HomeMy WebLinkAboutMaplevalley NC3SCZ
0.10
05/15/23
A3-NC3S-B
3FB.1
ROOF AREA "E" SQ FTG 200 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
POT VENTS ONLY 0.27 0.33 0.42 43.26 1 0
AT EAVE 0.40 0.33 0.56 56.74 0 8.00
TOTAL (MIN)0.67 0.67 0.98 100.00
RIDGE
VENT 0.27 0.33 0.38 47.37 0 0 3.00
AT EAVE 0.40 0.33 0.42 52.63 0 6.00
TOTAL (MIN) 0.67 0.67 0.79 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE
ELEVATION NC3S
ATTIC VENT SCHEDULE
ROOF AREA "B" SQ FTG 164 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
POT VENTS ONLY 0.22 0.27 0.42 46.56 1 0
AT EAVE 0.33 0.27 0.49 53.44 0 7.00
TOTAL (MIN)0.55 0.55 0.91 100.00
RIDGE
VENT 0.22 0.27 0.25 41.86 0 0 2.00
AT EAVE 0.33 0.27 0.35 58.14 0 5.00
TOTAL (MIN) 0.55 0.55 0.60 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE
ROOF AREA "A" SQ FTG 1728 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
POT VENTS ONLY 2.30 2.88 2.54 43.26 6 0
AT EAVE 3.46 2.88 3.33 56.74 0 48.00
TOTAL (MIN) 5.76 5.76 5.88 100.00
RIDGE
VENT 2.30 2.88 2.88 48.48 0 0 23.00
AT EAVE 3.46 2.88 3.06 51.52 0 44.00
TOTAL (MIN) 5.76 5.76 5.93 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE
AMBLESIDE: Grids 4 Sides are Required per PUD
NC3S
DO NOT Black Out Windows.
Questions, Call ZBitt ~ 26' - 10 3/8''2020
3053
2020 2020
2020 2020 2020
3060 3060 3060 3060 3060 3060
3010 3010 3010
3040
4010
3053 3053 3053
3053 3053 3053
2040
2040
3050
3053
3053
305330533053
2040
05/15/23
A3-NC3S-B
3FB.2
05/15/23
A3-NC3S-B
3FB4.3
NC3S
ADDITIONAL 1ST FLOOR - HEATED 0
TOTAL 1ST FLOOR 1351
ADDITIONAL 2ND FLOOR - HEATED 8
TOTAL 2ND FLOOR 1379
TOTAL ELEV. HEATED 2730
ADDITIONAL GARAGE - 3 CAR FRONT 200
TOTAL GARAGE 787
ADDITIONAL BASEMENT 0
TOTAL BASEMENT 1258
FRONT PORCH 167
TOTAL ELEV. FOOTPRINT 2305
LIGHT & VENT SCHEDULE
ROOM NAME AREA
REQUIRED SUPPLIED
LIGHT VENT LIGHT VENT
BEDROOM 2 127.00 10.16 5.08 11.70 5.90
** REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE.
05/15/23