Loading...
HomeMy WebLinkAboutWestchester CR2GCZ 0.10 05/15/23 Craftsman 2G ATTIC VENT SCHEDULE VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE ** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS * SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION ROOF AREA "A" SQ FTG 1796 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 2.39 2.99 2.97 48.69 7 0 AT EAVE 3.59 2.99 3.13 51.31 0 45.00 TOTAL (MIN)5.99 5.99 6.09 100.00 HIGH - RIDGE VENT 2.39 2.99 2.75 45.21 0 0 22.00 AT EAVE 3.59 2.99 3.33 54.79 0 48.00 TOTAL (MIN)5.99 5.99 6.08 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ROOF AREA "B" SQ FTG 416 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 0.55 0.69 0.85 54.95 2 0 AT EAVE 0.83 0.69 0.69 45.05 0 10.00 TOTAL (MIN)1.39 1.39 1.54 100.00 HIGH - RIDGE VENT 0.55 0.69 0.63 42.86 0 0 5.00 AT EAVE 0.83 0.69 0.83 57.14 0 12.00 TOTAL (MIN)1.39 1.39 1.46 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE AMBLESIDE: Grids 4 Sides are Required per PUD 3060 3053 3060 30533053 2020 2020 3060 3060 3060 3060 2040 3053 3053 3053 4010 40104010 3053 3053 3053 2040 3050 6 6 6 6 6 6 6 6 6 6 6 6 6:126:126:126:126:126:126:126:126:12 6:12 6:12 ~ 23' - 5 5/8''CR2G 05/15/23 ELEVATION CR2G ADDITIONAL 1ST FLOOR - HEATED 0 TOTAL 1ST FLOOR 1548 ADDITIONAL 2ND FLOOR - HEATED 32 TOTAL 2ND FLOOR 1784 TOTAL ELEV. HEATED 3332 ADDITIONAL GARAGE - 3 CAR FRONT 0 TOTAL GARAGE 640 ADDITIONAL BASEMENT 0 TOTAL BASEMENT 1448 FRONT PORCH 80 TOTAL ELEV. FOOTPRINT 2268 LIGHT & VENT SCHEDULE ROOM NAME AREA REQUIRED SUPPLIED LIGHT VENT LIGHT VENT LOFT 265.00 21.20 10.60 11.7 + ARTIF. 5.0 + MECH. FLEX 183.00 14.64 7.32 27.4 11.8 ** REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE. SCHEDULE of AREAS BASE HOUSE - HEATED FIRST FLOOR 1548 SECOND FLOOR 1752 TOTAL BASE HEATED 3300 BASE HOUSE - UNDER ROOF GARAGE - 2 CAR FRONT ENTRY 640 BASEMENT 1448 TOTAL BASE UNDER ROOF 2188 BASE OPTIONS - HEATED SUNROOM 144 REAR 4FT EXTENSION 69 SUNROOM W/ 4FT EXTENSION 196 CAFE BAY N/A CAFE BAY 2 N/A FINISHED BASEMENT OPTIONS FINISHED BASEMENT 978 FINISHED BASEMENT BATH 55 FINISHED BASEMENT BEDROOM 128 ADDITIONAL AREA W/ SUNROOM 129 ADDITIONAL AREA w/ GATHERING ROOM EXTENSION 58 ADD. AREA W/ SUNROOM & GATHERING ROOM EXTENSION 191 ADDITIONAL AREA w/ CAFE BAY 2 N/A MECHANICAL and STORAGE 470 BASE OPTIONS BASEMENT / SUNROOM 1592 BASEMENT / GATHERING ROOM EXTENSION 1517 BASEMENT / SUNROOM/GATHERING ROOM EXTENSION 1655 BASEMENT / CAFE BAY 2 N/A COVERED PORCH N/A SCREENED PORCH N/A 2 CAR SIDE ENTRY GARAGE 640 3 CAR FRONT ENTRY GARAGE 640 3 CAR SIDE ENTRY GARAGE N/A 2 CAR COURTYARD ENTRY N/A BASEMENT =========================>> ------------------------------------------------------------------------------------------------------------------- CRAWL =========================>> N/A N/A WOOD DECK 144 CONCRETE PATIO 144 OTHER 0 05/15/23