HomeMy WebLinkAboutP-250 - ROOF PLAN AND DETAILSGAS PIPINGROOFPROVIDE SUPPORT AT ELBOWWITHIN 3'' OF RISER. SEE PIPESUPPORT DETAIL THIS SHEET3''1'-0''6''OFFSET PIPING A MINIMUM OF 6''ABOVE TOP EDGE OF FLASHING.FLASHING SYSTEM BY ROOFING CONTRACTOR. COORDINATE PENETRATION WITH ROOFER. SEE ARCHITECTURAL DRAWINGS.GAS PIPE DROP TO WATER HEATER.SEE 1/P-201 FOR CONTINUATION.GAS AND CONDENSATE PIPING ON ROOF.DISTANCE BETWEEN PIPE STANDS NOT TO EXCEED 8'-0" FOR GAS AND 4'-0'' FOR CONDENSATE.SET ON ROOF MFRAPPROVED PAD.PIPE CLAMP ONE SIZE LARGERTHAN PIPE DIAMETER. SECURECLAMP TO STRUT WITH B-LINECONNECTORS.HEAVY DUTY 100% RECYCLED RUBBER BASE WITH FACTORYREFLECTIVE RED WARNING STRIPE.NOTES:1. NON ADJUSTABLE MODEL DB610 PIPE STAND TO BE USED FOR NON-ELEVATED PIPING INSTALLED FLAT ON ROOF DECK. 2. PROVIDE MODEL DBE 10-8 OR DBE 10-12 OR DBE 10-16 AS NEEDED FOR ELEVATING CONDENSATE PIPING TO MAINTAIN PROPER SLOPE AND FOR GAS PIPING CROSSING OVER CONDENSATE PIPING. 3. ENSURE GAS AND CONDENSATE PIPING DO NOT OBSTRUCT ROOFTOP EQUIPMENT ACCESS OPENINGS. RE-PIPING OF SYSTEMS DUE TO CONFLICTS WITH EQUIPMENT ACCESS OPENINGS SHALL BE DONE AT PLUMBING CONTRACTOR'S EXPENSE. STRUT. FIELD ADJUST TO KEEPSTRUT LEVEL. PIPE SHALL FOLLOW SLOPE OF ROOF.COOPER B-LINE DURA-BLOK DB SERIES SHOWN.CANOPY GENERAL NOTESCOORDINATE NEW WORK WITH EXISTING CONDUIT, STRUCTURE, AND PIPING. FIELD VERIFY EXISTING CONDITIONS PRIOR TO START OF WORK.COORDINATE LOCATION AND RESPONSIBILITIES FOR UNDERGROUND PIPING AND ASSOCIATED TRENCHING WITH GENERAL CONTRACTOR PRIOR TO START OF WORK.EXPOSED GAS PIPING SHALL BE PAINTED BY GENERAL CONTRACTOR.ACTUAL NUMBER OF GAS INFRARED HEATERS WILL BE DETERMINED BY SITE-SPECIFIC CANOPY LAYOUT AND EQUIPMENT LOCATIONS, AS INDICATED ON ARCHITECTURAL PLANS.1.2.3.4.LEGENDGIH#1GAS INFRARED HEATER #1 (TYP.)NEW GAS PIPING ABOVE GRADENEW GAS PIPING BELOW GRADEBELOW GRADEELECTRICAL CONTRACTORMECHANICAL CONTRACTORB/GECMC125,000 BTUS1,245,000 BTUSEQUIVALENT TO 1,245.0 CFH320,000 BTUSDEVELOPED LENGTH: 175 FT (METER TO AC#3)WATER HEATERREMARKS:TOTAL CONNECTED LOADEQUIPMENTAC#2AC#3AC#17" W.C. DELIVERY PRESSURE1)2)GAS LOAD320,000 BTUS250,000 BTUS3)GAS CONNECTION SCHEDULE5.100,000 BTUSGIH (2 @ 50,000 BTU EA.)130,000 BTUSAC#4PLUMBING CONTRACTOR SHALL PROVIDE AND INSTALL CONDUIT FOR ICE MAKER, AND WALK-IN FREEZER AND COOLER REFRIGERANT TUBING THROUGH ROOF. SEE ARCHITECTURAL DRAWINGS FOR ROOFTOP REFRIGERANT CONDUIT INSTALLATIONS AND LOCATION OF ICE MAKER, FREEZER AND COOLER CONDENSING UNITS.PIPING ON ROOF SHALL NOT BE INSTALLED NEARER THAN 1'-0' FROM INSIDE EDGE OF PARAPET. U.N.O.1" GAS DOWN THRU ROOF TO WATER HEATER. SEE 2/P-201 FOR CONTINUATION. SEE DETAIL 6/P250 FOR PIPING AT PENETRATION.ROUTE CONDENSATE THRU PARAPET SCUPPER AND INTO DOWNSPOUT COLLECTOR WITH 90 DEG ELBOW. TYPICAL.TURN 3'' GAS UP WITHIN WALL, THRU PARAPET AND ONTO ROOF.SEE DETAIL 3/P-250 FOR PIPING AT RTU, TYPICAL.SEE ARCHITECTURAL DETAILS FOR ROOFTOP PIPE PENETRATIONS.CONDENSATE PIPING ON ROOF SHALL BE SCHEDULE 40 PVC. SEE SPECIFICATIONS ON DRAWING P-901.ROUTE 4" MAIN BUILDING VENT UP THROUGH ROOF. SEE 1/P-301 FOR CONTINUATION.PROPOSED GASMETER LOCATIONINSTALL MAIN GAS SUPPLY LINENO CLOSER THAN 3'-6" FROMAC UNIT CURB, TYPICAL.C.O.C.O.C.O.C.O.WHEN CONTRACTOR OPTS TO PROVIDE BRADFORD-WHITE 199,000 BTU ALTERNATE WATER HEATER, INCREASE PIPE SIZE TO 1-1/4'' DIA.ROUTE WATER HEATER FLUE UP THROUGH ROOF PER MANUFACTURER'S RECOMMENDATIONS.ROUTE WATER HEATER COMBUSTION AIR DUCT UP THROUGH ROOF PER MANUFACTURER'S RECOMMENDATIONS.MEAL DELIVERY CANOPY. SEE ARCHITECTURAL.CANOPY GAS PIPING BY PLUMBER. GIH INSTALLATION BY MECHANICAL.PROVIDE FULL PORT BALL VALVE EQUAL TO APOLLO 50GB SERIES WITH WING HANDLE OPTION ABOVE GRADE AT THE METER. PROVIDE BRASS VALVE TAG WITH JACK CHAIN AT VALVE MARKED "SERVICE SHUTOFF FOR CANOPY HEATERS."ROUTE POLYETHYLENE GAS B/G FROM THE METER. FOR TRANSITION FROM POLYETHYLENE PIPING B/G TO STEEL AT THE METER, INSTALL ANODELESS RISER WITH INTEGRAL CONSTAB PE-TO-IPS TRANSITION FITTING BY CONTINENTAL INDUSTRIES OR EQUAL BY ELSTER.1-1/2" GAS B/G TO ORDER CANOPY, SEE 1/P-251.C.O.C.O.ROUTE CONDENSATE THRU PARAPET SCUPPER AND INTO DOWNSPOUT COLLECTOR WITH 90 DEG ELBOW. TYPICAL.C.O.2" GAS1 1/2" CONDENSATE1 1/2" CONDENSATE1 1/2" GAS1 1/4" CONDENSATE1" GAS2" GAS1 1/2" CONDENSATE2 1/2" GAS3" GAS2" GAS2" GASEF#2EF#1EF#31 1/2" CONDENSATE1 1/2" CONDENSATEAC#1AC#2AC#3AC#44" DEEP SEAL TRAPUNION, TYPICAL OF TWO AT P-TRAP.2"ROOFTOP UNITSCHED 40 PVCTHREADED PLUGTEE LEG OPEN TO ATMOSPHERESEE DWG THIS PLAN FORCONTINUATION AND SIZE. TRAPPIPING TO BE SAME SIZE ASBRANCH SHOWN ON ROOF PLAN.3'-6" MINIMUMROOFTOP UNITUNIONROOFGAS COCKDRIP LEG. MAINTAIN CLEARANCE FROM ROOF NECESSARY TO REMOVE CAP FOR CLEANING.SEE PIPE SUPPORT DETAIL THIS SHEETREDUCER AT GAS COCK.BRANCHPIPINGGASMAINNOTES:1. INSTALL GAS PIPING SUCH THAT HVAC EQUIPMENT ACCESS PANELS AND/OR DOORS ARE IN NO WAY OBSTRUCTED BY PIPING, VALVES, OR SUPPORTS.2. TO AVOID CONFLICT WITH AC UNIT ACCESS DORRS, INSTALL GASPIPING NO CLOSER THAN 3'-6" FROM AC UNIT. (EXCEPT FORBRANCH LINE CONNECTED TO AC UNIT.)3. ROUTE BRANCH TAKE-OFF DIRECTLY FROM MAIN TO ROOFTOPUNIT AS SHOWN ON PLAN AND DETAILS WITHOUT LATERALOFFSETS WHICH MAY OBSTRUCT UNIT ACCESS DOORS.Chick-fil-A5200 Buffington Road Atlanta, Georgia 30349-2998Information contained on this drawing and in all digital files produced for above named project may not be reproduced in any manner without express written or verbal consent from authorized project representatives.CONSULTANT PROJECT #PRINTED FORDATESHEETSHEET NUMBERDRAWN BYREVISION SCHEDULEA1234BCDEABCDE1234CHICK-FIL-ABUILDING TYPE / SIZE:RELEASE:#1/12/2023 11:07:50 AMAutodesk Docs://IN_04978_West Carmel (IN) FSU_2022.7_FSR/04978_West Carmel (IN) FSU_PLB.rvtP-250ROOF PLAN ANDDETAILSPERMIT01/12/23CACWest Carmel FSU049789965 N MICHIGAN ROADCARMEL, IN 4603240-LS-04978-P-250-ROOF PLAN AND DETAILS22169.CD.S22.08P14 LS LRGFSRNOT TO SCALE6GAS PIPE DROP TO WATER HEATERNOT TO SCALE4PIPING SUPPORT ON ROOFKurzynske & Associates2705 Lebanon Pike - Suite OneNashville, Tennessee 37214Telephone: (615) 255-52031/4" = 1'-0"1ROOF PIPING PLANNOT TO SCALE2CONDENSATE DRAIN PIPINGNOT TO SCALE3GAS PIPING AT RTU01/12/23NO.DATEDESCRIPTION