Loading...
HomeMy WebLinkAboutMaplevalley NC2GCZ 0.10 05/15/23 A3-NC2G-B 3FB.1 ROOF AREA "E" SQ FTG 200 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 POT VENTS ONLY 0.27 0.33 0.42 43.26 1 0 AT EAVE 0.40 0.33 0.56 56.74 0 8.00 TOTAL (MIN)0.67 0.67 0.98 100.00 RIDGE VENT 0.27 0.33 0.38 47.37 0 0 3.00 AT EAVE 0.40 0.33 0.42 52.63 0 6.00 TOTAL (MIN) 0.67 0.67 0.79 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ELEVATION NC2G ATTIC VENT SCHEDULE ROOF AREA "B" SQ FTG 163 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 POT VENTS ONLY 0.22 0.27 0.42 46.56 1 0 AT EAVE 0.33 0.27 0.49 53.44 0 7.00 TOTAL (MIN)0.54 0.54 0.91 100.00 RIDGE VENT 0.22 0.27 0.25 41.86 0 0 2.00 AT EAVE 0.33 0.27 0.35 58.14 0 5.00 TOTAL (MIN) 0.54 0.54 0.60 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ROOF AREA "A" SQ FTG 1717 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 POT VENTS ONLY 2.29 2.86 2.54 44.31 6 0 AT EAVE 3.43 2.86 3.19 55.69 0 46.00 TOTAL (MIN) 5.72 5.72 5.74 100.00 RIDGE VENT 2.29 2.86 2.75 47.37 0 0 22.00 AT EAVE 3.43 2.86 3.06 52.63 0 44.00 TOTAL (MIN) 5.72 5.72 5.81 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE AMBLESIDE: Grids 4 Sides are Required per PUD NC2G ~ 26' - 10 3/8''2020 3053 2020 2020 2020 2020 2020 3060 3060 3060 3060 3060 3060 3010 3010 3010 3040 4010 30533053 3053 3053 3053 3053 2040 2040 3050 3053 3060 30533053 3053 2040 05/15/23 A3-NC2G-B 3FB.2 05/15/23 A3-NC2G-B 3FB4.3 NC2G ADDITIONAL 1ST FLOOR - HEATED 0 TOTAL 1ST FLOOR 1351 ADDITIONAL 2ND FLOOR - HEATED -4 TOTAL 2ND FLOOR 1367 TOTAL ELEV. HEATED 2718 ADDITIONAL GARAGE - 3 CAR FRONT 200 TOTAL GARAGE 787 ADDITIONAL BASEMENT 0 TOTAL BASEMENT 1258 FRONT PORCH 74 TOTAL ELEV. FOOTPRINT 2212 LIGHT & VENT SCHEDULE ROOM NAME AREA REQUIRED SUPPLIED LIGHT VENT LIGHT VENT BEDROOM 2 127.00 10.16 5.08 11.70 5.90 FLEX 142.00 11.36 5.68 13.70 5.90 ** REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE. 05/15/23