Lillard, Sarah N
From:
Sent:
To:
Subject:
Greg Hoyes [grh@co.hamilton.in.us]
Monday, May 15, 200612:11 PM
Lillard, Sarah N
Re: City Center Phase 1/Bldg A Foundation Submittal
Sarah
Hamilton County Surveyor!s Office has no outstanding issues with this project. If you
have any questions, please let me know.
Greg Hoyes
HCSO Plan Reviewer
>>> llLillard, Sarah N" <SLillard@carmel.in.gov> 3:32 PM Friday, May 12,
>>> 2006, 2006 >>>
The Building & Code Services division, HAS received a permit application for the below-
mentioned building foundation. Please "REPLY TO ALL!! as soon as possible, with any
outstanding issues your office may have with this project.
Project:
CITY CENTER pedcor project; BIdg "A"/Phase 1 foundation release only at this time.
( L-shaped building at the corner of City Center Dr. & Range Line Rd., and some of the
parking garage area at that corner)
Related Planning & Zoning docket numbers:
?
Representative(s) :
Steve Warne of Signature Construction
Bob Olsen of eso
(and several others)
Again, if there are concerns that might affect the issuance of this permit, please REPLY
TO ALL on this e-mail.
1
CITY CENTER PHASE 1
Building A and part of garage
NOTES FROM FDN SUBMITTAL MEETING 5/12/06
Present: Steve Warne - Signature Construction; Jason - Signature Construction; Bob Olsen - CSO
Architects; Jim Walls -lead architect for design; Jim Stutzman - architect of record; Jim Blanchard-
City of Carmel; Sarah Lillard - City of Carmel.
Various Firms involved with proiect mentioned at the meeting: PedCor; Signature Construction;
McComas Engineering (structural); CSO (civil); Dalmation (sprinkler); Oberly's (M.E.P.'s); Patriot
Engineering (site concrete/FDN installation)
Phase I ofproiect involves: FDN for part of the LL garage at the comer of City Center Dr. and Range
Line Rd.; Utility tunnel excavation; site work (grading) for phase 1 area; erosion control installation;
highway barrier with fencing above barrier along roadways at this comer; retaining/shoring structural
installation at this comer; piling installation; foundation and. foundation wall in LL; slab on grade; pre- .
cast basement (LL) structure installation; construction up through sub floor of ground level of Bldg. A.
,( Patriot Engineering will be on site full time throughout structural concrete pouring ofFDN.
They will provide Building & Code Services reports.
,( The Building & Code Services office will be notified of the pouring schedule. This way, the
City can come out to inspect whatever they feel is needed.
./ The architects will also be doing inspections throughout the process, and can provide Building &
Code Services with any reports they may request, regarding the construction.
,( Engineering firm( s) will also have independent inspectors there at times, who can also provide
Building & Code Services with information/reports.
,( Jason will be the construction project manager on site. They will provide us his number, and a
list of the names and phone numbers of other we may need to contact on site, as soon as possible.
~ Jim Blanchard asks if the City Engineer's office has approved this phase of the work.
--Bob Olsen replies that they have taken this phase through T AC.
--Someone else reports that some Board of Public Works approvals have been
obtained.
~ Sarah Lillard reports that the full addressing scheme for the development has not yet been
established, -but that this building will actually have multiple street addresses.
~ Sarah Lillard asks that when we get closer to revision/amendment for the construction of the
above ground area, that someone from PedCor/Signature contact her regarding how the permits
will need to be submitted. (1 st floor and possibly second floor as revision/amendment to the
original permit structure; upper floors as separate, multi-family, permit; then tenant finishes will
be submitted at a later date)
* * * Right now, on application, square footage and estimated cost of constrnction listed is for the
foundation area only. (LL)
S:Permits/CITY CENTER PROJECT/Submittal Mtg Notes Ph 1, 5-12-06
CARMEL CITY CENTER - PHASE I
CARMEL, INDIANA
IDHS - PLAN REVIEW FEE SUMMARY
CARMEL CITY CENTER PHASE I; OVERALL AREAS
Description No. Gross Subtotal
Floors Area per
Floor
PUBLIC AREAS
Covered Parking Area 1 151,875.21
Pedestrian Plaza 1 73,004.27
BUILDING A
Module (a) Retail 1 17,226.14 ro;i_2_6.:,iilS
Module (a) Apartment 3 14,936.47 t:A4,809Al .
Module (a) Mechanical Penthouse 1 3,627.00 C3,62Z.0,Q:.J
Module (a) basement support 1 2,146.89 ftj,B.6,.89.:9
Module (b) Retail 1 36,507.35 ~,50Z.'35J
Module (b) Condo 4 24,809.77 ?'r.2}9-'-08IJ"
Module (b) Penthouses 1 23,525.91 '23;525.91~
Module (b) Penthouses 1 19,717.57 !J}l~717,s}.1J
Module (b + c) Lower Retail 1 22,086.14 22'. .-t
:.... ,086.14
Module (c) Retail 1 12,019.69 rg~OY9-'-69p
Module (c) Apartment 3 9,560.61 2!l;681,831
BUILDING B
Building B Retail 1 9,204.00 9,204.00
Building B Office 2 9,204.00 18,408.00
SUPPORT AREAS
BLDG D basement Support 1 1741.23 1,741.23
BLDG H basement Support 1 10,035.23 10,035.23
Parking level electrical vault 1 3,926.92 3,926.92
ramp (slab on grade) 1 3,913.76 3,913.76
CARMEL CITY CENTER PHASE I; BUILDING A; GARAGE ONLY
SPECIFIC AREAS THIS FILING
Phase I; Building A Parking
CP7;95.4;::7f
~
)
pk~~
Lillard, Sarah N
From:
Sent
To:
Cc:
Subject:
Jim Stutzman urs@pedcor.net]
Friday, May 12, 2006 4:40 PM
Lillard, Sarah N
Steve Warne
Carmel City Center Phase 1 Square Foot Breakdown
It]
CCCPHlCarmelPer
mit.xls (54 KB)...
Sarah:
Attached is the spreadsheet showing how we divided the OVERALL AREA for Phase I, inclvding
construction areas of upper buildings. This was developed for filing with Dept of Homeland
Security, which required disclosure on the full areas contained within Phase I.
The area involved in the permit filed today is shown at the bottom of the spreadsheet as
Carmel City Center Phase Ii Building Ai Garage only, at 67,954 sq ft.
If you have any questions, please call me at 705.7979.
Thanks
James R. Stutzman, AlA, NCARB, CSI
Senior Principal Architect, Vice President
PEDCOR DESIGN GROUP
335 Ridgepoint Drive
Carmel, Indiana 46032
This email and any files transmitted with it are confidential and'intended solely for the
use of the individual or entity to which they are addressed. If you have received this
email in error please notify the system manager. Please note that any views or opinions
presented in this email are solely those of the author and do not necessarily represent
those of the company. Finally, the recipient should check this email and any attachments
for the presence of viruses. The company accepts no liability for any damage caused by any
virus transmitted by this email.
1
Page 1 of 1
Lillard, Sarah N
From: Lillard, Sarah N
Friday, May 12, 2006 2:32 PM
Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us';
'mbm@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R; Redden, Nick;
Hollibaugh, Mike P; Duffy, John M
Subject: City Center Phase 1 /Bldg A Foundation Submittal
Sent:
To:
The Building & Code Services division, HAS received a permit a~~lication for the
below-mentioned building foundation. Please "REPLY TO ALL" as soon as
possible, with any outstanding issues your office may have with this project.
Project:
CITY CENTER Pedcor project; Bldg "A"/Phase 1 foundation release only at
this time.
( L-shaped building at the corner of City Center Dr. & Range Line Rd., and
some of the parking garage area at that corner)
Related Planning & Zoning docket numbers:
?
Representative( s):
Steve Warne of Signature Construction
Bob Olsen of CSO
(and several others)
Again, if there are concerns that might affect the issuance of this permit,
please REPLY TO ALL on this e-mail.
5/12/2006