Loading...
HomeMy WebLinkAbout06080120 Sq. Ft. r' k. All sidewalks and driveways I. Sewer and water lines, septic system, (tanks & filed system) and/or well locations m. Drainage flow arrows n, All drainage swales and subsurface facilities (retention / detention areas, etc,,,) o. Sump pump -- Show sump pump pit(s) and discharge line locations p, Geothermal heat pump discharge locations *NOTE: If land is not within a platted subdivision, a legal description is required. "'\ 'O".tO' .. t . . FURTHER NOTES / NOTICES: . 1 } CARMEL ZONING ORDINANCE Z-289, SECTION 29.04,02 (3): "The Director shali approve or deny the Improvement Location Permit within five (5) working days of the receipt of the written application form and accompanying : materiais, The Improvement Location Permit shall be Issued when the proposed structure, improvement, or use 'and its location conform in all respects to this ordinance," } , } IN ADDmON TO THE ABOVE-LISTED SUBMmAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY ' INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT, OF COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED. . } ADDmONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR,! IF THE SUBMmED PLANS ARE NOT OF SUmOENT CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT OF THE WORK PROPOSED AND TO DffiRMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES. SUBMmAL OF ADDmONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INITIAL SUBMmAL, WILL EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW, . . } THE OFFICE OF BUILDING & ODDE ENFORCEMENT RECOGNIZES ANY ROOM/AREA, DESIGNATED ON ODNSTRUCTION PLANS AS A "BONUS ROOM" TO BE UNOCCUPIABLE. UNFINISHED SPACE. IF AN AREA SO LABELED IS TO BE A FINISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS DETERMINED THAT AN UNFINISHED, "BONUS ROOM" AREA IS TO BEODME A FINISHED AREA AFTER THE . ISSUANCE OF THE PERMIT. THE PLANS AND PERMIT RECORDS M!JSI BE UPDATED AT THE OFFICE OF BUILDING & ODDE ENFORCEMENT. . .."_ _ i ALL CONSTRUCTION IS SUBJECT TO FIELD INSPECTION, AND SHOULD NOT BEGIN PRIOR TO THE I ISSUANCE OF THE BUILDING PERMIT. ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED, INSULATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE INSPECTION, Beginning prior to obtaining a building pemnit and/or proceeding with construction beyond the stage of a required inspection without approval constitutes Late Fee penalties, per Z-289 of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29.06.08. I BVILDING & CODE ENFORCEMENT; C1lY OF CARMEL One Civic 5'1'; Carmel, I~ 46032. ph. (317) 571-24j\4, " . ,. r ,,\,,~.... ,Y.~" I I, the undersigned, certify that all of the above listed Information is shown completel'l'and accurately on the! attached plot or site plan(s), construction plans, and any other submitted documenl:c!tion/,submltted with the . building permit application to the City of Cahnel/ Clay Township Department of Community Services. I further certify that the joining of water supply piping shall be made with lead-free solders and fluxes. Failure to comply will result in a replac:ement of the system, (Plumbing Code P-S09-S) Under the penalties of Perjury (Indiana Code 35-44-2-1), ralso hereby affimn, under oath, that all of the infomnation I have provided in the table below is true and accurate, to the best of my knowledge and belief, and that I have not knowingly or intentionally provided or omitted any information that wouid tend to hide, obscure, or otherwise mislead the Dept, of Community Services regarding the truth of the matters addressed therein. BASEMENT lit Floor 2nd Floor 3rO Front Rear Total Sq. TOTAL (Finished and Floor Porch Porch or Ft. of I Unfinished) Sunroom Garages . Z,'Z-OO '2-ll $1- 2.dB-z... - 3ZO ISO <tOO 7,Q04 , ~~ (o-Z7-0{; APPLICANT'S SIGNATURE ~ AlICHA6L t!oc..U/61L NAME PRlNTED DATE S:Permlts/FORMS/RESIDENTIAL PROCEDURES I 2of2 I I I