HomeMy WebLinkAboutP-102 - WATER AND OIL PIPING PLANAUTOMATIC DETERGENT DISPENSER WITH INTERNAL AIR GAP BACKFLOW PREVENTION. DISPENSER AND SUPPLY HOSE PROVIDED AND INSTALLED BY OTHERS.P-16 3-WAY VALVE. SEE P-901.ALIGN OUTLETS WITH SPOUT.HOSE THREAD ADAPTER. SEE P-16 ON SHEET P-901.VACUUM BREAKER. PERMANENTLY ATTACH BY TIGHTENING BREAKAWAY SET SCREW.HOSE THREADADAPTER.SUPPLY HOSE, BY OTHERS.FAUCET P-7T & S MODEL 43-072 POLISHED CHROME HOSE THREAD ADAPTOR W/ CLOSE NIPPLE. SEE P-7.3/4" POLISHED CHROME 90 DEG ELBOW W/ CLOSE NIPPLE.1.2.3.4.5.6.7.8.COORDINATE VENT TERMINAL LOCATIONS WITH FRESH AIR HOODS ON ROOFTOP EQUIPMENT SO AS TO MAINTAIN MINIMUM 15'-0'' CLEARANCE.HOLD ALL PIPING ABOVE THE CEILING TIGHT TO STRUCTURE. DUCT LOCATIONS TAKE PRIORITY. SEE DRAWING M-201 FOR DUCT LAYOUT. COORDINATE CONFLICTS WITH GC.SEE K-SHEET ELEVATIONS FOR KITCHEN EQUIPMENT WATER PIPING ROUGH-IN LOCATIONS.SEE SHEET P-211 FOR BEVERAGE CONDUIT PIPING.SEE RISER DIAGRAM 1/P-301 FOR VENT PIPING. SEE ROOF PLAN 1/P-250 FOR VENT THRU ROOF (VTR) LOCATION. VERIFY WALL TYPE AND WALL THICKNESS AT EXTERIOR HOSE BIBBS PRIOR TO ORDERING EQUIPMENT.WATER HEATER PIPING IS SHOWN FOR STATE/A.O. SMITH MODELS WITH SIDE INLET/OUTLET CONNECTIONS. ADJUST PIPING AS NEEDED TO ACCOMODATE OTHER CONNECTION POINTS WHEN ALTERNATE MODELS ARE PROVIDED.COORDINATE ABOVE-CEILING PIPING LOCATIONS AND ROUTING WITH HVAC CONTRACTOR AND M-SHEETS PRIOR TO INSTALLATION. ALL MAIN DUCT TRUNK LOCATIONS SHALL TAKE PRIORITY. PIPING MAY REQUIRE REMOVAL AND REINSTALLATION AT PLUMBING CONTRACTOR'S EXPENSE IF PIPING OBSTRUCTS THE M-SHEET DUCT LAYOUT AS SHOWN OR PREVENTS ACCESS TO GREASE DUCT CLEANOUT OPENINGS. 3. SHEET NOTESINSTALL PIPING TIGHT TO WALL SO AS NOT TOINTERFERE WITH COOLER AND FREEZER SHELVES.PROVIDE UNION FITTINGS IMMEDIATELYDOWNSTREAM OF CONNECTION TO EVAPORATORS.WALK-IN CONDENSATE PIPING NOTES:POSITION VALVES AND TRIM IN WATER HEATER CLOSET SUCH THATVISIBLE OBSERVATION OF VALVES AND TRIM IS UNOBSTRUCTED AND SUCH THAT ACCESS FOR OPERATION OR REPAIR IS POSSIBLE WITHOUT USE OF STEP LADDERS OR ANY NEED TO DISASSEMBLE ANY COMPONENTS.NOTE TO WATER HEATER INSTALLER:P-111" CW3/4" CW1" CWKITCHEN EQUIPMENT NO. SEE KITCHEN EQUIPMENT SCHEDULE ON DWG P-303 FOR EQUIPMENT DESCRIPTIONS.XXXP-11 MOUNTED 24" AFG. VERIFY WALL THICKNESS PRIOR TO ORDERING, TYP.1/2'' HW & CW DOWN TO P-5, TYP.UNLESS NOTED OTHERWISE, WATER PIPING SHALL BE COPPER OR CPVC AS LISTED IN SPECIFICATIONS. SEE SPECIFICATIONS ON DRAWING P-901.3/4" TYPE L COPPER. PROVIDE 12'' OF FALL BEFORE PENETRATING WALL PANEL. COVER WITH 1-3/8" I.D. X 3/4" ARMACELL A/P ARMAFLEX OVER HEAT TRACE CABLE.PROVIDE 2" DEEP TRAP WITH OPEN TEE AT OUTLET.STOP/BFP PANEL. #318A. SEE 1/P-302.3/4'' P-28 BALL VALVE, SEE 1/P-302.1/2'' HW & CW TO P-6METERS AND BACKFLOW PREVENTERS. SEE 4/P-303.P-12P-6P-5P-8FIRE SPRINKLER RISER.SHOWN HERE FORREFERENCE ONLY.367F368FW367305P-11P-301" CWP-41HP-16P-9P-9365365FP-5370P-7363WATER FILTER ASSEMBLY3501" CW, 1" HW & 1/2" HWR TO WATER HEATER P-19. SEE 6/P-303.1/2" TEPID WATER TO EYEWASH #360E3/4'' FW2 DOWN TO (2) P-23 STOPS AT ICE MAKERS. SEE 2/P-201.380P-2P-3P-2P-1DININGSERVINGDRIVE-THRUWOMENSMENSRR VEST.KITCHENSERVICEOFFICEVESTIBULEFREEZERCOOLER3841/2'' CW DOWN TO RETHERMALIZER5921/2'' FW2 DOWN TO P-23 STOP AT ICE MAKER. SEE 2/P-201. FOR REFERENCE ONLY.3083/4" CWP-5P-53813803/4" OIL3/4" OIL2" OILP-5AEXTEND 2" STEEL PIPE BEYOND FACE OF BRICK. CAP FOR FUTURE USE. GC TO TRIM STUB-OUT ACCORDINGLY.STUB OUT TO BE MOUNTED 18"-36" AFF. REFER TO DETAIL 4/P302 FOR MORE INFORMATION. TYPICAL.1" HW368FWP-30P-11P-11P-4AP-4BP-4BP-53/4" FW3/4" FW3/4" FW22" CW1" HW1 1/2" CW3/4" HW1 1/2" CW3/4" CWP-4BP-21 1/4" CW2133575756173535353513138383/4" CW1/2" HW1 1/4" CW1" CW1053P-193/4" OIL2'' CW INLET AND OUTLET FOR FURTURE KINETICO RO SYSTEM. PROVIDE SHUT-OFF VALVE AND CAP.COORDINATE WITH KINETICO & CORRESPONDING SHOP DRAWINGS FOR TYPE E+B FILTRATION SYSTEM COMPONENTS & CONNECTIONS. SEE DETAIL ON SHEET P-303.384TUBING DOWNSTREAM OF BFP PROVIDED AND INSTALLED BY ICE MAKER INSTALLER. ICE MAKER INSTALLER TO CONNECT TUBING TO ICE MAKER AND BFP'S AND PROVIDE ADAPTER FITTINGS NEEDED TO DO SO.ICE BIN1/2'' FW2 WITH P-23 STOP AND P-34 BFP. TYP OF TWO. SEE DETAIL 4/P-2113/4'' DIA SCHED 40 DRAIN AT BOTTOM OF ICE BIN PROVIDED AND INSTALLED BY ICE BIN INSTALLER.WALL-MOUNTED SCHED 40 ICE MAKER DRAIN MANIFOLD. INSTALLED BY PLUMBING CONTRACTOR. SEE 3/P-201 FOR LAYOUT. SEE K-611 FOR PRECISE RISER LOCATIONS.CLEAR POLY-TUBE DRAIN-LINE. EXTENDED FROM ICE MAKER DRAIN OUTLET INTO OPEN TOP OF NEAREST DRAIN RISER MANIFOLD. POLY-TUBE DRAIN LINE PROVIDED AND INSTALLED BY ICE MAKER INSTALLER. TYPICAL OF TWO.3803/4'' FW2 DOWN IN WALL. SEE 1/P-302 FOR CONTINUATION.P-26380.ICE MAKERVERTICAL DROP AT FUNNEL DRAIN WITH DOUBLE EIGHTH-BEND OFFSET AROUND BASE TILE. PROVIDE 2'' AIR GAP.1-1/2'' SANITARY TEE WITH CLEANOUT PLUG AT UPPER HUB. ALIGN DROP WITH FUNNEL DRAIN.PIPE CLIP SUPPORT FOR 1-7/8'' OD PIPING. SECURE TO WALL WITH ''TEKS'' BRAND 1'' X #8 LATH SCREWS WITH DRILL-POINT TIP.EDGE OF 60''-WIDE ICE BIN OUTLINE AS VIEWED FROM FRONT.1-1/2'' DIA SCHED 40 ICE MAKER DRAIN RISER MANIFOLD. SURFACE -MOUNT ON FRP WALL BEHIND ICE BIN BY PLBG CONTRACTOR.P-26 FUNNEL DRAIN WITH 3-1/2" TALL OVAL FUNNEL.AREA FOR 6'' DIAMETER WALL-MOUNTED ICE BIN STAND-OFFS. INSTALL PIPING CLEAR OF THESE AREAS. STANDOFF'S INSTALLED BY CFA ICE MAKER INSTALLER.AS DRAIN RISER MANIFOLD PIPING WILL BE INSTALLED PRIOR TO ICE BIN DELIVERY, ESTABLISH BIN'S PRECISE LOCATION FROM DIMENSIONS ON K-SHEET ELEVATIONS.DRAIN RISER LOCATIONS MEASURED FROM EDGE OF ICE BIN. VERIFY ICE BIN WIDTH AND PRECISE LOCATION FROM DIMENSIONS ON K-SHEET ELEVATIONS.24'' AFF57'' AFF386T38038018"24"6"48"1'-0"CLCL1'-0''FRONTChick-fil-A5200 Buffington Road Atlanta, Georgia 30349-2998Information contained on this drawing and in all digital files produced for above named project may not be reproduced in any manner without express written or verbal consent from authorized project representatives.CONSULTANT PROJECT #PRINTED FORDATESHEETSHEET NUMBERDRAWN BYREVISION SCHEDULEA1234BCDEABCDE1234CHICK-FIL-ABUILDING TYPE / SIZE:RELEASE:#1/12/2023 11:07:44 AMAutodesk Docs://IN_04978_West Carmel (IN) FSU_2022.7_FSR/04978_West Carmel (IN) FSU_PLB.rvtP-201WATER AND OIL PIPINGPLANPERMIT01/12/23CACWest Carmel FSU049789965 N MICHIGAN ROADCARMEL, IN 4603240-LS-04978-P-201-WATER AND OIL PIPING PLAN22169.CD.S22.08P14 LS LRGFSRNOT TO SCALE43-WAY VALVE AT MOP SINKKEY NOTES1 1'' DIAMETER PVC DRAIN FROM BACKFLOW PREVENTER PANEL. CONNECT 1'' PVC TO FACTORY PROVIDED COUPLINGMOUNTED ON BACK PANEL. ROUTE DRAIN TO P-26 FUNNEL DRAIN AT END OF BAG-N-BOX. MOUNT PIPING TIGHT TOWALL WITH STRUT AND CLAMP.2 1'' GAS DOWN FROM ROOF FOR P-19. SEE 6/P-303 FOR CONTINUATION. OFFSET DROP WITHIN WALL ABOVE MECHROOM CEILING.5 1/2'' HW AND CW DROPS TO MOP SINK FAUCET SET P-7. PROVIDE BALL VALVE FOR EACH ABOVE CEILING WITH P-22BALL CHECK VALVE IN EACH DROP. SEE RISER DIAGRAM 1/P-302.6 1/2'' HW AND CW DROPS TO P-16 WALL FAUCET WITH VACUUM BREAKER FOR DEDICATED CONNECTION TO ECOLABDETERGENT DISPENSER. MOUNT AS SHOWN ON K-SHEETS. PROVIDE BALL VALVES IN SUPPLY ABOVE CEILING.8 1/2" FW TO P-24 & P-34 AT TWO TEA BREWERS AND ONE COFFEE MAKER. SEE 4/P-211 AND 1/P-302.10 2'' CW ON WALL. SEE 4/P-303 FOR EXACT ROUTING LOCATIONS OF CW PIPING IN THIS AREA.13 3/4'' FW DROP TO TWO-HANDLE FAUCET, P-30. MOUNT FAUCET ON WALL. SEE K-SHEETS FOR EXACT LOCATION. PIPE1/2'' FW TO EACH FAUCET INLET WITH 6'' SPREAD. PROVIDE BALL VALVE ABOVE CEILING. SEE RISER DIAGRAM1/P-302.17 APPLY RAYCHEM XL-TRACE, MODEL 5XL-1, SELF REGULATING HEATING CABLE. USE END SEAL KIT FROM MFR.PROVIDE P-TRAP IN CONDENSATE DRAIN ON COOLER SIDE OF COOLER-FREEZER PANEL WALL WITH OPEN-TOPPEDTEE AT TRAP OUTLET. PROVIDE 6'' OF FALL IN FREEZER DRAIN LINE PRIOR TO PENETRATING PANEL WALL. EXTENDHEAT TRACE TO P-TRAP OUTLET IN COOLER.33 OWNER PROVIDED, PLUMBER INSTALLED STOP/BFP PANEL. SEE K-SHEET ELEVATIONS FOR EXACT LOCATION.PROVIDE EXPOSED 3/4'' BALL VALVE AT CONNECTION TO PANEL. ROUTE 1'' PVC DRAIN FROM FACTORY PANEL DRAINCONNECTION TO P-26 FUNNEL DRAIN AT END OF BEVERAGE RACK AND TERMINATE WITH ELBOW AND AIR GAP.35 P-11 WALL HYDRANT 24'' AFF WITH BALL VALVE IN DROP 48'' AFF. ORDER HYDRANT WITH 12'' WOODFORD WALLTHICKNESS. SEE WATER RISER 1/P-302. SECURE TO WALL WITH STRUT AND CLAMP.38 PROVIDE SCHEDULE 40 (BLACK OR GALVANIZED) STEEL PIPING BACK TO FUTURE DARPRO OIL TANK. PIPING TO BEROUTED TO ALLOW AS MUCH FALL AS POSSIBLE TO THE TANK.53 SEE 6/P-303 FOR P-19 WATER HEATER, AND P-38 HOT WATER CIRCULATING PUMP. COORDINATE WATER AND DWVPIPING IN THIS AREA WITH HVAC DUCT. SEE M-201 FOR DUCT LAYOUT.57 TURN 3/4" AND 2" SCHEDULE 40 STEEL PIPE DOWN THROUGH CEILING FOR FUTURE DARPRO OIL TANK AND CAPACCORDINGLY. PROVIDE CHROMED ESCUTCHEONS AT CEILING PENETRATIONS. 3/4" OIL LINE TO BE CAPPED 2"BELOW CEILING.Kurzynske & Associates2705 Lebanon Pike - Suite OneNashville, Tennessee 37214Telephone: (615) 255-52031/4" = 1'-0"1WATER AND OIL PIPING PLAN PLUMBINGNOT TO SCALE2ICE MACHINE PIPINGNOT TO SCALE3ICE MAKER DRAIN ON WALL01/12/23NO.DATEDESCRIPTION