Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
O&M Manual
OPERATION & MAINTENANCE MANUAL For: THE CONCOURSE 550 MONON BLVD. CARMEL, IN 46032 Owner: Pedcor Development Co. 770 3rd Avenue SW Carmel, Indiana 46032 Prepared by: Circle Design Group 9229 Delegates Row, Suite 550 Indianapolis, IN 46240 May 4, 2023 TABLE OF CONTENTS Owner Acknowledgement Agreement (“Agreement”) 1.0 Introduction 2.0 Owner Information 3.0 Definitions and Understandings 3.1 Right of Inspections 3.2 Maintenance Commitment 3.3 Right of Entry 4.0 BMP Inspection, Monitoring and Maintenance 4.1 Aqua-Swirl BMP 4.2 StormTech Detention Chambers Isolator Row BMP Aqua-Swirl BMP Inspection Manual StormTech Isolator O&M Manual BMP Site Map Aqua-Swirl BMP Detail StormTech Isolator Row Detail Owner Acknowledgement Agreement (“Agreement”) For good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the undersigned owner (“Owner”) hereby submits this Operation and Maintenance Manual (“Manual”) to the City of Carmel, Indiana (“City”) as a written acknowledgement of Owner’s warranty and agreement to institute, maintain, and follow the water quality Best Management Practices (“BMPs”) listed below, and to follow and abide by the inspection schedule and maintenance activities listed in this Manual. The Owner also hereby agrees to provide, at Owner’s cost, all additional maintenance, repair, and/or replacement services reasonably necessary to maintain the function and longevity of the BMPs from and including the date this Agreement is executed by Owner to and including the date on which a new Agreement is filed with the City by another party who assumes all of the obligations and responsibilities of Owner as set forth herein. BMPs: 1 – Aqua-Swirl XCelerator XC-7 BMP 1– StormTech Detention Chambers Isolator Row BMP Owner Signature Date Printed Name Company STATE OF INDIANA ) ) SS: COUNTY OF ____________ ) BEFORE ME, the undersigned, a Notary Public in and for said County and State, personally appeared Owner subscribed and sworn before this day of , . County of Residence Signature Commission Expiration Date Printed Name O & M Manual The Concourse Carmel, IN 1.0 Introduction This document is a handbook for operating, inspecting, and maintaining stormwater BMPs at the Concourse building site in Carmel, Indiana. Included within is the entity responsible for the BMPs and the information needed to ensure that the BMPs continue to perform as designed over time. A location map is also included to indicate the location of the BMPs. The BMP owner shall be responsible for all fees as outlined in the Stormwater Ordinance Technical Standards, as well as all maintenance and costs associated the BMPs. Pedcor will provide all maintenance of BMPs using onsite maintenance staff and/or subcontractors under the direction of maintenance staff. 2.0 Owner Information BMP Owner Contact information for maintenance: Matt Boyle | Project Manager Pedcor Construction Management 385 City Center Drive, Suite 100 Carmel, IN 46032 Phone: 317.208.3761 Email: mboyle@pedcor.net 3.0 Definitions and Understandings BMP Definition: A Water Quality Best Management Practice (BMP) is a feature that treats stormwater in such a way as to improve the quality of the storm water passing through it. Improving the quality can mean decreasing the amount of total suspended solids (as from sediment laden water), lowering the temperature of runoff, removing trash & debris, as well as other improvements. 3.1 Right of Inspections: After the approval of the stormwater management permit by the City of Carmel and the commencement of construction activities, the City of Carmel has the authority to conduct inspections of the work being done to ensure full compliance with the provisions of this chapter, this document, and the terms and conditions of the approved permit. 3.2 Maintenance Commitment by Owner of BMP: Stormwater quality facilities shall be maintained in good condition, in accordance with the Operation and Maintenance procedures and schedules listed in the Indiana Stormwater Quality Manual or this document, and/or the terms and conditions of the approved stormwater permit and the Carmel City Code, and shall not be subsequently altered, revised, or replaced except in accordance with the approved stormwater permit, or in accordance with approved amendments or revisions in the permit. Checklists must be completed and maintained by the owner. It is required that the Owner submit annual BMP inspection reports to the City of Carmel. Reports may be submitted to: City of Carmel Storm Water Program One Civic Square Carmel, IN 46032 The first BMP inspection report is due one year after construction is completed, with subsequent reports due each year within the same month of the initial report. If there are any deficiencies found during the inspections, these should be addressed. If the inspection report is not received within the month it is due, if there are deficiencies which were not included in the report, or if any deficiencies included in the report are not addressed in a timely manner, the BMP owner faces enforcement action from the City of Carmel. 3.3 Right of Entry: The City of Carmel also has the authority to perform long-term, post-construction inspection of all public or privately owned stormwater quality facilities. The inspections will follow the operation and maintenance procedures included in this document and/or permit application for each specific BMP. The inspection will cover physical conditions, available water quality storage capacity and the operational condition of key facility elements. Noted deficiencies and recommended corrective action will be included in an inspection report. 4.0 BMP Inspection, Monitoring and Maintenance The following BMPs are included in the proposed site: Aqua-Swirl BMP StormTech Detention Chambers Isolator Row BMP See the sheets attached for more information about these BMPs and their location on the site. 4.1Aqua-Swirl BMP The following inspection and maintenance procedures should occur on an annual or as needed basis: Refer to the attached Aqua-Swirl Operation, Maintenance, and Inspection Manual for BMP Owners. 4.2 StormTech Detention Chambers Isolator Row BMP The following inspection and maintenance procedures should occur on an annual or as needed basis: Refer to the attached StormTech Chamber System for Stormwater Management – Isolator Row O&M Manual. Stormwater Treatment System Inspection and Maintenance Manual AquaShieldTM, Inc. 2733 Kanasita Drive Suite 111 Chattanooga, TN 37343 Toll free (888) 344-9044 Phone: (423) 870-8888 Fax: (423) 826-2112 Email: info@aquashieldinc.com www.aquashieldinc.com June 2022 © AquaShieldTM, Inc. 2022. All rights reserved. © AquaShieldTM, Inc. 2019. All rights reserved. Version_0419 Floatable trash & debris in the Aqua-Swirl® Aqua-Swirl® XCelerator Stormwater Treatment System The Aqua-Swirl® XCelerator Stormwater Treatment System (Aqua-Swirl® XCelerator) is a vortex-type hydrodynamic separator designed and supplied by AquaShieldTM, Inc. (AquaShieldTM). Aqua-Swirl® XCelerator technology removes pollutants including suspended solids, debris, and floatables from stormwater runoff. Both treatment and storage are accomplished in the single swirl chamber without the use of multiple or hidden, blind access chambers. System Operation The treatment operation begins when stormwater enters the Aqua-Swirl® XCelerator through a tangential inlet pipe that produces a circular (or vortex) flow pattern that causes contaminates to settle to the base of the unit. Since stormwater flow is intermittent by nature, the Aqua-Swirl® XCelerator retains water between storm events providing both dynamic and quiescent settling of solids. The dynamic settling occurs during each storm event while the quiescent settling takes place between successive storms. A combination of gravitational and hydrodynamic drag forces encourages the solids to drop out of the flow and migrate to the center of the chamber where velocities are the lowest. © AquaShieldTM, Inc. 2019. All rights reserved. Version_0419 Aqua-Swirl® XCelerator System Maintenance The long term performance of any stormwater treatment structure, including manufactured or land based systems, depends on a consistent maintenance plan. Inspection and maintenance functions are simple and easy for the Aqua-Swirl® XCelerator allowing all inspections to be performed from the surface. It is important that a routine inspection and maintenance program be established for each unit based on: (a) the volume or load of the contaminants of concern, (b) the frequency of releases of contaminants at the facility or location, and (c) the nature of the area being drained. In order to ensure that our systems are being maintained properly, AquaShieldTM offers a maintenance solution to all of our customers. We will arrange to have maintenance performed. Inspection The Aqua-Swirl® XCelerator can be inspected from the surface, eliminating the need to enter the system to determine when cleanout should be performed. In most cases, AquaShieldTM recommends a quarterly inspection during construction and for the first year of operation to develop an appropriate schedule of maintenance. The Aqua-Swirl® XCelerator should be inspected and cleaned at the end of construction regardless of whether it has reached its sediment storage capacity and/or other captured materials. Based on experience of the system’s first year in operation, we recommend that the inspection schedule be revised to reflect the site-specific conditions encountered. Typically, the inspection schedule for subsequent years is once per year. Maintenance The Aqua-Swirl® XCelerator has been designed to minimize and simplify the inspection and maintenance process. The single chamber system can be inspected and maintained entirely from the surface thereby eliminating the need for confined space entry. Furthermore, the entire structure (specifically, the floor) is accessible for visual inspection from the surface. There are no areas of the structure that are blocked from visual inspection or periodic cleaning. Inspection of any floatable debris can be directly observed and maintained through the manhole access provided directly over the swirl chamber. Inspection Procedure To inspect the Aqua-Swirl® XCelerator, a hook is typically needed to remove the manhole cover. AquaShieldTM provides a customized manhole cover with our distinctive logo to make it easy for maintenance crews to locate the system in the field. We also provide a permanent metal © AquaShieldTM, Inc. 2019. All rights reserved. Version_0419 Sediment inspection using a stadia rod information plate affixed inside the access riser which provides our contact information, the Aqua-Swirl® XCelerator model size, and serial number. The only tools needed to inspect the Aqua-Swirl® XCelerator system are a flashlight and a measuring device such as a stadia rod or pole. Given the easy and direct accessibility provided, floating trash and debris can be observed directly from the surface. Sediment depths can easily be determined by lowering a measuring device to the top of the sediment pile a nd to the surface of the water. AquaShieldTM recommends that the units be cleaned when sediment depth reaches 6 inches, representing 50% sediment storage capacity. The full sediment storage depth in the Aqua-Swirl® XCelerator is 12 inches. It should be noted that in order to avoid underestimating the volume of sediment in the chamber, the measuring device must be carefully lowered to the top of the sediment pile. Keep in mind that the finer sediment at the top of the pile may offer less resistance to the measuring device than the larger particles which typically occur deeper within the sediment pile. Aqua-Swirl® XCelerator Cleanout Procedure Cleaning the Aqua-Swirl® XCelerator is simple and quick. Floatable trash debris can be observed and removed directly through the 30-inch service access riser provided. A vacuum truck is typically used to remove the accumulated sediment and debris. An advantage of the Aqua-Swirl® XCelerator design is that the entire sediment storage area can be reached with a vacuum hose from the surface reaching all the sides. Since there are no multiple or limited (blind) access chambers in the Aqua-Swirl® XCelerator there are no restrictions to impede on-site maintenance tasks. ” © AquaShieldTM, Inc. 2019. All rights reserved. Version_0419 Vacuum (vactor) truck quickly cleans the single open access swirl chamber Disposal of Recovered Materials AquaShieldTM recommends that all maintenance activities be performed in accordance with appropriate health and safety practices for the tasks and equipment being used. AquaShieldTM also recommends that all materials removed from the Aqua-Swirl® XCelerator and any external structures (e.g, bypass features) be handled and disposed in full accordance with any applicable local and state requirements. Aqua-Swirl® XCelerator Inspection and Maintenance Work Sheets on following pages © AquaShieldTM, Inc. 2019. All rights reserved. Version_0419 Aqua-Swirl® XCelerator Inspection and Maintenance Manual Work Sheets SITE and OWNER INFORMATION Site Name: Site Location: Date: Time: Inspector Name: Inspector Company: Phone #: Owner Name: Owner Address: Owner Phone #: Emergency Phone #: INSPECTIONS I. Floatable Trash and Debris 1. Remove manhole lid to expose liquid surface of the Aqua-Swirl® XCelerator. 2. Remove floatable debris with basket or net if any present. II. Sediment Accumulation 1. Lower measuring device (e.g. stadia rod) into swirl chamber through service access provided until top of sediment pile is reached. 2. Record distance to top of sediment pile from top of standing water: inches. 3. Maximum recommended sediment depth prior to cleanout is 12 inches for all models. Consult system shop drawing for treatment chamber depth as measured from the inlet pipe invert to base of the unit. III. Diversion Structures (External Bypass Features) If a diversion (external bypass) configuration is present, it should be inspected as follows: 1. Inspect weir or other bypass feature for structural decay or damage. Weirs are more susceptible to damage than off-set piping and should be checked to confirm that they are not crumbling (concrete or brick) or decaying (steel). 2. Inspect diversion structure and bypass piping for signs of structural damage or blockage from debris or sediment accumulation. 3. When feasible, measure elevations on diversion weir or piping to ensure it is consistent with site plan designs. © AquaShieldTM, Inc. 2019. All rights reserved. Version_0419 4. Inspect downstream (convergence) structure(s) for sign of blockage or structural failure as noted above. CLEANING Schedule cleaning with local vactor company or AquaShieldTM to remove sediment, trash, and other floatable pollutants. The captured material generally does not require special treatment or handling for disposal. Site-specific conditions or the presence of known contaminants may necessitate that appropriate actions be taken to clean and dispose of materials captured and retained by the Aqua-Swirl® XCelerator. All cleaning activities should be performed in accordance with property health and safety procedures. AquaShieldTM always recommends that all materials removed from the Aqua-Swirl® XCelerator during the maintenance process be handled and disposed in accordance with local and state environmental or other regulatory requirements. MAINTENANCE SCHEDULE I. During Construction Inspect the Aqua-Swirl® XCelerator every three (3) months and clean the system as needed. The Aqua-Swirl® XCelerator should be inspected and cleaned at the end of construction regardless of whether it has reached its maintenance trigger. II. First Year Post-Construction Inspect the unit(s) every three (3) months and clean the system as needed. Inspect and clean the system once annually regardless of whether it has reached its sediment or floatable pollutant storage capacity. III. Second and Subsequent Years Post-Construction If the system did not reach full sediment or floatable pollutant capacity in the First Year Post-Construction period, the system can be inspected and cleaned once annually. If the Aqua-Swirl® XCelerator reached full sediment or floatable pollutant capacity in less than 12 months in the First Year Post-Construction period, the system should be inspected once every six (6) months and cleaned as needed. The unit should be cleaned annually regardless of whether it reaches its sediment or floatable pollutant capacity. IV. Bypass Structures Bypass structures should be inspected whenever the Aqua-Swirl® XCelerator is inspected. Maintenance should be performed on bypass structures as needed. © AquaShieldTM, Inc. 2019. All rights reserved. Version_0419 MAINTENANCE COMPANY INFORMATION Company Name: Street Address: City: State/Prov.: Zip/Postal Code: Contact: Title: Office Phone: Cell Phone: ACTIVITY LOG Date of Cleaning: (Next inspection should be 3 months from this data for first year). Time of Cleaning: Start: End: Date of Next Inspection: Floatable debris present: Yes No Notes: STRUCTURAL CONDITIONS and OBSERVATIONS Structural damage: Yes No Where: Structural wear: Yes No Where: Odors present: Yes No Describe: Clogging: Yes No Describe: Other Observations: © AquaShieldTM, Inc. 2019. All rights reserved. Version_0419 NOTES Additional Comments and/or Actions To Be Taken Time Frame ATTACHMENTS Attach site plan showing Aqua-Swirl® XCelerator location. Attach detail drawing showing Aqua-Swirl® XCelerator dimensions and model number. If a diversion configuration is used, attach details showing basic design and elevations (where feasible). © AquaShieldTM, Inc. 2019. All rights reserved. Version_0419 Aqua-Swirl® XCelerator TABULAR MAINTENANCE SCHEDULE Date Construction Started: Date Construction Ended: During Construction Month Activity 1 2 3 4 5 6 7 8 9 10 11 12 Inspect and Clean as needed X X X X Inspect Bypass and maintain as needed X X X X Clean System* X* * The Aqua-Swirl® XCelerator should be cleaned once a year regardless of whether it has reached full pollutant storage capacity. In addition, the system should be cleaned at the end of construction regardless of whether it has reach full pollutant storage capacity. First Year Post-Construction Month Activity 1 2 3 4 5 6 7 8 9 10 11 12 Inspect and Clean as needed X X X X Inspect Bypass and maintain as needed X X X X Clean System* X* * The Aqua-Swirl® XCelerator should be cleaned once a year regardless of whether it has reached full pollutant storage capacity. Second and Subsequent Years Post-Construction Month Activity 1 2 3 4 5 6 7 8 9 10 11 12 Inspect and Clean as needed X* Inspect Bypass, maintain as needed X* Clean System* X* * If the Aqua-Swirl® XCelerator did not reach full sediment or floatable pollutant capacity in the First Year Post - Construction period, the system can be inspected and cleaned once annually. If the Aqua-Swirl® XCelerator reached full sediment or floatable pollutant capacity in less than 12 months in the First Year Post-Construction period, the system should be inspected once every six (6) months or more frequently if past history warrants, and cleaned as needed. The system should be cleaned annually regardless of whether it reaches its full sediment or floatable pollutant capacity. An company 2 THE MOST ADVANCED NAME IN WATER MANAGEMENT SOLUTIONS TM ECCENTRIC HEADER MANHOLE WITH OVERFLOW WEIR STORMTECH ISOLATOR ROW OPTIONAL PRE-TREATMENT OPTIONAL ACCESS STORMTECH CHAMBERS )( Plan View SCALE 1:40 Elevation View SCALE 1:40 Projected View SCALE 1:70 2733 Kanasita Drive, Suite 111, Chattanooga, TN 37343 Phone (888) 344-9044 Fax (423) 826-2112 www.aquashieldinc.com Structure #: Drawn By: Scale: Date: OFlores Rvwed Rvw. Date U.S. Patent No. 6524473 and other Patent Pending Aqua-Swirl XCelerator Standard Detail As Shown 2/25/2021 el. Varies Inlet/Outlet Invert el. Varies el. Varies Grade (Rim) el. Varies XC-7 CCW XC-7 STD Aqua-Swirl Polymer Coated Steel (PCS) Stormwater Treatment System 12 in [305 mm] Manhole Frame & Cover Detail For Non-Traffic Areas Only NTS 48 in [1219 mm] Min. Gravel Backfill Concrete Wrap Compressible Expansion Joint Material to a minimum 1/2-inch [13 mm] thickness around top of riser to allow transfer of inadvertent loading from manhole cover to concrete slab. Riser Soil Cover Frame 1/2 in [13 mm] 1/2 in [13 mm] Place small amount of concrete [3,000 psi [20 MPa] (min)] to support and level manhole frame. DO NOT allow manhole frame to rest upon riser. Backfill (90% Proctor Density) 8 in [203 mm] 4 1/2 in [114 mm] Unless other traffic barriers are present, bollards shall be placed around access riser(s) in non-traffic areas to prevent inadvertent loading by maintenance vehicles. Manhole Frame & Cover Detail For Traffic Loading Areas NTS Cover Frame 48 in [1219 mm] Min. Backfill (90% Proctor Density) 3,000 psi [20 MPa] (min) Concrete #4 [13 mm] Rebar @ 6 in [152 mm] Each Way 30 in [762 mm] Riser 1/2 in [13 mm] 4 1/2 in [114 mm] 14 in [356 mm] 1/2 in [13 mm] Thick Expansion Joint Material If traffic loading (HS-25) is required or anticipated, a 4-foot [1.22 m] diameter, 14-inch [356 mm] thick reinforced concrete pad must be placed over the Stormwater Treatment System Riser to support and level the manhole frame, as shown. The top of riser pipe must be wrapped with compressible expansion joint material to a minimum 1/2-inch [13 mm] thickness to allow transfer of wheel loads from manhole cover to concrete slab. Manhole cover shall bear on concrete slab and not on riser pipe. The concrete slab shall have a minimum strength of 3,000 psi [20 MPa] and be reinforced with #4 [13 mm] reinforcing steel as shown. Minimum cover over reinforcing steel shall be 1-inch [25 mm]. Top of manhole cover and concrete slab shall be level with finish grade. Please see accompanied Aqua-Swirl specification notes. See Site Plan for actual System orientation. Approximate dry (pick) weight: 3800 lbs [1700 kg]. Backfill shall extend at least 18 inches [457 mm] outward from Swirl Concentrator and for the full height of the Swirl Concentrator (including riser) extending laterally to undisturbed soils. (See MH Detail Below) 1 1 As an alternative, 42 in [1067 mm] diameter, HS-20/25 rated precast concrete rings may be substituted. 14 in [356 mm] thickness must be maintained. XC-7 inlet/outlet pipe size ranges up to 42 in [1067 mm]. XC-7 chamber height may vary up to 156 in [3962 mm], depending on inlet/outlet pipe size. Orientation may vary from a minimum of 90 to a maximum of 180. Clockwise or counterclockwise orientation as needed. 2 3 3 2 102 in [2591 mm] 102 in [2591 mm] P42 in [P1067 mm] 2 Octagonal Base Plate P90 in [P2290 mm] 156 in [3962 mm] Varies Varies 5 [127 mm] MH Frame P30 in [P762 mm] Band Coupler by Manufacturer. (as needed) Riser Manhole Frame and Cover by Manufacturer. (See Details) Rim elevations to match finish grade. 90 in [2286 mm] Pipe coupling by Contractor. 12 in [305 mm] long Stub-out by Manufacturer. Pipe coupling by Contractor. 12 in [305 mm] long Stub-out by Manufacturer. 4 4 P90 in [P2286 mm] Optional inlet orientations available (See note 4) P42 in [P1067 mm] 180 Backfill Bedding Undisturbed soil 18 in [457 mm] 6 in [152 mm] Lifting Lugs Lifting Lugs StormTech888-892-2694 | WWW.STORMTECH.COM®Chamber System4640 TRUEMAN BLVDHILLIARD, OH 430261-800-733-7473DATE: DRAWN: DHPROJECT #: CHECKED: N/ATHIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION PROVIDED TO ADS UNDER THE DIRECTION OF THE SITE DESIGN ENGINEER OR OTHER PROJECT REPRESENTATIVE. THE SITE DESIGN ENGINEER SHALL REVIEW THIS DRAWING PRIOR TO CONSTRUCTION. IT IS THE ULTIMATERESPONSIBILITY OF THE SITE DESIGN ENGINEER TO ENSURE THAT THE PRODUCT(S) DEPICTED AND ALL ASSOCIATED DETAILS MEET ALL APPLICABLE LAWS, REGULATIONS, AND PROJECT REQUIREMENTS.DATEDRWCHKDESCRIPTIONTHE CONCOURSE -UNDERGROUND DETENTIONCARMEL, INSHEETOF25NOTES•MANIFOLD SIZE TO BE DETERMINED BY SITE DESIGN ENGINEER. SEE TECH NOTE #6.32 FOR MANIFOLD SIZING GUIDANCE.•DUE TO THE ADAPTATION OF THIS CHAMBER SYSTEM TO SPECIFIC SITE AND DESIGN CONSTRAINTS, IT MAY BE NECESSARY TO CUT AND COUPLE ADDITIONAL PIPE TO STANDARD MANIFOLDCOMPONENTS IN THE FIELD.•THE SITE DESIGN ENGINEER MUST REVIEW ELEVATIONS AND IF NECESSARY ADJUST GRADING TO ENSURE THE CHAMBER COVER REQUIREMENTS ARE MET.•THIS CHAMBER SYSTEM WAS DESIGNED WITHOUT SITE-SPECIFIC INFORMATION ON SOIL CONDITIONS OR BEARING CAPACITY. THE SITE DESIGN ENGINEER IS RESPONSIBLE FORDETERMININGTHE SUITABILITY OF THE SOIL AND PROVIDING THE BEARING CAPACITY OF THE INSITU SOILS. THE BASE STONE DEPTH MAY BE INCREASED OR DECREASED ONCE THIS INFORMATION ISPROVIDED.•NOT FOR CONSTRUCTION: THIS LAYOUT IS FOR DIMENSIONAL PURPOSES ONLY TO PROVE CONCEPT & THE REQUIRED STORAGE VOLUME CAN BE ACHIEVED ON SITE.PROPOSED ELEVATIONSMAXIMUM ALLOWABLE GRADE (TOP OF PAVEMENT/UNPAVED):839.70MINIMUM ALLOWABLE GRADE (UNPAVED WITH TRAFFIC):835.20MINIMUM ALLOWABLE GRADE (UNPAVED NO TRAFFIC):834.70MINIMUM ALLOWABLE GRADE (TOP OF RIGID CONCRETE PAVEMENT):834.70MINIMUM ALLOWABLE GRADE (BASE OF FLEXIBLE PAVEMENT):834.70TOP OF STONE:833.70TOP OF MC-7200 CHAMBER:832.7024" x 24" BOTTOM MANIFOLD INVERT:827.8924" x 24" BOTTOM MANIFOLD INVERT:827.8924" ISOLATOR ROW PLUS INVERT:827.8924" BOTTOM CONNECTION INVERT:827.89BOTTOM OF MC-7200 CHAMBER:827.70UNDERDRAIN INVERT:826.95BOTTOM OF STONE:826.95PROPOSED LAYOUT114STORMTECH MC-7200 CHAMBERS6STORMTECH MC-7200 END CAPS12STONE ABOVE (in)9STONE BELOW (in)40STONE VOID32998INSTALLED SYSTEM VOLUME (CF)(PERIMETER STONE INCLUDED)(COVER STONE INCLUDED)(BASE STONE INCLUDED)7712SYSTEM AREA (SF)592.1SYSTEM PERIMETER (ft)*INVERT ABOVE BASE OF CHAMBERMAX FLOWINVERT*DESCRIPTIONITEM ONLAYOUTPART TYPE2.26"24" BOTTOM PARTIAL CUT END CAP, PART#: MC7200IEPP24B / TYP OF ALL 24" BOTTOMCONNECTIONS AND ISOLATOR PLUS ROWSAPREFABRICATED END CAPINSTALL FLAMP ON 24" ACCESS PIPE / PART#: MC720024RAMPBFLAMP2.26"24" x 24" BOTTOM MANIFOLD, ADS N-12CMANIFOLD2.26"24" x 24" BOTTOM MANIFOLD, ADS N-12DMANIFOLD14.0 CFS OUTOCS (DESIGN BY ENGINEER / PROVIDED BY OTHERS)ECONCRETE STRUCTURE19.0 CFS IN(DESIGN BY ENGINEER / PROVIDED BY OTHERS)FCONCRETE STRUCTUREW/WEIR6" ADS N-12 DUAL WALL PERFORATED HDPE UNDERDRAINGUNDERDRAIN4" SEE DETAIL (TYP 4 PLACES)HINSPECTION PORTISOLATOR ROW PLUS(SEE DETAIL)PLACE MINIMUM 17.50' OF ADSPLUS175 WOVEN GEOTEXTILE OVER BEDDINGSTONE AND UNDERNEATH CHAMBER FEET FOR SCOUR PROTECTION AT ALLCHAMBER INLET ROWSBED LIMITS40'20'0266.92'29.10'255.95'26.50'CHDGBAFE StormTech888-892-2694 | WWW.STORMTECH.COM®Chamber SystemINSPECTION & MAINTENANCESTEP 1)INSPECT ISOLATOR ROW PLUS FOR SEDIMENTA.INSPECTION PORTS (IF PRESENT)A.1.REMOVE/OPEN LID ON NYLOPLAST INLINE DRAINA.2.REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLEDA.3.USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOGA.4.LOWER A CAMERA INTO ISOLATOR ROW PLUS FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL)A.5.IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.B.ALL ISOLATOR PLUS ROWSB.1.REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW PLUSB.2.USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW PLUS THROUGH OUTLET PIPEi)MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRYii)FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLEB.3.IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.STEP 2)CLEAN OUT ISOLATOR ROW PLUS USING THE JETVAC PROCESSA.A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERREDB.APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEANC.VACUUM STRUCTURE SUMP AS REQUIREDSTEP 3)REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS.STEP 4)INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM.NOTES1.INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUSOBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS.2.CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY.CATCH BASINORMANHOLEMC-7200 ISOLATOR ROW PLUS DETAILNTSSTORMTECH HIGHLY RECOMMENDSFLEXSTORM INSERTS IN ANY UPSTREAMSTRUCTURES WITH OPEN GRATESCOVER PIPE CONNECTION TO END CAP WITH ADSGEOSYNTHETICS 601T NON-WOVEN GEOTEXTILEMC-7200 CHAMBEROPTIONAL INSPECTION PORTMC-7200 END CAP24" (600 mm) HDPE ACCESS PIPE REQUIRED USEFACTORY PARTIAL CUT END CAP PART #:MC7200IEPP24B OR MC7200IEPP24BWONE LAYER OF ADSPLUS175 WOVEN GEOTEXTILE BETWEENFOUNDATION STONE AND CHAMBERS10.3' (3.1 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMSSUMP DEPTH TBD BYSITE DESIGN ENGINEER(24" [600 mm] MIN RECOMMENDED)INSTALL FLAMP ON 24" (600 mm) ACCESS PIPEPART #: MC720024RAMPNOTE:INSPECTION PORTS MAY BE CONNECTED THROUGH ANY CHAMBER CORRUGATION VALLEY.STORMTECH CHAMBER8" NYLOPLAST INSPECTION PORTBODY (PART# 2708AG4IPKIT) ORTRAFFIC RATED BOX W/SOLIDLOCKING COVERCONCRETE COLLARPAVEMENT12" (300 mm) MIN WIDTHCONCRETE SLAB6" (150 mm) MIN THICKNESS4" PVC INSPECTION PORT DETAIL(MC SERIES CHAMBER)NTSCONCRETE COLLAR NOT REQUIREDFOR UNPAVED APPLICATIONS4" (100 mm)SDR 35 PIPE4" (100 mm) INSERTA TEETO BE CENTERED ONCORRUGATION VALLEY4640 TRUEMAN BLVDHILLIARD, OH 430261-800-733-7473DATE: DRAWN: DHPROJECT #: CHECKED: N/ATHIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION PROVIDED TO ADS UNDER THE DIRECTION OF THE SITE DESIGN ENGINEER OR OTHER PROJECT REPRESENTATIVE. THE SITE DESIGN ENGINEER SHALL REVIEW THIS DRAWING PRIOR TO CONSTRUCTION. IT IS THE ULTIMATERESPONSIBILITY OF THE SITE DESIGN ENGINEER TO ENSURE THAT THE PRODUCT(S) DEPICTED AND ALL ASSOCIATED DETAILS MEET ALL APPLICABLE LAWS, REGULATIONS, AND PROJECT REQUIREMENTS.DATEDRWCHKDESCRIPTIONTHE CONCOURSE -UNDERGROUND DETENTIONCARMEL, INSHEETOF45