Loading...
HomeMy WebLinkAboutAllison II PR2G05/15/23 ATTIC VENT SCHEDULE VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE ** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS * SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION ELEVATION PR2G ROOF AREA "A" SQ FTG 2031 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 2.71 3.39 3.39 49.39 8 0 AT EAVE 4.06 3.39 3.47 50.61 0 50.00 TOTAL (MIN) 6.77 6.77 6.86 100.00 HIGH - RIDGE VENT 2.71 3.39 0.00 ####0 0 0.00 AT EAVE 4.06 3.39 0.00 ######0 0.00 TOTAL (MIN) 6.77 6.77 0.00 ###### ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ROOF AREA "B" SQ FTG 549 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 0.73 0.92 0.85 44.85 2 0 AT EAVE 1.10 0.92 1.04 55.15 0 15.00 TOTAL (MIN)1.83 1.83 1.89 100.00 HIGH - RIDGE VENT 0.73 0.92 0.00 ####0 0 0.00 AT EAVE 1.10 0.92 0.00 ######0 0.00 TOTAL (MIN) 1.83 1.83 0.00 ###### ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE AMBLESIDE: Grids 4 Sides are Required per PUD ~ 24' - 4 1/8''3060 3060 3053 3053 2030 3040 2020 2020 2020 2020 2020 2020 4020 3060 3060 3060 3060 3060 3060 3030 3030 3030 3030 3060 3060 3030 3030 3030 3030 3030 3053 3053 3053 6 6 6 6 6 6 6 6 66:126:126:126:126:126:126:126:126:126:12PR2G 05/15/23 05/15/23 ELEVATION PR2G ADDITIONAL 1ST FLOOR - HEATED 0 TOTAL 1ST FLOOR 1829 ADDITIONAL 2ND FLOOR - HEATED 18 TOTAL 2ND FLOOR 1526 TOTAL ELEV. HEATED 3355 ADDITIONAL GARAGE - 3 CAR FRONT 0 TOTAL GARAGE 609 ADDITIONAL BASEMENT 0 TOTAL BASEMENT 1251 FRONT PORCH 156 TOTAL ELEV. FOOTPRINT 2594 05/15/23