HomeMy WebLinkAboutMaplevalley NC2GCZ
0.10
05/15/23
A3-NC2G-B
3FB.1
ROOF AREA "E" SQ FTG 200 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
POT VENTS ONLY 0.27 0.33 0.42 43.26 1 0
AT EAVE 0.40 0.33 0.56 56.74 0 8.00
TOTAL (MIN)0.67 0.67 0.98 100.00
RIDGE
VENT 0.27 0.33 0.38 47.37 0 0 3.00
AT EAVE 0.40 0.33 0.42 52.63 0 6.00
TOTAL (MIN) 0.67 0.67 0.79 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE
ELEVATION NC2G
ATTIC VENT SCHEDULE
ROOF AREA "B" SQ FTG 163 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
POT VENTS ONLY 0.22 0.27 0.42 46.56 1 0
AT EAVE 0.33 0.27 0.49 53.44 0 7.00
TOTAL (MIN)0.54 0.54 0.91 100.00
RIDGE
VENT 0.22 0.27 0.25 41.86 0 0 2.00
AT EAVE 0.33 0.27 0.35 58.14 0 5.00
TOTAL (MIN) 0.54 0.54 0.60 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE
ROOF AREA "A" SQ FTG 1717 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
POT VENTS ONLY 2.29 2.86 2.54 44.31 6 0
AT EAVE 3.43 2.86 3.19 55.69 0 46.00
TOTAL (MIN) 5.72 5.72 5.74 100.00
RIDGE
VENT 2.29 2.86 2.75 47.37 0 0 22.00
AT EAVE 3.43 2.86 3.06 52.63 0 44.00
TOTAL (MIN) 5.72 5.72 5.81 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE
AMBLESIDE: Grids 4 Sides are Required per PUD
NC2G ~ 26' - 10 3/8''2020
3053
2020 2020
2020 2020 2020
3060 3060 3060 3060 3060 3060
3010 3010 3010
3040
4010
30533053 3053
3053 3053 3053
2040
2040
3050
3053
3060
30533053 3053
2040
05/15/23
A3-NC2G-B
3FB.2
05/15/23
A3-NC2G-B
3FB4.3
NC2G
ADDITIONAL 1ST FLOOR - HEATED 0
TOTAL 1ST FLOOR 1351
ADDITIONAL 2ND FLOOR - HEATED -4
TOTAL 2ND FLOOR 1367
TOTAL ELEV. HEATED 2718
ADDITIONAL GARAGE - 3 CAR FRONT 200
TOTAL GARAGE 787
ADDITIONAL BASEMENT 0
TOTAL BASEMENT 1258
FRONT PORCH 74
TOTAL ELEV. FOOTPRINT 2212
LIGHT & VENT SCHEDULE
ROOM NAME AREA
REQUIRED SUPPLIED
LIGHT VENT LIGHT VENT
BEDROOM 2 127.00 10.16 5.08 11.70 5.90
FLEX 142.00 11.36 5.68 13.70 5.90
** REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE.
05/15/23