Loading...
HomeMy WebLinkAboutCOM 02-07-23 1 \\.„....,A.,/ -. City of Carme Carmel Plan Commission COMMERCIAL COMMITTEE Tuesday, February 7, 2023 Meeting Minutes Location: Cannel City Hall Caucus Rooms,2nd Floor, 1 Civic Square,Cannel,IN 46032 Members Present: Joshua Kirsh(Chair),Adam Aasen,Leo Dierckman,Christine Zoccola Staff Present: Aliza Shalit(Sign Permit Specialist),Mike Hollibaugh(Director of DOCS) Legal Counsel:Ally Lynch-Mcgrath Time of Meeting: 6:00 PM Christine Zoccola nominates Josh Kirsh as Committee Chair. Seconded by Adam Aasen. Approved 4-0 1. Docket No.PZ-2023-00001 ADLS Amend: Majestic of Carmel Renovations. The applicant seeks approval for exterior building modifications and site improvements,including a port cochere. The site is located at 12999 Pennsylvania St. It is zoned UR/Urban Residential.Filed by John Seib of Majestic Care of Cannel. Petitioner:John Seib: Making needed improvements to the property. When purchased in 2021 we were very anxious to try to amend things Iinside and outside of a facility that has had not updates since 1984.Planner review and TAC Committee members' comments have been addressed. Conditions were to beef-up some of the column widths,we addressed that by having a larger wooden beam as opposed to masonry all the way up so it would not look too enclosed. We agree to: • Incorporate the bicycle parking racks • Commitment to put the multi-use path into compliance • BZA Variance for the Sign Department Report: Mike Hollibaugh: The Staff report identifies aspects of the project,as well as items we still need to work on.Project is headed in the right direction. I spoke with David Littlejohn who mentioned that there were commitments on bicycle parking and a verbal commitment to the path contribution rather than the installation.I think that we can continue to work with them to resolve any of the outstanding site issues and get signoffs through the ProjectDox plan review process.Generally,we are in good shape. Committee Comments: Leo Dierckman: What color is the canopy roof?Seib: The roofmg is a black metal; it will match the roofing that is on the building.Currently there is a skylight that needs replacement and will be replaced with the same material. Christine Zoccola: Are you going to change the paint color?Are you painting the whole building or part of it?Seib: We worked to try to incorporate color blocking in to break the space.If you look over to the left,there is a small service area which will be painted a single block gray color and matched on the top of the building(5th floor).It has areas that come all the way down to the ground and block off the different apartment areas to provide vertical color blocking. The white wall will be capped-off to match the color block.Zoccola: Any thought of picking a different shade of white so there isn't such a stark color contrast between the dark gray and the white?Seib: We really like the Iwhite.I don't see how changing to an off-white would change the look of the facility dramatically.The darker colors we are adding should tone it down quite a bit.Zoccola: We got one letter,asking about the tree lights and that they look very pretty,but would that be an issue for the residents with the lights shining up into the rooms.Is that something you can consider looking into?Seib: We can talk about it with our lighting contractor to try to work on that. As we were considering outside lighting,one of the reasons we didn't go with the lights that shoot up the side of the building was to avoid disturbing the residents. We will work on remediating the lighting if it is found that it causes issues for them. Dierckman: It looks good.Big improvement. Seib: There is a crumbling brick wall that doesn't quite cover the tops of the dumpsters.You can see them from the street.These are issues we inherited from the prior ownership. Zoccola: What are you doing to improve the dumpster area?Are you tearing it down?Seib:Yes,tearing it down and adding fencing made up of black metal with wood slats,about a 10-ft high wall.You will be able to see very little of the top of the generator,but it's about 14-ft high so to put a fence that tall will create an eye sore where one was not before. The generator was replaced in the first couple of weeks of our ownership. Kirsh: To summarize: • You will contribute to the Non-Reverted Thoroughfare Fund for the 635-ft of sidewalk. • Bicycle parking will be added. • A portico will be added. • Amend the trash dumpster and generator enclosure. • Materials colors—commissioner Zoccola made comments for you to consider. • Low level landscape lighting and up lighting is proposed and string lights in the patio area—compliant with Cannel's lighting standards. • Landscaping needs to be brought into compliance with the original landscape plan,any dead, dying or missing plants needs to be replaced.Petitioner proposes to replace the landscaping around the main entrance and portico area and continues to work with the Urban Forester addressing any remaining reviews. Seib: Yes,there are about 6 trees that need to be removed. • Signage plan has been provided and it requires a Variance for signage.You will work with Staff and BZA on that. • Chain-link fence is proposed to be replaced.Will this happen? Seib: Yes A Motion made Christine Zoccola and seconded by Leo Dierckman to approve PZ-2023-00001 ADLS Amend 111 conditioned upon: • Addressing all remaining TAC review comments, • "Beefing up"the Porte Cochere column widths, • Adding 2 inverted U bicycle parking racks(for 4 bike parking spaces), • Coming into Multiuse Path compliance, • Contributing to the Non-Reverting Throughfare Fund for the 635-ft of sidewalk, • Seeking necessary BZA variances, • Finalizing permits/approvals needed for patio construction, • Keeping lighting plan in compliance with City of Carmel Standards, • Updating the Trash Dumpster/generator enclosure,and • Continue to work with Urban Forester to bring Landscaping up to compliance. Approved 4-0. 2. Docket No.PZ-2022-00224 OA: BJ's Wholesale Club-146th&Keystone PUD Amend. The applicant seeks to amend the PUD to add accessory uses and update various other development standards requirements to construct a BJ's Wholesale Club building. The site is located at 14480 Lowes Way.It is currently zoned PUD:Z-344- 146th&Keystone Ave.PUD.Filed by Marc LaVoie,PE,of BJ's Wholesale Club,Inc. Petitioner: Steve Hardin: Plan commission review items have been addressed and resolved.Outstanding items: 1. Work on our additional underground gas storage tanks including underground tank protective measures in the event of a surface spill. The team has worked with John Thomas recently and an agreement was reached to work with them,but not clear about what is the very best way to accomplish this task.The Development team 2 Commercial Committee Meeting Minutes 2-7-23 agrees with what the goal is and is committed to working with the city as the Staff has asked and do whatever is best to resolve this item. 2. Staff mentioned that the entrance to the building coming off Lowes Way is offset,it requires and extra turn to reach the entrance. Staff requested to simplify the unnecessary turn.Development team will work on updating entrance to avoid unnecessary maneuvers by the time the project is ready for DP ADLS. 3. Leo Dierckman had requested the team to provide examples of perspectives. Exhibits came in and were circulated.One has the aerial exhibit on front page with keys. Leo Dierckman was satisfied. Department Report:Mike Hollibaugh: Mr. Hardin touched on all the high points. Staff is pleased with the progress in the site,building,and architecture design.Feels like issues have been addressed.The pledge to continue to work with engineering is important,as well as the refinement of the access points into the site and parking area. Staff feel confident this can move on knowing that we will see this again at DP ADLS and Council. Committee Comments: Zoccola: Voiced concern about the location of the gas station.Ordinance says that the vent pipes must be 500-ft away from residentially zoned properties.Confirmed that requirement is fulfilled.Voiced concern with the runoff into Cool Creek. Is this the piece you are working on with Engineering and low best to minimize that?Hardin:yes,when you are filling with a tanker to fill tanks underground, if there is a spill)on the surface there are different strategies for how to contain that.Zoccola: Is it possible being so close to Cool Creek to come up with a solution to contain that?Jason Carr: We had a positive discussion with John Thomas and Alex Jordan from your storm water division,we look at those spill scenarios and we consider the fuel transfer at the end of the ground storage tanks as well as the fuel transfer at the dispensers where a customer would be filling up. Two volumes and flow rates and scenarios.The goal is to contain everything.We will work closely with John to solve this concern.We discussed something like a flooding test Ito see where the water would go. It will be a very complete analysis.Zoccola: I am supportive of this project;this is my biggest concern with this project. Aasen: We said there are different factors that come into play with the positioning of the gas station,you can't move it any more in one direction because then you get into the 500ft,then if you move it closer to the creek that increases the concern even taking the safety measures,then there was third consideration that was the way the parking and the flow would work. So,can you explain how we got to the decision that there were no better options and that this was the best location to put the gas station. Gene Beiermann:We looked at this in multiple directions. We worked closely with Staff. We have the 500-ft of separation that must be met(over 550-ft).The only other option is to move it to the north right in front of the primary entrance. This is an operations,traffic,and life safety concern.Mark LaVoie: There were concerns with queuing and we believe that where the fuel is located is a perfect location so the fueling won't impact the entrances,curb cuts coming into the parking lot.Aasen: The important answer here was traffic safety.Make sure you repeat that at Council.Zoccola: Is the gas station open to members only,which would mean reduced traffic? Hardin: Members only.Dierckman: Right turn out only onto Lowes Way, is that for cars and trucks?Will the radius work for trucks?Marc LaVoie: Yes,we will make sure it does.Kirsh: If this is designed as best as possible and it can become a model for the way gas stations should always be built,then you will find a community that is glad to say yes to this gas station this close to residential as well as a water way.As long as you keep working with John Thomas,I feel comfortable knowing there are still a few more steps. Items met: • Minimum set back • Architectural design and parking requirements • Outside storage or refuse and merchandise requirements • Sign PUD has been updated to resemble the UDO more closely • Bike parking,overnight parking,and offsite roadway improvements • No commitments required for nuances mentioned on Department report because this will be reviewed again at the DP ADLS stage Steve Hardin confirms these have all been met. 3 Commercial Committee Meeting Minutes 2-7-23 Aasen motions to send this to City Council with a favorable recommendation.Zoccola seconded contingent to continuing work with Engineering and have a plan so there is no runoff into Cool Creek and work with Engineering on the traffic access piece.Adam Aasen agrees to amendment to motion. A Motion made by Adam Aasen and seconded Christine Zoccola by to send PZ-2022-00224 OA to the City Council with a favorable recommendation contingent on continued work with Engineering to prevent runoff into Cool Creek and improving traffic access. Approved 4-0. 3. Docket No.PZ-2022-00237 DP/ADLS: Carmel Medical Office Building at The Bridges. The applicant seeks site plan and design approval for a new,three-story medical office building on 9.23 acres. The site is located at the SW corner of Illinois Street and Pittman Way,south of the Market District grocery and west of the KAR office building. The future address will be 11380 Illinois Street.It is zoned PUD (The Bridges Z-550-11)and is not within any overlay district.Filed by Nathan Winslow of American Structure point on behalf of the owner,Cornerstone Companies. Petitioner: Nathan Winslow: Concerns brought up during the previous Plan Commission hearing: • Drainage issues both adjacent to and on our site,as well as further north into the overall Bridges development. Steve Pittman is here to explain. There has been communication between owners expressing the PC concerns. Communication has been included with our resubmittal package. Is there any feedback you have received? Steve Pittman: Property was sold in March 2017 and then sold again. I was able to track down the person in charge with Eco Bridges Properties.They are aware that there is a problem and says that while the system appears to be working well,he believes there are still issues.He mentioned there are questions about the water feature going away and becoming landscaping.He didn't want to make commitments on that,but they are open to the possibility. They are a separate property, separate petition,and they are not responsible for that. I wanted to communicate this here.My reputation is attached to property as the original developer.I am glad to work with the City and new owner to make sure this gets taken care of as expected. Winslow: • Questions about what the visuals would be from the new Steadman apartments across the street. Would they see the mechanical equipment from the top floor of those buildings?We submitted a rendering showing that view with the resubmittal package.All mechanical equipment on the rooftop will be fully screened. • Included renderings of dumpster enclosure showing that it matches the aesthetics of the building.It is now in compliance. • There was some discussion about the landscaping and what it might look like from the apartments.Produced exhibit showing trees proposed on our site relative to the street along the apartment site.You will see adjacent to what we are developing, it is significantly denser on our site because of the parking lot.We feel this is a very visual aesthetic screening element we have implemented to further enhance the view from the apartments across the street. Zoccola: What is distance from the trees.Albert Radomski: It's approximately 10-ft between the back of the sidewalk and the back of the parking lot. There is a 4 to 5-ft strip between the sidewalk and curb line.The trees will be behind the sidewalk so there is room for the root system to grow. Dierckman: Is the water feature going to stay with the current ownership of the building or is it ultimately going to end up under different ownership?Jeff Shively:that will be part of the current ownership.Winslow:As part of the overall engineering development approval process,we will have to prepare an operations and maintenance agreement to be signed and recorded.That essentially gives the City authority to enforce lack of maintenance. Zoccola: How much parking do you have here.Aasen: You had more than you needed anticipating futures.Zoccola: So,you are anticipating whatever goes next?Hollibaugh: 211 are proposed. Shively: The users require just over 4 spaces/1000sf,we are just over that;our goal is to make this a whole medical campus.Winslow: We are in negotiations with users which are confidential right now. Shively: We are looking at a medical office northeast, potentially a surgery center northwest,and a medical office south of empty space. Dierckman: Do the Traffic studies indicate that this is still an acceptable utilization level?Winslow: it is my understanding. Aasen: I feel comfortable that concerns with the existing water feature will be addressed.I noticed that the questions 4 Commercial Committee Meeting Minutes 2-7-23 of showers and bicycle parking have been brought up.Is there a reason the employees would not utilize these services? Shively:As a result of the pandemic much of the typical medical office space scheduling is being done from home,so Iwhat we have are employees who are very transient. They spend half a day in clinic and half a day in a surgery center which will not be in the same building.Very few people who would be there 8hr/day.Zoccola: Is there space available to add a shower if someone had the need?Shively: We would have to have one of the first-floor tenants sacrifice some of their programs.That could be a PED CT going away.Aasen: The showers are not as much of a concern to me as a bicycle parking.It is an easier, less costly fix.Is there more for long term parking?Radomski: We have some exterior parking. Shively: It's the long term and overnight parking that was in question. Kirsh: A good compromise is to provide covered bike parking,not just U-shaped hoops by the front door.A nice, covered parking with a bike pump and fix it stations to try and meet the UDO requirements.Then as you move forward with the rest of the projects,maybe there would be a space where there are two showers,some lockers,and overnight, long term bicycle parking should we decide that this is feasible.I am not asking for a commitment,but if we can get a commitment for good,covered bike parking at this facility and a consideration that with the synergy of what is going on in this future development you may be able to work out a shower and some lockers in the future. Shively: We could commit to a covered outdoor bicycle parking at this building location and as the rest evolves,we can consider accommodating for long term indoor bicycle parking and a couple of showers. Department Report:Mike Hollibaugh: It is disappointing to have this issue continue to be what we,as we get to the end,must fight for.It being something that was part of the PUD and was purposely integrated and successfully achieved at the Market District building. We are not picking who is using it and whether they needed it today.Tomorrow they may wish they had it. This is a provision in the PUD that should have been designed for but has been ignored. I do like the proposed compromise,but it does not get them past the need for BZA approval.As Rachel has stated in the Dept.report,we are happy to continue to work with you on that issue,but when it does get to the BZA we are not likely to support the variance request. IShively: The issue is the tenants who asked for aCT which is a high revenue producing piece of equipment which affects the assessed value of the building.Zoccola: This kind of construction is expensive,CTs,MRI's,etc.Kirsh:to Director Hollibaugh's point you are in a PUD that is already established,you know what the requirements are. Zoccola: I would not want any of these services lost we have to fmd a way to make it work.Kirsh: We are trying to solve the problem and trying to do right by what was already established. How do we feel about there being continued development here. Can you make a commitment that showers will be available moving forward so so there will be future access to a shower?Aasen: was not on council when this was originally passed.I remember covering this and it was a controversial City Council decision to put this into the plan development. The Chamber of Commerce opposed it. But it is the law,other parts of the development have had to do that.I feel comfortable leaving it up to the BZA to decide.Zoccola: I am more concerned about the gas station. This is going to be a medical campus,which is so much better that many other proposals. This will provide great service to the community. When the ambulatory surgery center comes through,plan ahead and have the showers there. Shively: That is easy to do,because you must have showers there anyways to make it work. Dierckman: Where are planning on putting the garbage?Winslow: Enclosure is planned on Northeast of the development. There will be landscaping surrounding it and a screen wall.Hollibaugh: Staff is satisfied with location and design.Dierckman: I like the suggestion for covered spaces outside and showers and changing facilities at another building down the road.But the problem with this is disseminating information about its availability to everyone will be an issue.From a practical standpoint over time, it may not happen.Josh Kirsh: What if you have two unisex bathrooms with showers on the first floor instead of just bathrooms on the first floor?Not sacrificing any space, a family style restroom with a shower and six lockers. Shively: One unisex bathroom was planned,but we could add a shower and six lockers.Dierckman: And we are getting covered outdoor bicycle parking. Shively: Yes.Kirsh: To me this is a reasonable compromise.Hollibaugh: I don't know if that requires BZA,I will have to double check with Staff if there is a square footage requirement.I do think this compromise would address this PUD requirement.Kirsh: One unisex bathroom on the first floor,how many Iother bathrooms so you have?Shively: They are all within the suites and one unisex in the common area. Committee Comments: Josh Kirsh: Commitments: • Interior shower 5 Commercial Committee Meeting Minutes 2-7-23 • Changing Facility • Long Term bicycle parking Winslow: Will you verify that this would not require variance?Hollibaugh: I will verify. Motion: Christine Zoccola makes a motion to send to send back to the Full Plan Commission with a favorable recommendation with the outlined commitments. Seconded by Adam Aasen. A Motion made by Christine Zoccola and seconded by Adam Aasen to send PZ-2022-00237 DP/ADLS to the Feb.21 Plan Commission meeting with a favorable recommendation. Approved 4-0. 4. Docket No.PZ-2022-00238 ADLS: Tru Hotel Carmel. The applicant seeks design approval for a new,five story, 126 room hotel on 1.13 acres.Development plan approval was granted under Docket No. 19060018 DP and Use Variance approval was granted under 18050007 UV. The site is located at 12164 N.Meridian Street, immediately north of the Ritz Charles.It is zoned MC/Meridian Corridor and is not within any overlay district. Filed by Nathan Winslow of American Structurepoint on behalf of the owner,Dora Hotel Group. Petitioner: Nathan Winslow: Presented and summarized.Added the existing monument sign on Illinois with a request that it be modified with updated labeling to add the Tru Hotel.One of the biggest items outside architectural detail is the shared parking, so we have included a shared parking analysis showing peak hour breakdowns(between 8-l0am and 3-5pm). Based on this assessment there is a surplus of available parking. Vince Dora: Biggest thing to highlight is off-time use,hotel typically 5pm-7am with people staying overnight assuming we are 100%occupied versus Ritz Charles being full during the daytime, if there is a bigger event at night, in theory,we would be working together assuming guests would be shared. Same thing with medical office,it is a purely daytime use in comparison to hotel where guests are gone during the day and back at night.Aasen: In the scenario where Ritz Charles has a big wedding with local people who are not staying at hotel and the hotel is booked with Grand Park guests,if both are fully booked,how much space is available?Dora: This parking analysis didn't include the Ritz Charles parking lot because we don't have an easement on their site. The parking we have is only on the medical office building and the hotel.Aasen: So,if there is any issue it would be on the Ritz' side, spilling over to your site,more than the other way around.Dora: Yes. Winslow: Discussed correspondence with neighbors concerning the height of the building,as part of the original development plan there was a request to densify the site;using number of stories as a measure is misleading. Comparing to the surrounding buildings are listed as 3 stories,but the architecture extends up to about 60' which is roughly in line with what our building is at 5 stories which is necessary from a financial standpoint.Lighting that is adjacent to the neighborhood is existing,we are not adding additional lighting to the parking lot.New lighting will be on the building and most of that will be directed away from the residential side,mostly towards Meridian St.and the 31 corridor. John Hafner(virtual): Revised filing which illustrates the result of the with Hilton, input from developer,etc. including revised exterior elevations,3 additional renderings that better show what this will look like in 3D,and the original filing. Elevations: feedback revolved around amending the exterior to make more sense to provide a more traditional base for the building to sit on. There were objections to the asymmetric randomness of some of the features,having too much EIFS,and not enough brick. South Elevation: Compared old and new.Rachel expressed a dislike for the louvers that cover the guestroom AC units to be so visible and objected to the random splash of blue color. Changed to: • A uniform stone base material,a large format substantial base made up of larger masonry units. • We are no longer interrupting the base with vertical elements,eliminated random splashes of blue color on both ends,cleaned up the roofline so it makes more sense with the overall building massing,and added a panel system (Trespo rain screen),which looks like metal panels,but much more durable, low maintenance and less susceptible to weather. • Introduced a new durable cementitious material,a fiber cement panel which comes'with a scored pattern for texture and rhythm. • Tried to pull the background colors together, so they are in gray tones on both bumped-out areas. 6 Commercial Committee Meeting Minutes 2-7-23 • Cleaned-up the porte-cochere with the permission from Hilton to downplay the colors except at the entry area. Hilton had a few sacred hallmarks which in their mind cannot be deviated from,but it has been seen done, so it might be possible if you feel strongly about going back to Hilton saying it may be a deal breaker:those are entry feature,the multi-color vertical bands,and the wedge feature. • We will be custom coloring the louvres to match the adjacent wall fmish,we took the mullions out of the windows to make them appear more clean,open,and modern. Daytime rendering:we made more logical sense of the use of materials,provided a strong base statement,used strong colors where Hilton requested,but the rest we have stayed with earth tones. There is EIFS left on building on some areas. Nighttime view:A concern brought forth at last meeting was to be careful of lights spilling towards neighborhood. • We have no illuminated signage along the west façade • We have some light highlighting the entry at pedestrian level,which is needed for occupant safety. • We have kept it focused on a pedestrian scale which provides clues where to fmd the building entrance. • We eliminated the potential glare of illuminating the edge on East elevation.It is our intent to have some LED lighting inside the rain screen that will leak through the joints in it because they are open joints,but our renderer didn't pick-up on lighting on wedge. On our first pass we had 14.9% stone,48%EIFS, 13%metal panels,24%glass/metal doors and windows. On the revised design we have 14%cultured stone,29%EIFS,32%fiber cement panel,less metal panels,and 24%doors and windows.Looked at UDO and some of the language leaves room for interpretation,but we are within the requirements and restrictions,much of that is subjective.Winslow:Reiterated need to update ground sign on Illinois to include signage for the Tru Hotel. Department Report: Mike Hollibaugh: Staff is appreciative of efforts to make refinements to building and project.Coming from the Public Hearing,the message was received by the petitioner and met immediately with Staff.The updated building is clearly an Iimprovement.It is up to the Committee if it has moved far enough along. Staff has some Ordinance related comments related to the architecture and John touched on those.We are still missing some key items related to bike parking, questions related to lighting,some details are not understood on our part.Rachel is asking that we hold it and continue working on refinements. Committee Comments: Dierckman:Please bring a rendering that turns building on four sides for the next meeting. I will not sign off on colors,this is strictly branding in my view,the whole building is a sign.Maybe the sign and canopy but the third element is not acceptable in my opinion.We need an understanding of what the color inside of the wedge will be, it should be white,no branding.Underneath canopies, it must also be white light. The banding on the front, as a directional element,I can pass that. Winslow: The original rendering highlights the original intent of the lighting.Bright lights on the edge,would not be visible.The cornerstone piece was a feature Rachel wanted. Zoccola: Is there somewhere we can see an example of this?How much EIFS can we have?Vince: The True Downtown has similar materials/features. Hollibaugh:there is no max or min except of standards that it is not within 8' and that the building materials be high quality and durable on all facades.Zoccola: We are down to 20%,can that be reduced.Vince: we need to be careful on cost.EIFS is durable and it lasts as long as fiber cement panels.Zoccola: This is better,but not quite there yet.As far as more buffering from the neighbors.Are there any plantings or trees on the Illinois street parking lot?Photo was pulled up. There are no trees or area to plan trees.Kirsh: looked at this,there is no great solution. Street Department has decided to no longer trim/top the bushes on the west side of Illinois to allow them to continue to grow above the privacy wall.On the east side of Illinois there are too many utilities to be able to do substantial plantings. There are a couple of spots where trees can be planted,there is a median that is tree lined.The issue is what is the view from 31 or the perspective of neighbors from the 2°a floor.Zoccola: How do you shield residents?Kirsh: Trying to come up with Ia solutions. How do we compromise to make this work in our city. Why do we have to have a portico on that side of the building at all?Can we move the portico to the south side of the building.Can we make the west facing façade very bland,basically the dark element with a lighter element running next to it for architectural detail but made basic. There are plenty examples of Tru hotels without the color tiles,maybe we can shift tiles around the corners so you can see them from 31,but not from Illinois. These are the kinds of compromises I would like to see.Dierckman: There is 7 Commercial Committee Meeting Minutes 2-7-23 a long list of issues not met and that should not be the case.You need to design to meet the requirements.If they were earth tones,but this is a billboard. This is as if the architect never read the requirements.We have focused for the past 25 years on making high quality decisions along that corridor,as designed this adds no value to the design and the concept of Meridian St. We want quality.Zoccola: More work needs to be done.Aasen: Agree with the bands.It should look good on all sides.I see many examples of the hotel not having it,I would encourage you to have that conversation with Hilton. For me the big thing are the colors and lighting.There is still a question on the lighting on sign. How bright is this,I want more information about that.If there is anything we can do on landscaping or on the first floor to make it nicer as people come into the property. Kirsh: The Committee will want you to do more work and come back. Dora: As to the orientation for the entrance,as a hotelier trying to be hospitable to guest, it was important to shift the entrance to the west,because that is where parking is.That extra 100-ft is a big deal for ease of entrance in inclement weather.Additionally,the traffic flow patterns when you are trying to drop people off on the north facing entrance between the medical office building and the hotel did not work well. We wanted to avoid an entrance on east along 31 because it is confusing as to how to get in,you see that today with the Ritz Charles building.Utilities are pulled within 5 or 10 feet of the where the building is going to go, it's pad ready. There is not enough space on the south side,and I don't see a way to fixing that. Winslow: It would take a major undertaking to make that change, it would be many agreements with the Ritz and downtime for them due to a significant impact on their flow to their building. Dora: On the west side,I thought we accomplished the blandness in that there are no lights on stairwell,no windows on that side of building,this is minimal light pollution. We need lights on the ground floor of the building for safety and welcoming feature.Dierckman: This is not an easy site;I respect what you are trying to achieve here.I am not too concerned about that lighting. Dora: Regarding the comments about the color of bands.I have no ability to affect Hilton's decision making and design. With your support,I can take that to them to help change it.There are one or two Tru hotels with earth tones checkered pattern in Grove City,Ohio.Zoccola: I would like to see that. Sometimes high-quality materials make a difference,I am still struggling with the EIFS material.I will go look at it.As councilor Austin said,adding landscaping would help visual.Winslow: We can look into that.Dubbie:Agree with all the points. What is the rack rate.Dora: This is meant to be an economy brand by Hilton,but that is not what happened, it's been so successful that Hilton has come up with another economy brand to replace this one.Dierckman: Grove looks better,Zoccola agrees. Dora: northside Hotels are doing better than the downtown properties right now.Dubbie: Comparable to Hyatt place? Vince:Above price,at the same level of condition.Kirsh: Do you need more information from us?Winslow: I am clear.Hafner: I do not have any additional questions.I think Vince probably stated it clearly that we needed something strong to go back to Hilton.Kirsh: We will table this until a future date.I want to see what it will look like from adjoining neighborhoods,please provide that rendering. There is a small median between your parking lot and the Ritz's overflow parking lot.Dora: It's a landscaped elevated hill.Kirsh: If there is any trees or landscaping that can go there too or bushes.Vince: We are going to have a stairwell going down so we can connect the parking lots for ease of access. Winslow: We have to make sure there are no utilities running there. This item will continue at the March 7, 2023 Commercial Committee Meeting ed at :06 PM. Aliza Shalir/ Recording Secretary os ua Kirsh Committee Chair 8 Commercial Committee Meeting Minutes 2-7-23