HomeMy WebLinkAboutP-211 - BEVERGE CONDUIT PLANP-24 ANGLE STOP AND 1/2" ESCUTCHEON 5'-0" AFF.P-34 BACKFLOW PREVENTERPIPE CLAMPS AND BRACKETS PER SPECIFICATIONS. SEE 1/P-901.QUICK CONNECT TUBING CONNECTING FLARE ADAPTER TO BREWER IS PROVIDED BY CHICK-FIL-A WITH EACH BREWER AND SHALL BE INSTALLED BY PLUMBING CONTRACTOR.2'' MAX1/2'' IPS X 2'' LONG CHROME NIPPLE1/2'' MIP ADAPTERINTERIOR WALL1/2'' IPS X 2'' LONG CHROME NIPPLET & S MODEL B-0110 FLANGED WALL BRACKET. SEE P-34 SPECIFICATION.ADJUST STANDOFF LENGTH BY REMOVING FLANGE AND CUTTING STANDOFF TO PROPER LENGTH. RE-ATTACH FLANGE AND TIGHTEN SET-SCREW. SECURE ALL SET-SCREWS WITH LOCKTITE.PROVIDE 2X4 BLOCKING WITHIN WALL. SECURE FLANGE TO WALL/BLOCKING WITH 1-1/2'' STAINLESS STEEL FLAT HEAD WOOD SCREWS.4''LC1/2" FWFLARE ADAPTER:1/2" FIP X 3/8" FLARE AT COFFEE.1/2" FIP X 1/4" FLARE AT TEA.1.2.3.4.5.6.ROUTE BEVERAGE SYSTEM PIPING OVERHEAD FROM THE BEVERAGE RACK TO DRINK TOWERS IN FOUR (4)-6" DIA SCH 40 PVC DWV CONDUITS. ALL CONDUIT SHALL BE HELD TIGHT TO STRUCTURE AND SUPPORTED WITH THREADED ROD AND CLEVIS HANGERS AT INTERVALS SHOWN IN SPECIFICATIONS FOR HORIZONTAL OVERHEAD PIPING. COORDINATE ROUTING WITH THE GENERAL CONTRACTOR TO AVOID MECHANICAL AND ELECTRICAL SYSTEMS. SEE 1/P-101 AND 1/P-221 FOR BELOW-SLAB BEVERAGE CONDUIT.COORDINATE ROUTING OF ALL CONDUITS WITH HVAC DUCT IN KITCHEN. SEE SHEET M-201 FOR LOCATION OF AC UNITS AND DUCT ROUTING.TURN THE 6" DIA CONDUIT DOWN THROUGH THE CEILING AT THE BEVERAGE RACK AND PROVIDE CHROMED ESCUTCHEONS AT CEILING PENETRATIONS. TERMINATE OPPOSITE END ABOVE CEILING WHERE SHOWN ON PLANS. AT 4'' DIA CONDUIT DROP IN WALL, PROVIDE 1/8TH BEND FITTING WITH SHORT PIPE STUB AT BASE OF DROP. CUT STUB AND FITTING FLUSH WITH FINISHED WALL.FOR BEVERAGE CONDUIT DROPS AT WALLS WITH SHEATHING EXTENDED ABOVE THE CEILING, PROVIDE APPROPRIATE FITTING AT UPPER END OF CONDUIT DROP TO EXTEND CONDUIT THROUGH SHEATHING. INSTALL CONTINUOUS CONDUIT FROM CO2 FILL-BOX LOCATION TO BULK CO2 TANK AS SHOWN ON PLANS AND DETAILS. COORDINATE 4'' CONDUIT WALL STUB INSTALLATION CLOSELY WITH GENERAL CONTRACTOR AND BRICK MASON. PRIOR TO COVERING UP OF CONDUIT, VERIFY WITH GENERAL CONTRACTOR THE FULL LENGTH OF FILL/VENT TUBING MAY BE INSTALLED AND SUBSEQUENTLY REMOVED FROM CONDUIT. SEE PLAN AND DETAIL #5 THIS SHEET.2. BEVERAGE CONDUIT NOTESSUPPLY AIR DUCT.TURN PIPING DOWNIN WALL TO FIXTURES.BOLT STRUT TO FRAMING. ROUTE PIPINGAROUND ROOF HATCH OPENING.KITCHENSTRUT6'' BEV CONDUIT. INSTALLTIGHT TO BOTTOM OF JOISTS.LOCATE HW LOOPWITHIN 6'' OF WALL.GANG WATER PIPING TOGETHER TOACCOMMODATE BEVERAGE CONDUIT.ROUTE PIPING INBOARD OF CONDUIT.ALTERNATE ROUTING ALLOWED TOAVOID CONFLICT WITH OTHER TRADES:ROUTE UP WITHIN IN JOIST-SPACE ATOP BOTTOM CORD AND SECURED WITH CLAMPS.3'' DIA SCHED 40 PVCOVERHEAD CONDUIT INSTALLED TIGHT TO BOTTOM OF STRUCTURE.REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR PRECISE LOCATION OFCONDUIT PENETRATION. GENERAL CONTRACTOR SHALL PROVIDE AND TRIM ACT TO FIT CONDUIT, INSTALL ACT IN CEILING GRID AND ATTACH ESCUTCHEON PLATE.EXTEND 4'' DIA CONDUIT STUB-OUTBEYOND FACE OF BRICK. ( GC TO TRIMSTUB-OUT FLUSH WITH FACE OF BRICKPRIOR TO MOUNTING FILL BOX.)4'' DIAMETER STUB-OUT WITH ORANGETEST CAP FOR CO2 FILL/VENT TUBING.SEE ARCHITECTURAL DRAWINGS FORPRECISE LOCATION OF FILL-BOX. ALIGNCENTER OF STUB-OUT WITH CENTER OFFILL-BOX AS DIMENSIONED ONARCHITECTURAL SHEETS.SERVICECO2 FILL BOX. SHOWN HERE FORREFERENCE ONLY.CO2 BULK TANK.SHOWN HERE FORREFERENCE ONLY.EXTEND CONDUIT 3'' BEYONDFACE OF ACT, SECURED WITHEXCUTCHEON PLATE.SPLIT-RING ESCUTCHEONSARE NOT ALLOWED.SECURE DROP WITHIN 6''ABOVE ACT WITH STRUT ANDCLAMP. PROVIDE ADDITIONALBLOCKING AS NEEDED.3 X 4 PVCQUARTERBEND FITTING.LONG RADIUS SWEEPSAT ALL TURNS, TYPICAL.CO2 FILL BOX, FILL TUBING, AND VENT LINE SET PROVIDED BY CHICK-FIL-A AND INSTALLED BY GC. GC TO COORDINATE REQUIRED LENGTH OF TUBING AND LINE SET FROM FILL BOX TO TANK LOCATION WITH TMS; LENGTH NOT TO EXCEED 100 FT. FINAL CONNECTION BY CO2 VENDOR.6" PVC PLAN STORAGE TUBE ABOVE DOOR. MOUNT 6" DIA X 30" LONG SCHED 40 PVC WITH CLEANOUT PLUGS AT EACH END. SECURE TO WALL 3" ABOVE AIR CURTAIN WITH STRUT AND CLAMP.6" DIAMETER BEVERAGE CONDUITS.SEE BEVERAGE CONDUIT NOTE #3.6" DIA BEVERAGE CONDUITTIGHT TO STRUCTURE.4" DIA SCHED 40 PVC BEVERAGE CONDUIT DOWN IN WALL. START ABOVE CEILING AND TURN OUT THRU WALL TOWARDS DRIVE-THRU DRINK TOWER WITH BOTTOM EDGE OF WALL PENETRATION 0'-8" ABOVE FINISHED FLOOR. SEE BEVERAGE CONDUIT NOTE #4 AND #5.6" DIA SCHED 40 BEVERAGE CONDUIT TURNED DOWN THRU ACT. TYPICAL OF FOUR. SEE 3/P-211 NOTE #3. 4" DIA STUB-OUT AT REMOTE FILL-BOX. SEE DETAIL #5 THIS SHEET.3'' DIA SCHED 40 PVC SWEEP TURNED DOWN WITH DROP THROUGH ACT ABOVE BULK CO2 TANK. SEE ARCHITECTURAL REFLECTED CEILING PLAN FOR PRECISE LOCATION. SEE DETAIL #5 THIS SHEET.DININGSERVINGDRIVE-THRUWOMENSMENSRR VEST.KITCHENSERVICEOFFICERISERFREEZERCOOLERPROVIDE SCHED 40 FOAM CORE PVC FOR ABOVE SLAB BEVERAGE CONDUIT. BELOW SLAB BEVERAGE CONDUIT TO BE SCHED 40 SOLID WALL PVC.TRANSITION FROM 6" TO 4" SCHED 40 PVC BEVERAGE CONDUIT AS CLOSE TO WALL AS POSSIBLE.4" DIA SCHED 40 PVC BEVERAGE CONDUIT DOWN IN WALL. START ABOVE CEILING AND TURN OUT THRU WALL TOWARDS MOBILE ORDER DRINK TOWER WITH BOTTOM EDGE OF WALL PENETRATION 0'-8" ABOVE FINISHED FLOOR. SEE BEVERAGE CONDUIT NOTE #4 AND #5.TECH CLOSET6" DIA SCHED 40 BEVERAGE CONDUIT TIGHT TO STRUCTURE. EXTEND WITHIN WALL. EXTEND UP THROUGH WALL FRAMING JUST ABOVE CEILING, TYPICAL OF FOUR. COORDINATE WITH DEVICES, CONDUITS, AND FIXTURES FROM OTHER DISCIPLINES DURING PRE-CONSTRUCTION MEETING.ROUTE 6" DIA BEV CONDUIT IN THIS AREA ABOVE RECTANGULAR DUCT. COORDINATE CLOSELY WITH HVAC INSTALLER PRIOR TO INSTALLATION.Chick-fil-A5200 Buffington Road Atlanta, Georgia 30349-2998Information contained on this drawing and in all digital files produced for above named project may not be reproduced in any manner without express written or verbal consent from authorized project representatives.CONSULTANT PROJECT #PRINTED FORDATESHEETSHEET NUMBERDRAWN BYREVISION SCHEDULEA1234BCDEABCDE1234CHICK-FIL-ABUILDING TYPE / SIZE:RELEASE:#1/12/2023 11:07:46 AMAutodesk Docs://IN_04978_West Carmel (IN) FSU_2022.7_FSR/04978_West Carmel (IN) FSU_PLB.rvtP-211BEVERAGE CONDUITPLANPERMIT01/12/23CACWest Carmel FSU049789965 N MICHIGAN ROADCARMEL, IN 4603240-LS-04978-P-211-BEVERAGE CONDUIT PLAN22169.CD.S22.08P14 LS LRGFSR1/4" = 1'-0"4COFFEE & TEA BREWER STOP & BFPNOT TO SCALE3SECTION AT WET WALLNOT TO SCALE5CO2 FILL/VENT CONDUIT AND FILL-BOX INSTALLATIONKurzynske & Associates2705 Lebanon Pike - Suite OneNashville, Tennessee 37214Telephone: (615) 255-52031/4" = 1'-0"1BEVERAGE CONDUIT PIPING PLAN01/12/23NO.DATEDESCRIPTION