Loading...
HomeMy WebLinkAboutMaplevalley NC3SCZ 0.10 05/15/23 A3-NC3S-B 3FB.1 ROOF AREA "E" SQ FTG 200 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 POT VENTS ONLY 0.27 0.33 0.42 43.26 1 0 AT EAVE 0.40 0.33 0.56 56.74 0 8.00 TOTAL (MIN)0.67 0.67 0.98 100.00 RIDGE VENT 0.27 0.33 0.38 47.37 0 0 3.00 AT EAVE 0.40 0.33 0.42 52.63 0 6.00 TOTAL (MIN) 0.67 0.67 0.79 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ELEVATION NC3S ATTIC VENT SCHEDULE ROOF AREA "B" SQ FTG 164 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 POT VENTS ONLY 0.22 0.27 0.42 46.56 1 0 AT EAVE 0.33 0.27 0.49 53.44 0 7.00 TOTAL (MIN)0.55 0.55 0.91 100.00 RIDGE VENT 0.22 0.27 0.25 41.86 0 0 2.00 AT EAVE 0.33 0.27 0.35 58.14 0 5.00 TOTAL (MIN) 0.55 0.55 0.60 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ROOF AREA "A" SQ FTG 1728 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 POT VENTS ONLY 2.30 2.88 2.54 43.26 6 0 AT EAVE 3.46 2.88 3.33 56.74 0 48.00 TOTAL (MIN) 5.76 5.76 5.88 100.00 RIDGE VENT 2.30 2.88 2.88 48.48 0 0 23.00 AT EAVE 3.46 2.88 3.06 51.52 0 44.00 TOTAL (MIN) 5.76 5.76 5.93 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE AMBLESIDE: Grids 4 Sides are Required per PUD NC3S DO NOT Black Out Windows. Questions, Call ZBitt ~ 26' - 10 3/8''2020 3053 2020 2020 2020 2020 2020 3060 3060 3060 3060 3060 3060 3010 3010 3010 3040 4010 3053 3053 3053 3053 3053 3053 2040 2040 3050 3053 3053 305330533053 2040 05/15/23 A3-NC3S-B 3FB.2 05/15/23 A3-NC3S-B 3FB4.3 NC3S ADDITIONAL 1ST FLOOR - HEATED 0 TOTAL 1ST FLOOR 1351 ADDITIONAL 2ND FLOOR - HEATED 8 TOTAL 2ND FLOOR 1379 TOTAL ELEV. HEATED 2730 ADDITIONAL GARAGE - 3 CAR FRONT 200 TOTAL GARAGE 787 ADDITIONAL BASEMENT 0 TOTAL BASEMENT 1258 FRONT PORCH 167 TOTAL ELEV. FOOTPRINT 2305 LIGHT & VENT SCHEDULE ROOM NAME AREA REQUIRED SUPPLIED LIGHT VENT LIGHT VENT BEDROOM 2 127.00 10.16 5.08 11.70 5.90 ** REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE. 05/15/23