsed by: Ben Bemis - 12/12/23 9:55 PM Ponding limits have been added to these structures. Resolved 100 2 Engineering Alex Jordan 5/10/23 2:08 PM Changemark An easement will need to be granted by the adjacent property owners in order to have the ponding on their property Please provide approval from the adjacent property owners and show the drainage easement on the next submittal. C402 - FLOOD ROUTING PLAN.pdf Responsed by: Ben Bemis - 2/20/24 11:33 AM See included drainage easement exhibit showing the existing drainage easements currently in place. ---------------------------------------------------------- Reviewer Response: Alex Jordan - 1/10/24 11:31 AM Please have this easement shown on the plans and confirm that it is a drainage easement. ---------------------------------------------------------- Responsed by: Ben Bemis - 12/15/23 9:32 AM An easement exists for the MIG Guilford Reserve property. Any additional stormwater easements will be discussed with Carmel Engineering. Resolved 101 2 Engineering Alex Jordan 5/10/23 2:13 PM Changemark This flood routing appears to be for the previously proposed entrance The flood routing is shown following the curb line of the previously proposed entrance. Please revise to show the routing with the current design. C402 - FLOOD ROUTING PLAN.pdf Responsed by: Ben Bemis - 12/12/23 9:56 PM This has been removed. Resolved 102 2 Engineering Alex Jordan 5/10/23 2:19 PM Changemark Please show the location of the roof drains on this sheet C500 - SITE UTILITY PLAN.pdf Responsed by: Ben Bemis - 9/1/23 12:29 PM Roof drain locations have been labeled on the plans. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00060 ADLS Amend L'Etoile Workflow Started: 3/9/2023 4:00:48 PM Report Generated: 03/11/2024 03:04 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 103 2 Engineering Alex Jordan 5/10/23 2:55 PM Changemark Please clearly call out the BMPs on this sheet C900 - POST STORMWATER POLLUTION PREVENTION PLAN.pdf Responsed by: Ben Bemis - 12/12/23 9:57 PM BMP labels have been added. Resolved 104 2 Engineering Alex Jordan 5/10/23 2:59 PM Changemark Please reference the sumped area of the detention here 192-773 - O&M Manual.pdf Responsed by: Ben Bemis - 12/14/23 8:03 AM The sump has been added to the list. Resolved 105 2 Engineering Alex Jordan 5/10/23 2:59 PM Changemark Please include the size of the unit in this list 192-773 - O&M Manual.pdf Responsed by: Ben Bemis - 12/14/23 8:04 AM The unit size has been indicated in the list. Resolved 106 2 Engineering Alex Jordan 5/10/23 2:59 PM Changemark Please label this as a BMP easement on the site map 192-773 - O&M Manual.pdf Responsed by: Ben Bemis - 12/14/23 8:04 AM The BMP easement has been labeled in the revised BMP map. Resolved 107 2 Transportation Systems David Littlejohn 5/11/23 11:27 AM Comment Please ensure that the bike storage room's ceiling will be high enough to fit large bikes when they are stored on the top rack. In some instances the specs provided by the manufacturer do not allow for enough space for a larger bike to be stored on the top racks. Info Only 108 2 Planning & Zoning Alexia Lopez 6/22/23 2:02 PM Changemark Lighting Levels Please reduce lighting levels to 0.1 foot candles to reduce light pollution onto the residential properties to the south and west. A8 - PHOTOMETRIC PLAN.pdf Responsed by: Ben Bemis - 12/18/23 2:24 PM The Photometric Plan has been updated to reduce the foot candles on the South and East side to 0.1. Refer to Sheet A8. Resolved 109 2 Planning & Zoning Alexia Lopez 6/22/23 2:02 PM Changemark Lighting Levels on South Please reduce lighting levels to 0.1 foot candles to reduce light pollution onto the residential properties to the south and west. A8 - PHOTOMETRIC PLAN.pdf Responsed by: Ben Bemis - 12/18/23 2:25 PM The Photometric Plan has been updated to reduce the foot candles on the South and East side to 0.1. Refer to Sheet A8. Resolved 110 2 Planning & Zoning Alexia Lopez 6/22/23 2:40 PM Comment Please upload most recent set of plans showing revised parking. Responsed by: Ben Bemis - 9/1/23 1:48 PM Plans have been updated to show revised parking. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00060 ADLS Amend L'Etoile Workflow Started: 3/9/2023 4:00:48 PM Report Generated: 03/11/2024 03:04 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 111 2 Planning & Zoning Alexia Lopez 6/22/23 2:41 PM Comment Please upload a site plan showing the on-street parking spaces. Responsed by: Ben Bemis - 9/1/23 1:48 PM Plans have been updated to show revised parking. Resolved 112 3 Urban Forestry Daren Mindham 12/20/23 1:31 PM Changemark remove landscaping This landscaping is not in front of the parcel in review. This landscaping may also be a vision clearance issue for the neighboring entrance. Please remove this landscaping. C700 - SITE LANDSCAPE PLAN.pdf Responsed by: Ben Bemis - 2/20/24 11:36 AM The landscape plan, C700 has been updated. See revised sheet. Resolved 113 3 Urban Forestry Daren Mindham 12/20/23 1:31 PM Changemark species change Please change this to a Japanese tree lilac 'ivory silk'. A clump serviceberry may be a clearance issue. C700 - SITE LANDSCAPE PLAN.pdf Responsed by: Ben Bemis - 2/20/24 11:37 AM This has been updated to a Japanese tree lilac 'ivory silk'. See revised landscape plan. Resolved 114 3 Planning & Zoning Alexia Lopez 1/10/24 2:04 PM Changemark Change Unit Count on Title Sheet I believe the Unit count is now 33 units. Please update this on the Title Sheet C000 - TITLE SHEET.pdf Responsed by: Ben Bemis - 2/20/24 11:35 AM Unit counts have been updated. See revised C000 sheet. Resolved 115 3 Engineering Alex Jordan 1/11/24 8:36 AM Comment The City Engineer has as that you reach out to our contact for the Main Street project, Joe Wright (jwright@hwcengineering.com), to discuss the drainage being incorporated with the roadway project. There might have been features included that would assist this project with the drainage concerns that were emailed to us on 11/29. Responsed by: Ben Bemis - 2/20/24 11:34 AM We have met with Joe Wright at HWC regarding the Main Street Improvements. We have also shared our CAD files and will continue coordination as the Main Street design continues. Resolved 116 3 CrossRoad Engineers Willie Hall 1/11/24 3:33 PM Changemark OCS Detail OCS detail not found on sheet 802. C401A - STORM SEWER PROFILES & TABLES.pdf Responsed by: Ben Bemis - 2/20/24 11:26 AM The outlet control structure is located on sheet C400. C401A has been updated to reflect this. Resolved 117 3 CrossRoad Engineers Willie Hall 1/12/24 10:01 AM Changemark Downstream Restriction Please analyze the entire storm sewer/detention system with the downstream restriction since the 15" pipe cannot pass the 10-year on-site + off-site flow to verify no adverse impacts to the site. 192-733-Drainage Report.pdf Responsed by: Ben Bemis - 2/20/24 6:48 PM The 15" downstream pipe has been analyzed and included with the emergency overflow calculations in Appendix G. Please see the revised Drainage Report. Resolved 118 4 Sign Permits Aliza Shalit 2/23/24 4:07 PM Changemark Number of signs Please confirm there will only be 3 lower level tenant sign locations allowed on this facade. If locations are not outlined on sign package, signage will not be permitted. A6 - ELEVATIONS.pdf Responsed by: Ben Bemis - 3/7/24 11:24 AM Only 3 Tenant Signs are required as indicated on the North Elevation. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00060 ADLS Amend L'Etoile Workflow Started: 3/9/2023 4:00:48 PM Report Generated: 03/11/2024 03:04 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 119 4 Sign Permits Aliza Shalit 2/23/24 4:07 PM Changemark Sign package Details All sign package details must be recorded either on this elevation drawing (with specifics) or on a separate document outlining mounting and lighting requirements, as well as any other specific design requirements such as color, raceway size, etc. (similar as the response to Staff comments in this review). Please also include that signs are to be made up of individual channel letters on elevation notes or written up sign package. A6 - ELEVATIONS.pdf Responsed by: Ben Bemis - 3/7/24 11:24 AM Refer to Tenant Sign Notes (Legend) Resolved 120 4 Sign Permits Aliza Shalit 2/23/24 4:07 PM Changemark Sign Standards Please include that "Proposed signage must be designed following UDO Sign Standards for canopy signs" as part of the sign package specifications. A6 - ELEVATIONS.pdf Responsed by: Ben Bemis - 3/7/24 11:24 AM Note added: “Proposed Signage must be designed following UDO Sign Standards for Canopy Signs” Resolved 121 4 Sign Permits Aliza Shalit 2/23/24 4:07 PM Changemark Building Signage Will a building sign (wall or blade) be proposed (apart from tenant signage)? A6 - ELEVATIONS.pdf Responsed by: Ben Bemis - 3/6/24 4:00 PM No building sign (wall or blade) will be required on this building Resolved 122 4 Engineering Alex Jordan 3/6/24 12:43 PM Comment We have no further comments on the plans. Before we can issue a stormwater management permit, the following items will need to be provided: 1. A signed and recorded O&M manual 2. An erosion control engineers estimate 3. A non-expiring erosion control performance bond for 100% of the approved estimate 4. A right-of-way improvement engineers estimate 5. A non-expiring right-of-way improvement performance bond for 100% of the approved estimate 6. A signed and completed BMP easement agreement with exhibits and legal description 7. A completed right-of-way deed and dedication with exhibits and legal description Info Only 123 5 Sign Permits Aliza Shalit 3/8/24 10:21 AM Changemark Canopy Signs Please update text for item 12 (signage) as follows: Signage to be designed to follow UDO Sign Standards for Canopy Signs. a)Signage will consist of Back lit (halo lit) 3" Deep Individual Channel Letter illuminated with White LED's. Letter Face to be Aluminum and painted to match "Satin White" mounted on 1/8" Aluminum Light Splash Backer painted to match "Draconia Satin" (MP40821). b)Letters to be mounted on (2) 2"x2" Aluminum Tubes Raceways, spaced 6" apart. A6 - ELEVATIONS.pdf Info Only