HomeMy WebLinkAboutP-251 - CANOPY PLAN AND DETAILSLEGENDGIH#1GAS INFRARED HEATER #1 (TYP.)NEW GAS PIPING ABOVE GRADENEW GAS PIPING BELOW GRADEBELOW GRADEELECTRICAL CONTRACTORMECHANICAL CONTRACTORB/GECMCCANOPY GENERAL NOTESCOORDINATE NEW WORK WITH EXISTING CONDUIT, STRUCTURE, AND PIPING. FIELD VERIFY EXISTING CONDITIONS PRIOR TO START OF WORK.COORDINATE LOCATION AND RESPONSIBILITIES FOR UNDERGROUND PIPING AND ASSOCIATED TRENCHING WITH GENERAL CONTRACTOR PRIOR TO START OF WORK.EXPOSED GAS PIPING SHALL BE PAINTED BY GENERAL CONTRACTOR.ACTUAL NUMBER OF GAS INFRARED HEATERS WILL BE DETERMINED BY SITE-SPECIFIC CANOPY LAYOUT AND EQUIPMENT LOCATIONS, AS INDICATED ON ARCHITECTURAL PLANS.1.2.3.4.ORDER CANOPY. SEE ARCHITECTURAL.3/4" GAS TO GIH, TYPICAL.GIHGIHGIHGIH1-1/2" GAS B/G TO METER, SEE 1/P-250.GAS PIPING TO BE ROUTED ABOVE CANOPY, ON TOP OF STRUCTURAL MEMBERS, EXCEPT WHERE ROUTED DOWN THROUGH PENETRATIONS AS INDICATED.GAS PIPING DOWN THROUGH DECK. WEATHERPROOF DECK PENETRATION PER DETAIL 2/P-251, TYPICAL.SEE DETAIL 3/P-251 FOR PIPING AT GIH, TYPICAL.CANOPY GAS PIPING BY PLUMBER. GIH INSTALLATION BY MECHANICAL.ATTACH GAS TRANSITION FITTING, ELSTER 702205 OR EQUAL BY GASTITE, TO GAS PIPE STUB-OUT BELOW GRADE. GAS PIPING INSIDE COLUMN AND STUB-OUTS BY CANOPY MFR. JOIN UNDERGROUND POLYETHYLENE GAS PIPING TO TRANSITION FITTING WITH ELSTER PERMASERT COUPLING. CANOPY MFR'S EXPOSED STEEL PPING BELOW GRADE SHALL BE PROTECTED WITH TWO COATS ASPHALTUM BASE PAINT AND POLY SLEEVE.1 1/4" GAS1 1/4" GAS1 1/2" GASGIHGIH1" GAS1" GASFUTURE HEATERS. GC TO PROVIDE INFRATRUCTURE NECESSARY FOR INSTALLATION OF SIX HEATERS.FUTURE HEATERS. GC TO PROVIDE INFRATRUCTURE NECESSARY FOR INSTALLATION OF SIX HEATERS.GAS PIPINGSEE PIPE SUPPORT DETAIL THIS SHEETAGA LISTED GAS COCKAGA LISTED FLEXIBLE CSSTCONNECTION. EQUAL TODORMONT SUPR-SAFESTAINLESS STEEL GASCONNECTOR, 24 INCH LENGTHOR LONGER.GAS INFRARED HEATERINSTALLED BY MC.CANOPY STRUCTURECANOPY DECKSEE WEATHERPROOFING DETAIL THIS SHEETGAS PIPING AND CONDUIT ON ROOFMIRO INDUSTRIES RAH SERIES PIPESTAND.FIELD ADJUST HEIGHT TO MAINTAIN PIPING LEVEL ACROSS THE ROOF.NOTES:1.2.DISTANCE BETWEEN PIPESTANDS NOT TO EXCEED 8'-0".GAS INSTALLER TO PROVIDE DUAL LEVEL SUPPORT TO ACCOMMODATE BOTH GAS PIPING AND CONDUIT.ATTACH SUPPORT PAD TO CANOPY BEAM WITH SELF-TAPPING FASTENERS.CANOPY ALUMINUM BEAMADD SECOND LEVEL WHERE ROUTING BOTH GAS PIPING AND CONDUIT ALONG SAME STRUCTURAL MEMBER.GAS PIPING OR CONDUITPORTALS PLUS DECKMATE FLASHINGSYSTEM. INSTALL PER MANUFACTURER'SINSTRUCTIONS.STAINLESS STEEL BAND CLAMPCANOPY DECKATTACH TO DECK WITH #8 STAINLESSWASHER HEAD SCREWS EQUAL TOFASTENAL. MIN 4 SCREWS ARRANGED INSYMMETRICAL PATTERN AT 0, 90, 180 AND270 DEGREES.FULL PERIMETER APPLICATION BETWEENBOOT COLLAR AND DECK WITH GEOCEL2300.Chick-fil-A5200 Buffington Road Atlanta, Georgia 30349-2998Information contained on this drawing and in all digital files produced for above named project may not be reproduced in any manner without express written or verbal consent from authorized project representatives.CONSULTANT PROJECT #PRINTED FORDATESHEETSHEET NUMBERDRAWN BYREVISION SCHEDULEA1234BCDEABCDE1234CHICK-FIL-ABUILDING TYPE / SIZE:RELEASE:#1/12/2023 11:07:50 AMAutodesk Docs://IN_04978_West Carmel (IN) FSU_2022.7_FSR/04978_West Carmel (IN) FSU_PLB.rvtP-251CANOPY PLAN ANDDETAILSPERMIT01/12/23CACWest Carmel FSU049789965 N MICHIGAN ROADCARMEL, IN 4603240-LS-04978-P-251-CANOPY PLAN AND DETAILS22169.CD.S22.08P14 LS ALLFSRKurzynske & Associates2705 Lebanon Pike - Suite OneNashville, Tennessee 37214Telephone: (615) 255-52031/4" = 1'-0"1ORDER CANOPY PIPING PLANNOT TO SCALE3GAS CONNECTION AT APPLIANCENOT TO SCALE4PIPING SUPPORT ON CANOPYNOT TO SCALE2WEATHERPROOFING AT CANOPY PENETRATION01/12/23NO.DATEDESCRIPTION